Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Gilly Lane and Vicinity Pipeline Replacement Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Gilly Lane and Vicinity Pipeline Replacement Project, managed by the Contra Costa Water District, involves replacing approximately 0.9 miles of aging water main infrastructure across five suburban streets in Concord, California, including Gilly Ln, Gilardy Dr, Julie Ct, Picadilly Ct, and Lambeth Ln. The scope of work focuses on upgrading high-risk 4-inch cast iron and various asbestos cement pipes installed in the 1960s. Key deliverables include the installation of one new hydrant, the replacement of seven existing hydrants, and the abandonment of old lines according to district standards. Construction is scheduled to take place over eight months between June 2026 and March 2027. Technical requirements include digging trenches approximately two feet wide and four feet deep with mandatory shoring and nightly coverage using metal trench plates. Site restoration will involve backfilling with aggregate base or excavated soils and reconstructing asphaltic concrete pavement to meet City of Concord standards. Environmental compliance is managed under CEQA and NPDES permits, with specific mandates for the dechlorination of up to 13,800 gallons of treated water during line flushing. Project logistics include a two-week closure of two southbound lanes on Oak Grove Rd and a corresponding lane shift in the northbound lanes. All construction activities require a City of Concord encroachment permit and strict adherence to hazardous material and waste disposal protocols.

General Info

Contra Costa Water District replacing 0.9 miles of water mains in Concord, June 2026.

Agency

California → Contra Costa Water District

Place of Performance

Concord, CA, 94518

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Contra Costa Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Contra Costa Water District
Office AddressN/A

Full Description

Show more
The Project will replace approximately 0.9 miles of existing water main infrastructure on five suburban streets in Concord, CA. The purpose of the project is to upgrade aging water infrastructure by replacing water mains and hydrants in the neighborhood. This aging infrastructure includes sections of high-risk 4-inch cast iron pipe and 4-inch, 6-inch, and 8-inch asbestos cement pipe that was installed in the 1960s. In addition to the 0.9 miles of water line that will be replaced, one new hydrant will be installed, and seven existing hydrants will be replaced. The Project is entirely within the existing CCWD treated water service boundary and will not result in an expansion of service. Construction is anticipated to occur between June 2026 and March 2027, with an expected duration of 8 months. The pipes will be transported in 20-foot sections to the project area and stored in small piles throughout the work area to reduce disruptions to pedestrian and vehicular circulation. As the Project will be under construction for a few days in front of each residence, the 20-foot sections of pipe will typically be stationed in one place for a maximum of one week at a time. Upon replacement, the existing lines will be abandoned in place per CCWD standards. No disruption will occur from pipe removal.

Similar Contracts

Same NAICS industry code

Research this forecast and prepare for the solicitation

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS