Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Geotechnical Engineering Services

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Geotechnical Engineering Services involves performing soil analysis and subsurface investigations for prime contractors working on City of Redwood City sewer projects. The scope of work focuses on Sewer Basins 3 and DT, where the contractor will conduct soil borings and testing to ensure stability for the installation of 6-18 inch pipes. Utilizing drilling rigs and sampling equipment, the selected provider will offer critical recommendations for bedding materials and trench shoring. The project requires the contractor to hold a Professional Geologist or Professional Engineer license to deliver a formal Geotechnical Report and soil recommendations for construction specifications. This opportunity is located in Redwood City, California, under NAICS code 541330, with a response deadline of November 10, 2026.

General Info

Place of Performance

Redwood City, CA, 94063, USA

Set-Aside

NONE

Documents

This scope was carved out of 20261017029.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Annual Sanitary Sewer Replacement Project (Sewer Basins 3 And Dt)

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → CITY OF REDWOOD CITY
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs soil analysis and subsurface investigations for prime contractors on City of Redwood City sewer projects. Conducts soil borings and testing to determine stability for 6-18" pipe installation in Sewer Basins 3 and DT. Provides recommendations for trench shoring and bedding materials using drilling rigs and sampling equipment. Requires PG or PE license. Delivers a Geotechnical Report and soil recommendations for construction specifications.

Similar Contracts

Same NAICS industry code

More opportunities from California → CITY OF REDWOOD CITY

Same awarding agency

NAICS: 541330
New
SLED
Annual Sanitary Sewer Replacement Project (Sewer Basins 3 And Dt)
Solicitation # 20261017029
The City of Redwood City is soliciting proposals for a qualified engineering consultant to provide design services for the Annual Sanitary Sewer Replacement Project focusing on Sewer Basins 3 and DT. The scope of work includes developing plans, specifications, and cost estimates for the repair or replacement of sanitary sewer pipelines with 6- to 18-inch diameters that exhibit structural grade 4 and 5 deficiencies according to NASSC PACP standards. Key responsibilities include surveying, utilities research, topographic base mapping, geotechnical investigations, and the delivery of final design documents in native AutoCAD, Word, and Excel formats, as well as as-built record drawings. The selection process is based on the most qualified firm, evaluating proposal quality, experience, capacity, and the proposed scope of work. Cost proposals must be submitted in a separately sealed envelope and will only be opened after the evaluation of technical proposals. The project follows a strict timeline, with the consultant contract award expected in December 2026, design submittals occurring between March and May 2027, and construction completion targeted for December 2027. The selected consultant must comply with California Labor Code prevailing wage requirements and the False Claims Act. Payment is subject to a 10 percent retention until all services are accepted as complete. Proposals are due by November 10, 2026, and must adhere to a 30-page limit and specific submission formats, including three spiral-bound hard copies and one USB drive.
Engineering Services

POSTED

about 17 hours ago

DEADLINE

in 22 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS