Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

GETTYSBURG PIKE SANITARY SEWER REPLACEMENT PROJECT

Open
12691159State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Gettysburg Pike Sanitary Sewer Replacement Project, managed by Cumberland County, Pennsylvania, involves the replacement of approximately 135 lineal feet of sanitary sewer with new 6- and 8-inch PVC piping. The work is located within the rights-of-way and paved areas of Lisburn Road (S.R. 2004) in Upper Allen Township and includes the installation of two new manholes using owner-furnished frames and covers. The project is governed by EJCDC C-700 Standard General Conditions and requires strict adherence to EPA and DEP regulations for material disposal, PADEP Erosion and Sediment Control guidelines, and Pennsylvania Department of Transportation standards for traffic control and safety devices. The contract will be awarded to the responsible bidder submitting the lowest responsive bid based on the total bid amount. Bidders must possess at least five years of experience and have completed ten similar projects. Required submissions include a bid bond or certified check for 10 percent of the bid total, a qualification statement (EJCDC C-451) with supporting experience and financial data, and evidence of authority to do business in the state. Performance and payment bonds are required prior to award. All labor must comply with the Pennsylvania Prevailing Wage Act, and the project must adhere to ADA accessibility guidelines. There is no specified set-aside status for this solicitation.

General Info

Cumberland County project to replace sanitary sewer piping and manholes in Pennsylvania.

Place of Performance

Cumberland County, PA, USA

Set-Aside

NONE

Documents

2
PDF, High priority: read this firstifb
High
PDF, High priority: read this firstspecifications
High

Read all 2 documents

Due in 26 days

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 26 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 2 solicitation documentsRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyPennsylvania → Cumberland County
ContactsNo contacts available
OfficeCumberland County, PA, USA
Office AddressCumberland County, PA, USA
ContactsNo contact information available

Interested Companies (33)

AdminLoginCore
Allgyer Enterprises
Barrasso Excavation

See All 33 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
Ref. #: Upper Allen Township, Cumberland County
This project generally consists of the replacement of approximately 135 lineal feet of sanitary sewer with new 6- and 8-inch PVC piping in rights-of-way and paved areas Lisburn Road (S.R. 2004) within Upper Allen Township. Work also includes installing two (2) new manholes, and owner furnished frames and covers. The work shall include installation of the piping, new manholes and all other appurtenances as shown on the drawings and as specified.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
The Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project in Oakland, California, is a comprehensive infrastructure effort for the East Bay Municipal Utility District. The scope of work involves the rehabilitation of open and covered concrete structures, including resurfacing and the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, the installation of valves and piping appurtenances, and the modification of sluice and slide gates. Additionally, the project requires the rehabilitation of reactor mixers and aerators, the replacement of motor control center components, and the installation of new electrical and instrumentation systems. Support services include the operation of a temporary 11 MGD pumped bypass, lead abatement, excavation, trench work, and surveying. This solicitation is set aside for Small Business (SB), including SBA certified Veteran Owned Small Business (VOSB), Service-Disabled Veteran Owned Small Business (SDVOSB), Women-Owned Small Business (WOSB), and HUBZone Small Business (HUBZone SB). Garney Pacific, Inc. is seeking qualified subcontractors, specifically targeting those with DBE, MBE, WBE, and SBE certifications. All subcontractors must utilize union labor and be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company. Quotes are due by November 17, 2026, with a final bid date of November 18, 2026.
Garney Pacific, Inc.

POSTED

about 8 hours ago

DEADLINE

in 12 days
View Details

More opportunities from Pennsylvania → Cumberland County

Same awarding agency

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS