This Solicitation opportunity from Washington was posted on September 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Glenwood & Goldendale Electrical Upgrades 2026, Department of Natural Resources, Klickitat County, WA #DNR-26-R17

Closed
DNR-26-R17State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
SLED
Existing Generators Replacement Aguadilla, PR
Solicitation # 872298
This project involves the complete replacement of two existing power generators at the Aguadilla Detention Facility in Aguadilla, Puerto Rico. The scope of work requires the installation of one 100 kW and one 150 kW Perkins diesel generator, both featuring stainless-steel enclosures to protect against salt air and moisture. The installation includes two new NEMA 3R automatic transfer switches, securing the units to the existing concrete slab with Grade 5 or higher galvanized anchor bolts, and performing comprehensive generator load tests. The project is estimated to have a magnitude between $250,000 and $300,000, with a total period of performance of 270 calendar days from the Notice to Proceed. The contract is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) IDIQ. Award will be based solely on the lowest total evaluated price, provided the offeror demonstrates technical understanding, a sound implementation approach, and a robust safety and quality control program. Key compliance requirements include adherence to the Buy American Act, Davis-Bacon prevailing wage rates per determination PR20260001, and strict security protocols, including PIV card issuance and non-disclosure agreements for personnel. All work must be performed during regular business hours, Monday through Friday, and must comply with NFPA 70, the International Building Code, and NEC Article 445.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
SLED
LED Lighting and Occupancy Sensor Upgrades DRAFT
Solicitation # 872291
The LED Lighting and Occupancy Sensor Upgrade project is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) for the Buffalo Federal Detention Facility in Batavia, New York. The project involves providing all engineering, labor, equipment, and materials to upgrade the facility with energy-efficient LED lighting fixtures and occupancy sensors, including the removal and disposal of existing fluorescent fixtures, lamps, and ballasts. The estimated magnitude of the contract is between 2 million and 2.3 million dollars, with a period of performance of 180 calendar days from the notice to proceed. Award will be based solely on the lowest total evaluated price. The contractor is required to adhere to Davis-Bacon Act wage determinations and comply with standards from OSHA, ADA, NFPA, and the International Building Code. Key deliverables include a Quality Control Plan due within 15 days of award, a site survey within 30 days, and a final closeout package consisting of as-built drawings, warranty documentation, and 5 percent attic stock. The contractor must also provide a minimum two-hour training session for facility maintenance personnel and a detailed commissioning report verifying that 100 percent of fixtures and controls were tested. Payment requests must be submitted electronically via the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
SLED
Conex Offices for Forensics Personnel - St. Thomas
Solicitation # 872300
This project involves a Firm-Fixed-Price task order under an 8(a) Multiple Award Construction Contract for the provision and installation of two 40ft steel FLEXTAINER conex offices for forensics personnel at the St. Thomas HSI Facility in the US Virgin Islands. The scope of work includes the construction of 3k PSI reinforced concrete slabs, installation of the units, and equipping each office with two split-system A/C units, R-11 insulation, vinyl flooring, LED lighting, and a steel door with a Cypher lock. Each unit must also include four security windows and a 5-pound ABC fire extinguisher. Electrical connectivity must be established via 2-inch PVC or uPVC conduit to the nearest circuit. The contract has an estimated magnitude between 250,000 and 300,000 dollars, with a period of performance of 364 calendar days from the Notice to Proceed. Award will be based on the lowest total evaluated price, considering technical approach, safety, and quality control plans. Key requirements include compliance with the Buy American Act, adherence to Davis-Bacon prevailing wage rates for the Virgin Islands, and strict security protocols, including the signing of DHS Non-Disclosure Agreements and mandatory cybersecurity training. Contractors must conduct a site survey prior to proposal submission and provide a detailed project schedule within 15 days of the Notice to Proceed. All invoicing must be processed through the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
IE JCC Fire Alarm Repairs
Solicitation # Inland Empire Fire Alarm Deficiencies (169706,169708,169733,169736 & 16937)
Management & Training Corporation (MTC), operator of the Inland Empire Job Corps Center in San Bernardino, California, is soliciting subcontractor bids for a fixed-price, single lump sum contract to address fire alarm deficiencies. The scope of work includes the installation of manual pull stations, horn/strobe notification appliances, and the replacement of six existing fire alarm bells with new horn/strobe units. All new devices must be integrated into the existing fire alarm system and undergo complete functional testing. The project must be completed within 90 consecutive business days following a written Notice to Proceed, with work beginning within five business days of an agreed-upon start date. Bids are due by 3:00 pm PT on September 16, 2026. Submissions must include the MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, a completed MTC Supplier Packet (W-9, self-certification, and terms acceptance), and proof of insurance. For bids equal to or greater than $25,000, a bid bond guarantee of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds totaling 100% of the contract price. The contract is subject to Construction Wage Rate Requirements (CWRR), requiring compliance with California prevailing wage determinations and the submission of weekly certified payroll. Award will be based on overall best value.
Inland Empire Job Corps

POSTED

about 11 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The Glenwood and Goldendale Electrical Upgrades 2026 project, solicitation number DNR-26-R17, involves comprehensive electrical improvements across four distinct sites for the Washington State Department of Natural Resources. At Glenwood, work includes circuit tracing, panel schedule updates, exhaust fan replacement, freeze protection heater installation, and a panel replacement at SE0802 with new feeders and consolidated wiring. At Goldendale, the scope entails installing a new 200A panel at SE0901, upgrading to a wall-mounted tankless water heater, and replacing exterior lighting. Additional work at Goldendale SE0902 focuses on circuit labeling, breaker replacements, and the installation of GFCI breakers to ensure code compliance and operational performance. The project is managed by Project Manager Karin Williams. A pre-bid meeting is scheduled for August 19, with sessions at both the Glenwood and Goldendale locations. Interested parties must submit their responses by the deadline of August 31, 2026. These upgrades are designed to modernize electrical distribution, enhance safety through improved lighting and GFCI protection, and ensure all systems are properly labeled and grounded.

General Info

Electrical upgrades for Washington DNR at Glenwood and Goldendale sites by August 31, 2026.

Agency

Washington → WA State DNR Public WorksView Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

Olympia, WA, 98504-7031, USA

Set-Aside

NONE

Documents

(199)

Addendum #1 Plans - Page 1.jpg

JPG

Addendum #1 Plans - Page 6.jpg

JPG

Specs - Page 110.jpg

JPG

Bid Tabulation - Page 1.jpg

JPG

Specs - Page 78.jpg

JPG

Specs - Page 57.jpg

JPG

Specs - Page 159.jpg

JPG

Plans - Page 7.jpg

JPG

Specs - Page 94.jpg

JPG

Specs - Page 122.jpg

JPG

Specs - Page 10.jpg

JPG

Specs - Page 22.jpg

JPG

Specs - Page 33.jpg

JPG

Specs - Page 145.jpg

JPG

Specs - Page 5.jpg

JPG

Addendum #1 - Page 1.jpg

JPG

Addendum #1 Plans - Page 8.jpg

JPG

Specs - Page 48.jpg

JPG

Specs - Page 152.jpg

JPG

Specs - Page 68.jpg

JPG

Specs - Page 69.jpg

JPG

Specs - Page 139.jpg

JPG

Specs - Page 97.jpg

JPG

Addendum #1 - Page 7.jpg

JPG

Plans - Page 4.jpg

JPG

Specs - Page 61.jpg

JPG

Specs - Page 2.jpg

JPG

Specs - Page 38.jpg

JPG

Addendum #1 - Page 9.jpg

JPG

Specs - Page 73.jpg

JPG

Specs - Page 42.jpg

JPG

Specs - Page 140.jpg

JPG

Specs - Page 34.jpg

JPG

Specs - Page 19.jpg

JPG

Specs - Page 167.jpg

JPG

Specs - Page 23.jpg

JPG

Specs - Page 126.jpg

JPG

Specs - Page 59.jpg

JPG

Specs - Page 149.jpg

JPG

Specs - Page 106.jpg

JPG

Addendum #1 Plans - Page 7.jpg

JPG

Specs - Page 115.jpg

JPG

Specs - Page 51.jpg

JPG

Specs - Page 62.jpg

JPG

Specs - Page 60.jpg

JPG

Specs - Page 9.jpg

JPG

Specs - Page 108.jpg

JPG

Specs - Page 164.jpg

JPG

Specs - Page 162.jpg

JPG

Specs - Page 12.jpg

JPG

Specs - Page 46.jpg

JPG

Specs - Page 114.jpg

JPG

Specs - Page 127.jpg

JPG

Specs - Page 137.jpg

JPG

Specs - Page 129.jpg

JPG

Specs - Page 144.jpg

JPG

Addendum #1 - Page 2.jpg

JPG

Specs - Page 95.jpg

JPG

Specs - Page 39.jpg

JPG

Specs - Page 81.jpg

JPG

Specs - Page 125.jpg

JPG

Addendum #1 Plans - Page 9.jpg

JPG

Specs - Page 121.jpg

JPG

Plans - Page 10.jpg

JPG

Addendum #1 - Page 8.jpg

JPG

Specs - Page 47.jpg

JPG

Specs - Page 41.jpg

JPG

Specs - Page 151.jpg

JPG

Specs - Page 31.jpg

JPG

Specs - Page 75.jpg

JPG

Specs - Page 88.jpg

JPG

Specs - Page 143.jpg

JPG

Specs - Page 35.jpg

JPG

Specs - Page 65.jpg

JPG

Specs - Page 93.jpg

JPG

Specs - Page 146.jpg

JPG

Specs - Page 13.jpg

JPG

Specs - Page 53.jpg

JPG

Specs - Page 29.jpg

JPG

Specs - Page 8.jpg

JPG

Specs - Page 54.jpg

JPG

Addendum #1 Plans - Page 2.jpg

JPG

Specs - Page 24.jpg

JPG

Specs - Page 26.jpg

JPG

Specs - Page 102.jpg

JPG

Specs - Page 118.jpg

JPG

Specs - Page 21.jpg

JPG

Specs - Page 150.jpg

JPG

Specs - Page 147.jpg

JPG

Specs - Page 18.jpg

JPG

Specs - Page 56.jpg

JPG

Addendum #1 - Page 3.jpg

JPG

Specs - Page 161.jpg

JPG

Addendum #1 Plans - Page 3.jpg

JPG

Specs - Page 154.jpg

JPG

Addendum #1 - Page 6.jpg

JPG

Specs - Page 16.jpg

JPG

Specs - Page 107.jpg

JPG

Specs - Page 71.jpg

JPG

Specs - Page 50.jpg

JPG

Specs - Page 91.jpg

JPG

Specs - Page 72.jpg

JPG

Specs - Page 128.jpg

JPG

Specs - Page 136.jpg

JPG

Specs - Page 92.jpg

JPG

Specs - Page 80.jpg

JPG

Specs - Page 119.jpg

JPG

Specs - Page 116.jpg

JPG

Specs - Page 131.jpg

JPG

Specs - Page 120.jpg

JPG

Specs - Page 109.jpg

JPG

Specs - Page 20.jpg

JPG

Specs - Page 28.jpg

JPG

Specs - Page 4.jpg

JPG

Specs - Page 77.jpg

JPG

Specs - Page 30.jpg

JPG

Specs - Page 76.jpg

JPG

Specs - Page 157.jpg

JPG

Specs - Page 43.jpg

JPG

Specs - Page 85.jpg

JPG

Specs - Page 138.jpg

JPG

Specs - Page 113.jpg

JPG

Specs - Page 64.jpg

JPG

Plans - Page 6.jpg

JPG

Specs - Page 148.jpg

JPG

Plans - Page 8.jpg

JPG

Specs - Page 84.jpg

JPG

Specs - Page 142.jpg

JPG

Specs - Page 3.jpg

JPG

Specs - Page 160.jpg

JPG

Addendum #1 Plans - Page 10.jpg

JPG

Specs - Page 90.jpg

JPG

Addendum #1 - Page 4.jpg

JPG

Addendum #1 Plans - Page 5.jpg

JPG

Specs - Page 155.jpg

JPG

Specs - Page 7.jpg

JPG

Specs - Page 156.jpg

JPG

Specs - Page 37.jpg

JPG

Specs - Page 83.jpg

JPG

Plans - Page 1.jpg

JPG

Specs - Page 87.jpg

JPG

Specs - Page 130.jpg

JPG

Specs - Page 1.jpg

JPG

Specs - Page 63.jpg

JPG

Specs - Page 111.jpg

JPG

Specs - Page 158.jpg

JPG

Specs - Page 134.jpg

JPG

Addendum #1 Plans - Page 4.jpg

JPG

Specs - Page 89.jpg

JPG

Specs - Page 25.jpg

JPG

Specs - Page 32.jpg

JPG

Specs - Page 67.jpg

JPG

Specs - Page 99.jpg

JPG

Specs - Page 96.jpg

JPG

Specs - Page 70.jpg

JPG

Specs - Page 17.jpg

JPG

Specs - Page 49.jpg

JPG

Specs - Page 55.jpg

JPG

Specs - Page 135.jpg

JPG

Plans - Page 2.jpg

JPG

Specs - Page 101.jpg

JPG

Specs - Page 166.jpg

JPG

Specs - Page 11.jpg

JPG

Specs - Page 124.jpg

JPG

Specs - Page 6.jpg

JPG

Specs - Page 165.jpg

JPG

Specs - Page 153.jpg

JPG

Specs - Page 58.jpg

JPG

Specs - Page 168.jpg

JPG

Specs - Page 86.jpg

JPG

Specs - Page 82.jpg

JPG

Specs - Page 79.jpg

JPG

Specs - Page 133.jpg

JPG

Addendum #1 - Page 5.jpg

JPG

Specs - Page 104.jpg

JPG

Plans - Page 9.jpg

JPG

Specs - Page 52.jpg

JPG

Specs - Page 163.jpg

JPG

Specs - Page 44.jpg

JPG

Specs - Page 103.jpg

JPG

Specs - Page 123.jpg

JPG

Specs - Page 36.jpg

JPG

Specs - Page 100.jpg

JPG

Plans - Page 3.jpg

JPG

Specs - Page 112.jpg

JPG

Plans - Page 5.jpg

JPG

Specs - Page 132.jpg

JPG

Specs - Page 117.jpg

JPG

Specs - Page 45.jpg

JPG

Specs - Page 105.jpg

JPG

Specs - Page 66.jpg

JPG

Addendum #1 - Page 10.jpg

JPG

Specs - Page 74.jpg

JPG

Specs - Page 98.jpg

JPG

Specs - Page 14.jpg

JPG

Specs - Page 27.jpg

JPG

Specs - Page 141.jpg

JPG

Specs - Page 40.jpg

JPG

Specs - Page 15.jpg

JPG

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Response Deadline

Deadline has passed

Posted

Solicitation

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → WA State DNR Public Works
Contacts1 person available
OfficeN/A
Organization / Agency
Washington → WA State DNR Public Works
View Agency Profile
Office AddressN/A
Contacts
Karin Williams Project Manager

Full Description

Show more
Work at Glenwood SE0801 includes tracing existing panel circuits, updating the panel schedule, replacing the chemical storage exhaust fan, installing a wall heater for freeze protection, and adding a GFCI breaker for the garage circuit. At Glenwood SE0802, the Contractor shall remove abandoned wiring and accessories, provide junction box covers where required, replace the existing panel with a new 70A single-phase panel while retaining the existing branch circuits, and install new feeders to serve the replacement panel. All services shall be labeled, grounding verified, and wire gutters installed as appropriate to consolidate branch wiring.
Work at Goldendale SE0901 includes tracing panel circuits, providing a new panel schedule, demolishing the existing panel, and installing a new 200A single-phase panel while retaining existing circuits. The Contractor shall remove the existing water heater feeder and install and connect a new tankless water heater, wall-mounted in the same location, removing piping as necessary. Exterior lighting fixtures shall be replaced and upgraded per the plans. At Goldendale SE0902, the Contractor shall trace and label all circuits, replace existing circuit breakers with new, provide GFCI breakers for circuits 6, 8, and 10, demolish existing exterior lighting fixtures and replace them with upgraded fixtures, and confirm full operational performance including photocell activation. These improvements will modernize electrical distribution, improve safety lighting, and ensure compliance with current code requirements.
Pre-Bid Meeting: 8/19 @ 11:30 am at Glenwood (312 N 2nd St, Glenwood, WA 98619) and @ 2:00 pm at Goldendale (900 N Fairgrounds Road, Goldendale, WA 98620)

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS