Golden Mussel Chemical Injection Mitigation - Coastal Upstream Aqueduct Trench Work
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The California Department of Water Resources is implementing a mitigation project to prevent the spread of invasive golden mussels and protect State Water Project infrastructure along the coastal upstream aqueduct in Kings and Kern Counties. The project involves trenching in three locations within the DWR right-of-way and aqueduct access roads to install two-inch diameter PVC conduit for chemical injection lines and potential electrical cords. All trenching and backfilling will be performed by San Joaquin Field Division staff using a backhoe, with each trench measuring at least six inches wide, 14 inches deep, and less than 40 feet long. This effort is classified as a forecast with a posted date of September 24, 2026, and is managed by Senior Environmental Scientist Elizabeth Maldonado. A Notice of Exemption has been filed to justify a categorical exemption for the work. The project is specifically designed to facilitate chemical injection as a critical measure for the protection of water infrastructure from invasive species.
General Info
Agency
Place of Performance
CASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
