Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Globe Courthouse Roof and HVAC Replacement

Open
GIL-IFB-2026-014State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Globe Courthouse Roof and HVAC Replacement project, solicitation GIL-IFB-2026-014, is a construction contract for the Gila County Facilities & Land Management agency in Globe, Arizona. The scope involves replacing a leaking roof, approximately 9,725 square feet, and replacing five HVAC units. Key technical requirements include ensuring positive drainage, providing a twenty-year manufacturer's warranty, and meeting specific efficiency standards with a minimum SEER2 of 14.3 and EER2 of 11.0. The contractor must manage work around active court sessions, adhere to strict security and badging requirements, and ensure the building remains conditioned during the replacement process. The contract will be awarded to the lowest responsive and responsible bidder based on a total bid that includes a base bid, a 20% County-controlled contingency, and specific unit prices for roof deck and drain piping replacement. Bidders must provide a reference list of at least three commercial low-slope roofing projects completed within the last five years and submit a bid bond for 10% of the bid amount. Upon award, the contractor must provide performance and payment bonds for 100% of the total bid. Submissions are due by December 29, 2026, and must include various certifications, including compliance with the Legal Arizona Workers Act and certifications against forced labor and the boycott of goods from Israel.

General Info

Contract for roof and HVAC replacement at the Globe Courthouse in Arizona.

Place of Performance

AZ, USA

Set-Aside

NONE

Documents

16
PDF, High priority: read this firstchecklist
High
PDF, High priority: read this first1 page · bid-schedule
High
PDF, High priority: read this first42 pages · ifb
High
PDF, High priority: read this first1 page · ifb
High
PDF, High priority: read this first28 pages · specifications
High
PDF, High priority: read this first2 pages · qualification-form
High
PDF, High priority: read this first1 page · bid-bond
High
PDF, Low prioritycertification
Low
PDF, Low priority1 page · certification-form
Low
PDF, Low priority1 page · certification
Low
PDF, Low priority1 page · certification-form
Low
PDF, Low priority1 page · award
Low
PDF, Low priority1 page · past-performance
Low
PDF, Low prioritycertification
Low
PDF, Low priority1 page · payment-bond
Low
PDF, Low priority1 page · performance-bond
Low

Read all 16 documents

Due in 34 days

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 34 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 16 solicitation documentsRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
  • Buyer contactEmail and phone
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyArizona → Facilities & Land Management
Contacts2 people available
OfficeGlobe, AZ, 85501, USA

Full Description

Show more
The Gila County Courthouse at 1400 East Ash Street houses courts and County offices that serve residents across the County every day. Its roof has reached the end of its service life and leaks into occupied spaces below. The largest roof area, about 9,725 square feet, does not drain positively to its roof drains, so water ponds and finds its way inside. Rooftop equipment sits on curbs that are too low for a new insulated roof, several units are close to the roof edge, and five HVAC units are due for replacement. The main challenge is doing this work above a building that cannot close. The successful contractor will work under courthouse security and badging requirements, schedule noisy or disruptive work around court sessions, and keep the building conditioned while units are removed and replaced. The roof must be dried in at the end of every shift, including during monsoon season. Some conditions will only be known once the old roof is off: the condition of the metal deck, the drain lines (which will be camera-scoped at the start of the project), and the results of the required asbestos inspection. The bid includes unit prices and a County-controlled contingency so these can be handled without delay. A successful project ends with a watertight, positively draining roof backed by a twenty (20)-year manufacturer's warranty; HVAC equipment that is properly sized, efficient, and safely mounted; no water damage to the building or unplanned loss of heating or cooling during construction; and courts and County staff barely noticing the work was done. Contractors who plan carefully, communicate early, and leave the building better protected than they found it will be the County's best partners on this project.

Similar Contracts

Same NAICS industry code

NAICS: 238160
New
Federal
IOOF Main Dorm Flat Roof Replacement Project
Solicitation # ioof-main-dorm-flat-roof-replacement-project
This subcontracting opportunity with Flint Hills Job Corps Center and Serrato Corporation is for the replacement of approximately 6,800 square feet of failed rolled asphalt roofing across four dormitory wings of the IOOF Main Dormitory in Manhattan, Kansas. The scope of work includes removing existing roofing assemblies down to the deck, conducting mandatory asbestos testing, and installing a new 60 mil, fully adhered EPDM white membrane system with tapered poly isocyanate insulation. The project also requires the installation of three new scuppers, commercial grade downspouts, walk pads for mechanical equipment, and new flashings. All work must be completed within 30 consecutive business days and comply with NRCA and SMACNA standards, as well as EPA and OSHA regulations. The contractor must provide a 20-year NDL warranty and ensure the final system is durable, watertight, and properly drained. The solicitation is a set-aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), SBA certified HUBZone Small Business (HUBZone SB), and SAM.gov designated entities. Proposals must be submitted by December 10, 2026, and must include a detailed pricing schedule breaking out labor hours, total labor, materials, and other costs. Award will be based on the proposal most advantageous to Serrato Corporation, with price being the primary evaluation factor. Required documentation includes a W-9, DUNS number, a Certificate of Liability Insurance naming the Center as the Certificate Holder and Additional Insured, and applicable professional licenses. Labor must be paid in accordance with the Davis-Bacon Act wage determinations for Riley County, Kansas.
Flint Hills Job Corps Center

POSTED

about 3 hours ago

DEADLINE

in 15 days
View Details
NAICS: 238160
New
SLED
Furnish All Labor, Material And Equipment For Roof Replacements At Various City Of Garden Grove Water Facilities
Solicitation # S-1399
The City of Garden Grove is seeking qualified contractors for a roofing project across four water facilities, including Well 27, Well 30, the West Garden Grove Reservoir, and the Westhaven Reservoir. The scope of work involves the removal and replacement of roofs to ensure they are watertight, code-compliant, and coordinated with the continued operation of the facilities. Specific requirements vary by location, ranging from asphalt composite shingle roofing at Well 27 and parts of the Westhaven Reservoir to the installation of specialized WeatherWeld systems and Title 24 compliant reflective coatings at other sites. Contractors must provide separate pricing for each facility and a project total. The contract will be awarded to the lowest responsible and responsive bidder. To be considered, bidders must hold a valid California C39 Roofing Contractors license, be registered with the Department of Industrial Relations, and provide a bid bond of at least 10 percent of the bid amount. Bids must be submitted both in person as a paper document and as a PDF via the Planet Bids portal by December 21, 2026. Successful contractors must provide commercial general liability insurance of at least $5,000,000 per occurrence and may be required to furnish payment and performance bonds for 100 percent of the contract price. Work must commence within ten calendar days of the Notice to Proceed and includes a one-year guarantee against defects. There is no specified set-aside status for this solicitation.
Public Works Department of City of Garden Grove

POSTED

about 8 hours ago

DEADLINE

in 26 days
View Details
NAICS: 238160
New
Federal
GAOA Mesa Falls VC Roof Repairs in Caribou-Targhee National Forest, Idaho
Solicitation # 1240LT27Q0003
The USDA Forest Service is soliciting quotes for the GAOA Mesa Falls Visitor’s Center roof repairs and deferred maintenance located in Idaho Falls, Idaho. This project, under NAICS 238160, is a Total Small Business Set-Aside with an estimated value between $250,000 and $500,000. The scope of work includes a Base Bid for the removal and replacement of corrugated metal panel roofing, metal trim, and flashing, as well as the prepping and staining or painting of exterior log walls, wood shingle walls, trim, doors, and windows, including the repair of woodpecker damage. Optional bid items include the installation of snow guards and the repair of round framing at all overhangs. The project is anticipated to start in June 2027, with a performance period of 90 calendar days. Quotes must be submitted as four separate PDF documents, including a signed SF1442, a Price Proposal Schedule of Items, a technical proposal covering the approach and past performance, and bid guarantees. Per Amendment 0001, the response deadline has been extended to December 4, 2026, and all quotes must be directed to Blaine Greenwalt. Evaluation will be based on technical approach, past performance involving three similar projects from the last three years, and price. The contract is subject to the Davis-Bacon Act, requires performance and payment bonds, and mandates compliance with ADA/ABAG guidelines.
USDA Forest Service

POSTED

about 14 hours ago

DEADLINE

in 9 days
View Details
NAICS: 238160
New
Federal
Bid-Build (BB) Replace Miami VAHCS BLDG1 Roof
Solicitation # 36C24826R0132_1
The Department of Veterans Affairs, Network Contracting Office 8, is soliciting proposals for a fixed-price construction project to replace the roofing system on Building 1 at the Bruce W. Carter VA Medical Center in Miami, Florida. The scope of work involves the removal and replacement of approximately 214,637 square feet of roofing, including phased construction, demolition, installation of a new roofing system, removal and reinstallation of photovoltaic panels, and replacement of the Lightning Protection System. The project requires a period of performance of 1,095 calendar days from the Notice to Proceed, with a construction magnitude estimated between $10 million and $20 million. This procurement is a Service-Disabled Veteran-Owned Small Business (SDVOSB) tiered set-aside, meaning SDVOSB offers are evaluated first, followed by VOSB, other small businesses, and finally large businesses. Award will be based on best value to the Government, where non-price factors—including specialized experience, technical approach, schedule, past performance, and roofing warranty—are combined and weighted as significantly more important than price. Offerors must be actively registered in the System for Award Management (SAM) and, if submitting as an SDVOSB or VOSB, must be certified by the SBA. Key requirements include the provision of performance and payment bonds for 100% of the contract price, compliance with the Davis-Bacon Act, and adherence to the Buy American Act. Proposals are due by December 28, 2026, and must be submitted via email to the Contracting Officer and Contract Specialist.
248-NETWORK Contract Office 8 (36C248)

POSTED

about 14 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from Arizona → Facilities & Land Management

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS