Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Geotechnical Engineering Services (Bay Fill/Settlement Specialist)

Open
State & Local
Response DeadlineDue in 40 days

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

Emeryville, CA, 94608, USA

Set-Aside

NONE

Documents

This scope was carved out of 20261127006.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Professional Design Services For The Powell Street Sanitary Sewer Main Pipeline Rehabilitation Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 40 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 1 document on the prime contractFrom Professional Design Services For The Powell Street Sanitary Sewer Main Pipeline Rehabilitation Project
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Emeryville
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs geotechnical analysis and design recommendations for prime contractors on City of Emeryville sanitary sewer projects. Analyzes soil conditions to mitigate differential settlement in bay fill areas, provides technical specifications for pipe bedding and support systems, and develops recommendations for lowering final invert elevations at MH 21.000 to increase pipe slope. Requires California PE license. Delivers a geotechnical report and design recommendations integrated into the PS&E.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Federal
Consulting Services for Chino Basin Program Aquifer Replenishing Facilities Design
Solicitation # RFP-JV-26-013
The Inland Empire Utilities Agency is seeking engineering consulting services for the Chino Basin Program Aquifer Replenishing Facilities Design Project under solicitation RFP-JV-26-013. The scope of work encompasses seven primary tasks, including project initiation, data gathering, a 30 percent design level basis of design report, detailed design (60, 90, and 100 percent), and engineering support during the procurement and bid phases for injection and monitoring wells. The project is set as a Small Business set-aside, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone Small Businesses. Performance is located in California, with key construction milestones targeted for May 2028 and July 2029. The contract is a not-to-exceed agreement with a warranty period of at least one year following acceptance. Selection is based on a multi-stage process involving team qualifications, experience, and potential interviews, with final approval required by the IEUA Board of Directors. Deliverables must adhere to specific technical standards, including AutoCAD for designs, Bluebeam for reviews, and Class 1 AACE standards for cost estimates. The project must comply with various federal and state funding requirements, including the Davis-Bacon Act, the Endangered Species Act, and Buy America preferences for infrastructure materials. Invoicing is handled electronically via ACH on a monthly basis.
Inland Empire Utilities Agency

POSTED

about 3 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 541330
New
Federal
RFP-JV-26-014 Consulting Services for Chino Basin Program Purified Water Conveyance Design Project
Solicitation # EN25022.03 AND EN28004
The Inland Empire Utilities Agency is soliciting professional engineering consulting services for the Chino Basin Program Purified Water Conveyance Design Project. The scope of work includes project initiation, utility research, field investigations, and the development of a basis of design across multiple disciplines. The selected consultant will be responsible for creating detailed design drawings and reports at 30, 60, 90, and final design levels, as well as providing engineering support during the bid award process for the construction package. Key deliverables include construction schedules and Opinion of Probable Construction Cost estimates. This is a small business set-aside opportunity open to SBA certified Veteran Owned Small Businesses, Service-Disabled Veteran Owned Small Businesses, Women-Owned Small Businesses, and HUBZone Small Businesses. The contract is structured on a time and material basis with a not-to-exceed total amount, featuring a 50,000 dollar allowance for mitigation measures. Proposals are due by January 26, 2027, and will be evaluated based on a 100-point scale focusing on project success factors, communication, regulatory requirements, and implementation plans. The project must adhere to specific engineering design guidelines and federal and state grant funding requirements, including compliance with the Davis-Bacon Act and Build America Buy America standards.
Inland Empire Utilities Agency

POSTED

about 3 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 541330
New
SLED
Walk-In Evidence Freezer Room – Assessment & Planning Consulting Services for Sacramento Sheriff's Office (SSO)
Solicitation # 2026-RFP-0128
The County of Sacramento is seeking a qualified consultant firm to provide assessment and planning services for the Sacramento Sheriff's Office property and evidence warehouse walk-in freezer. The primary objective is to evaluate the current condition, performance, and remaining useful life of the freezer enclosure, refrigeration equipment, and supporting electrical and mechanical systems. The consultant must identify and compare repair, upgrade, and full replacement alternatives using planning-level cost estimates and recommend a solution that aligns with the Edward Byrne Memorial Justice Assistance Grant (JAG) funding and timelines. The scope includes a Phase 1 assessment report and the potential for optional Phase 2 services to produce bid-ready construction documents. The project must be completed within 90 days of contract execution, with an initial consultation meeting scheduled within two weeks of the award and bi-weekly progress updates. The consultant must ensure compliance with California Penal Code Section 1417.5, California Department of Justice standards, IAPE best practices, and NIST recommendations. Because the equipment is funded via a federal grant, the Buy American Act and NEPA rules apply. Award selection will be based on factors other than price alone, focusing on firm experience, team qualifications, and project approach. Payment is facilitated through the County's Virtual Card Program in partnership with U.S. Bank. There is no specified set-aside status for this solicitation.
DGS: CAPSD - Procurement

POSTED

about 4 hours ago

DEADLINE

in 21 days
View Details
NAICS: 541330
New
SLED
Professional Design Services For The Powell Street Sanitary Sewer Main Pipeline Rehabilitation Project
Solicitation # 20261127006
The City of Emeryville is seeking professional design services for the Powell Street Sanitary Sewer Main Pipeline Rehabilitation Project. The scope of work involves the full replacement of the gravity sewer main from MH 21.100.27 to MH 21.000.00, with a focus on mitigating differential settlement caused by bay fill soil and increasing pipe slope by lowering the final invert elevation at MH 21.000. The selected engineering team will be responsible for delivering Plans, Specifications, and Estimates (PS&E), developing public outreach plans, and coordinating connections with the EBMUD North Interceptor pipeline, as well as collaborating with Caltrans and other agencies. Proposals are due by January 6, 2027, and will be evaluated based on technical experience with sewer main design in soft soil conditions, project approach, experience coordinating with EBMUD, and methods for maintaining budget and schedule. The selection process may include shortlisting and interviews before negotiating a not-to-exceed price contract. The project requires adherence to the City's standard professional services contract, including insurance requirements and compliance with Emeryville Municipal Code regarding minimum wage and living wage ordinances. Design submittals are required at 30%, 60%, 90%, and final design phases. There is no set-aside status for this solicitation.
City of Emeryville

POSTED

about 5 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS