Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Vermont was posted on August 11, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Geotechnical Site Investigation and Analysis

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Electrical Engineering Services, Recreation Center Door Holders
Solicitation # 26-087-RFP
The City of West Sacramento is soliciting proposals for electrical engineering design services to install magnetic door holders on fire-rated doors at eight locations within the Recreation Center (Building K) at 2801 Jefferson Blvd. The selected design professional in general responsible charge will be tasked with tying these devices into the existing campus fire alarm system. The scope of work is divided into five primary tasks: project initiation and field verification, code analysis and DSA coordination, creation of permit-ready construction documents, exemption documentation, and construction phase services, which include reviewing contractor submittals and coordinating with a DSA-certified project inspector. The project must comply with Title 24 and CSFM listings, though it is expected to qualify for exemption from DSA plan review under IR A-22 Section 4.1.1. The solicitation, numbered 26-087-RFP, requires proposals to be submitted via the City's e-Procurement Portal by November 20, 2026, at 2:00 pm. Submissions are limited to ten pages and must include a transmittal letter, a technical project approach, and a cost proposal using the provided electronic rate sheet. The City utilizes a qualifications-based evaluation process, weighting proven ability at 37.5%, proposer qualifications at 25%, technical approach at 18.8%, and acceptance of the standard contract at 6.3%, with cost evaluated separately for the highest-ranked proposers. This contract is subject to federal and state regulations, including 2 C.F.R. § 200.326, prevailing wage requirements under Labor Code section 1720, and compliance with state apprentice employment laws.
Capital Projects - Construction

POSTED

about 15 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
SLED
RFQ 484-111626 ICE Services in Support of Alternative Delivery and Public-Private Partnership Projec
Solicitation # PE-48401-RFQ-2027-000000632
The Georgia Department of Transportation is soliciting a qualified firm to provide Independent Cost Estimator (ICE) services for Alternative Delivery and Public-Private Partnership (P3) projects statewide. The selected firm will act as an independent advisor, providing cost estimates, risk and value analysis, and construction schedule reviews for delivery methods including Design-Build, Construction Manager/General Contractor, and Comprehensive Development Agreements. Key responsibilities include validating and participating in cost negotiations with developer teams and ensuring no organizational conflicts of interest exist with any contractors under review. The selection process is a multi-phase evaluation consisting of a Statement of Qualifications (60% of the total score) and a Technical Approach (40% of the total score). Phase I focuses on the experience of the Project Manager and Key Team Leaders, resource capacity, and prime consultant past performance. Phase II evaluates the firm's specific technical methodology for pricing risks and maintaining quality assurance. The contract is structured as a multi-phase, project-specific agreement with potential payment models including cost plus fixed fee, cost per unit of work, or specific rates of compensation. To be eligible, the prime consultant must employ the Principal, Project Manager, and Lead Estimator, with the Project Manager requiring a degree in Civil Engineering, Construction Management, or a related field. Firms must maintain an accounting system compliant with FAR Part 31, and those with aggregate contracts exceeding 250,000 dollars must provide an annual CPA overhead audit. Submissions must be delivered in PDF format by the November 16, 2026, deadline and include notarized certification forms and the Georgia Security and Immigration Compliance Act Affidavit.
Department of Transportation-2

POSTED

about 18 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The Geotechnical Site Investigation and Analysis subcontract, issued by the Vermont Department of Economic Development, involves performing soil analysis and foundation assessments for culvert replacement projects in the Town of Shelburne. The selected provider will be responsible for evaluating soil conditions, analyzing load-bearing capacities, and assessing soil stability through the use of geotechnical testing equipment and soil sampling tools. The final deliverable for this engagement is a comprehensive geotechnical report that includes detailed soil boring logs and specific foundation recommendations. To qualify for this contract, providers must hold a Professional Engineer registration and maintain professional liability insurance. The opportunity was posted on August 11, 2026, with a response deadline of September 11, 2026. This subcontract falls under NAICS code 541330 and is designed to support prime contractors in ensuring the structural integrity of culvert foundations.

General Info

Geotechnical soil analysis and foundation reports for Shelburne culvert projects by registered engineers.

Place of Performance

VT, USA

Set-Aside

NONE

Documents

This scope was carved out of 75049.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

ENGINEERING AND PERMITTING FOR CULVERT REPLACEMENT

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVermont → Department of Economic Development
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs soil analysis and foundation assessment for prime contractors on Town of Shelburne culvert replacement projects. Assesses soil conditions, analyzes load-bearing capacity for culvert foundations, and evaluates soil stability using soil sampling tools and geotechnical testing equipment. Requires Professional Engineer (PE) registration and professional liability insurance. Delivers a geotechnical report with soil boring logs and foundation recommendations.

More opportunities from Vermont → Department of Economic Development

Same awarding agency

NAICS: 541620
New
SLED
Addison County Brownfield Assessment Request For Qualifications
Solicitation # 76195
The Addison County Regional Planning Commission is seeking a Qualified Environmental Professional consulting or planning firm to implement a United States Environmental Protection Agency Community-Wide Assessment Brownfields grant. With a total contractual budget of 450,000 dollars, the selected firm will provide project management, grant administration, and community outreach, alongside technical services including the expansion of the regional brownfields inventory and the execution of Phase I and Phase II Environmental Site Assessments. The scope of work involves coordinating with EPA Region 1, the Vermont Department of Environmental Conservation, and local municipalities to develop cleanup and reuse strategies for priority properties within Addison County, Vermont. Eligible applicants must be registered in the System for Award Management and adhere to 2 CFR Part 200 guidelines and CERCLA Section 104(k) requirements. Proposals are evaluated on a 100-point scale focusing on project approach, experience and capabilities, key personnel expertise, technical knowledge, and cost. The successful contractor must provide a fee schedule with prices fixed for at least 24 months, and the contract is expected to be signed by December 4, 2026. Proposals must be submitted electronically to Andrew L'Roe by October 21, 2026, and must strictly adhere to the ten-page limit and specific formatting requirements.
Environmental Consulting Services

POSTED

about 23 hours ago

DEADLINE

in 16 days
View Details
NAICS: 238160
New
SLED
MIL DEPT - VT Veterans Memorial Maintenance Shop Roof Replacement
Solicitation # 77226
The State of Vermont Military Department is soliciting bids for the roof replacement of the Vermont Veterans Memorial Maintenance Shop located at the Vermont Veterans Cemetery in Randolph, Vermont. The scope of work includes the full replacement of the roof and the relocation of the liquid propane gas line, following the plans and specifications provided by Centerline Architects dated September 28, 2026. If weather conditions prevent full completion in 2026, the contractor is required to perform temporary patching to prevent water infiltration. Bids must be submitted electronically as a single searchable PDF to the designated email address by November 19, 2026. Award decisions will be based on compliance with specifications, price, delivery time, and the intended purpose of the services. Favorable consideration will be given to bidders who demonstrate business practices promoting clean energy and addressing climate change for bids exceeding 25,000 dollars. The contract requires comprehensive bonding, including a 5 percent bid bond and 100 percent performance, payment, and guaranty bonds. Additionally, the contractor must comply with Vermont prevailing wage laws, carry builder's risk insurance, and adhere to prohibitions against Russian-sourced goods. Depending on the final contract value, additional requirements may include M/WBE reporting for projects over 50,000 dollars, contractor evaluations for projects over 100,000 dollars, and specific workers' compensation compliance for projects exceeding 250,000 dollars.
Roofing Contractors

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS