Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Texas was posted on September 25, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

GHA Oleanders at Broadway - Site Drainage Improvement (Re-Bid)

Closed
6ab5923a617b3a52c3dbe5eaState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for labor, materials, and services for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as number 2027-027, is open to various SBA-certified small business categories, including Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves extensive sanitary sewer infrastructure improvements, including the open-cut installation of PVC and Ductile Iron Pipe ranging from 6 to 30 inches in diameter, as well as 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional requirements include the installation of standard and doghouse manholes, interior drop assemblies, a CSO regulator fit out, and an outfall. Site preparation tasks involve clearing and grubbing over 5,100 square yards of wooded areas, seeding, fine grading, and select tree removal. Critical project deliverables include the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP), geotechnical instrumentation and monitoring, and the continuous maintenance of flows and bypass during construction. Special requirements for this contract include the procurement of railroad insurance. The project involves significant excavation, with specific provisions for extra depth excavation between 4 and 10 feet, as well as depths exceeding 10 feet.
Cleary Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in 22 days

AI Contract Overview

Show more

The Galveston Housing Authority is seeking bids for the GHA Oleanders at Broadway Site Drainage Improvement project located in Houston, Texas. The scope of work involves comprehensive drainage enhancements, including the removal and replacement of concrete pavers to ensure positive drainage, the installation of storm drain lines and connections, the implementation of underground storage, and general grading. Because the project takes place at an occupied site, the general contractor must prioritize resident safety and ensure that site operations continue without disruption. Interested parties must submit their responses by October 21, 2026. The primary point of contact for this solicitation is Juarez White.

General Info

Galveston Housing Authority seeks bids for drainage improvements at Oleanders at Broadway by 10/21/2026.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → Galveston Housing Authority (GHA)
Contacts1 person available
OfficeN/A

Full Description

Show more
The scope for the project will include for drainage improvements that will consist of removing and replacing existing concrete pavers to provide positive drainage, installation of storm drain lines w/connections, installation of underground storage, and grading. GC must note that the Oleander’s site is an occupied site so continued site operation and resident safety will be paramount.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS