Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Agriculture was posted on February 26, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Gillete Boat Launch Replacement

Closed
1240BJ25R0002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

237

Place of Performance

Colville, WA, USA

Set-Aside

SBA

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Response Deadline

Deadline has passed

Posted

Solicitation

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Colville National Forest
Contacts1 person available
OfficeCOLVILLE, WA, 99114, USA
Office AddressCOLVILLE, WA, 99114, USA
Contacts
Andrea Murphy

Full Description

Show more

BOAT RAMP REPLACEMENT: the scope is to replace the failing existing concrete plank ramp with a concrete boat ramp panel system. This work consist of removing and resetting 60 feet long x 8 feet wide floating dock, installing approximate 150 feet erosion control mechanism (silt curtain), sawcut existing pavement, removing approximately 3 cubic yards existing asphalt concrete, removing an existing 30 feet long x 12 feet wide concrete plank boat ramp, excavating grading 45 cubic yards of embankment, placing 100 square yards geotextile type II, placing and compacting 6 inch layer aggregate, 15 cubic yards government source, erecting and installing panel steel rail system, placing nine 4 feet long x 14 feet wide x 8 inch thick concrete panels, wrapping the new boat ramp with keyed class 2 riprap and finally placing and compacting 2 inch thick asphalt concrete payment, approximately 7 ton, matching existing to proposed grades.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS