Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Glorya Jean Tate Park Lift Station Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Glorya Jean Tate Park Lift Station Project, led by the Marina Coast Water District in Monterey County, California, involves the construction and operation of a new sanitary sewer lift station at the northern end of Glorya Jean Tate Park. The project is designed to improve wastewater conveyance and increase capacity to support planned population growth associated with the Marina Station Development. The scope of work includes the installation of a wet well, valve vault, electrical control panels, a mounted electrical pad transformer, and a backup generator with a sub-base fuel tank. Additionally, the project entails installing a new sanitary sewer force main across Drew Street, Abdy Way, Cardoza Avenue, Reservation Road, and Seaside Court, as well as replacing existing gravity sewers in Seaside Court and rerouting existing gas, water, and drainage infrastructure. The project is expected to be completed over an approximate eight-month construction period. It has undergone a comprehensive environmental review process in compliance with the California Environmental Quality Act, resulting in a Mitigated Negative Declaration approved on October 20, 2025. Key environmental safeguards include a Mitigation Monitoring and Reporting Program to protect biological resources, such as nesting birds, and cultural resources. Technical requirements specify that the lift station must integrate with the district's SCADA system and that electrical installations in the wet well must comply with Class I Division I hazardous location standards. Ground-disturbing activities are subject to strict state laws regarding the discovery of human remains, requiring immediate notification to the Monterey County Sheriff's Office and the Marina Coast Water District.

General Info

Construct new lift station and sewer upgrades in Marina, CA, with strict environmental and cultural compliance, no nighttime work.

Agency

California → Marina Coast Water District

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Drew St, Abdy Way, Cardoza Ave, Reservation Rd, Seaside Ct., Monterey, CA, 93933

Set-Aside

NONE

Documents

(8)

Glorya Jean Tate Park Lift Station Project Environmental Summary

PDFenvironmental-summary

MCWD Glorya Jean Tate Park Lift Station Project Final ISMND October 2025

PDFenvironmental-assessment

Notice of Availability for Glorya Jean Tate Park Lift Station Project

PDFnotice-of-availability

Glorya Jean Tate Park Lift Station Project Summary Form

PDFenvironmental-summary

Notice of Determination for Glorya Jean Tate Park Lift Station Project

PDFnotice-of-determination

MCWD Tate Lift Station Project Mitigation Monitoring and Reporting Program

PDFmmrp

Glorya Jean Tate Park Lift Station Project Notice of Completion

PDFnotice-of-completion

MCWD Glorya Jean Tate Park Lift Station Project Initial Study/Mitigated Negative Declaration

PDFinitial-study-mnd

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Marina Coast Water District
Contacts3 people available
OfficeN/A
Organization / Agency
California → Marina Coast Water District
Office AddressN/A
Contacts
Andrew RaczMCWD Senior Engineer
Erin HarwayneSenior Planner/Project Manager
Andrew A. SterbenzVice President

Interested Companies (2)

Show more
Schaaf & Wheeler
Santa Clara, CA
Denise Duffy & Associates
Monterey, CA

Full Description

Show more
The proposed project consists of the construction and operation of a new sanitary sewer lift station at the northern end of Glorya Jean Tate Park. Under existing conditions, wastewater from the northern portion of Marina currently flows west under SR 1 in an existing 18-inch sewer main toward the defunct MCWD wastewater treatment plant, where MCWD collected wastewater was treated prior to the opening of the Monterey One Water (M1W) Regional Treatment Plant. Wastewater is then pumped back under SR 1 in a sanitary sewer force main in Lake Drive and Reservation Road, which terminates in a manhole at the west end of Seaside Court. The new lift station will transmit wastewater flow through a new sanitary sewer force main that would be installed within the following public roadways: Drew Street, Abdy Way, Cardoza Avenue, Reservation Road, and an existing pipeline easement crossing two commercial properties, ending at a new manhole at the west end of Seaside Court where the proposed project would tie into the existing MCWD system. In addition, the proposed project includes the replacement of the existing gravity sewers in Seaside Court with a new larger gravity sewer. The new lift station would eliminate the need to continue pumping wastewater to the west side of SR 1. The existing pump station will remain operational to continue serving development on the west side of SR 1. In addition to serving existing connections, the proposed project would add wastewater conveyance capacity to facilitate planned population growth associated with the Marina Station Development.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements (Redesign) Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening and compaction units, a new influent eccentric manhole, a flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This opportunity is open to small businesses and certified disadvantaged, minority, and women-owned business enterprises across a wide range of NAICS codes related to heavy and civil engineering construction. Interested parties must submit their responses by October 21, 2026, and can coordinate with the primary point of contact, Christina Pauls.
GSE Construction Co., Inc.

POSTED

about 2 hours ago

DEADLINE

in 29 days
View Details
NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The Jurupa Community Services District Intervalley Pipeline Project, solicitation number PN C155003, involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. Managed by Filanc, the project has an engineer's estimate of 36,000,000 dollars and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is comprehensive, encompassing pipeline infrastructure such as valves, welding, cathodic protection, jack and bore, and precast vaults, as well as civil works including paving, striping, flatwork, fencing, and potholing. Technical services required include videography, testing and inspections, settlement monitoring, survey, and E&IC, alongside compliance tasks such as SWPPP, traffic control, and asbestos pipe demolition and removal. The solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, and Veteran-owned businesses, with a strong emphasis on the participation of SBE, MBE, and WBE firms. Filanc has committed to providing assistance to qualified small businesses regarding bonding, insurance, credit lines, and equipment to encourage diverse subcontracting. Bids for the various project scopes are due by September 23, 2026. Interested parties can obtain plans and specifications through the primary point of contact, Julia Masaitis.
Filanc

POSTED

about 2 hours ago

DEADLINE

in about 18 hours
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished valves and Metropolitan-furnished 54-inch and 132-inch valves, along with 54-inch and 145.5-inch diameter tie-ins and associated fittings. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The project encompasses electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a response deadline of September 29, 2026. The prime contractor encourages M/W/DBE participation and the use of apprentices, offering assistance with bonding, insurance, and materials to qualified subcontractors.
James W. Fowler Co.

POSTED

about 2 hours ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS