Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity was posted on June 7, 2018. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Gom ARAMIS 3D 12 Megapixel Measurement System

Awarded
80NSSC18Q0699Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

General Info

Agency

N/A

Contract Value

$149,725

NAICS

333314 - Optical Instrument and Lens Manufacturing

Place of Performance

Marshall Space Flight Center, HUNTSVILLE, AL, 35812, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Combined Synopsis

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts1 person available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Donna S. MartinPurchasing Specialist

Full Description

Show more
Gom ARAMIS 3D 12 Megapixel Measurement System In addition, the system shall include and meet the following requirements: 1. 12 Megapixel camera pair for image measurement (minimum of 4096 x 3068 pixels) 2. Minimum of 75 frames/second and minimum of 400 frames/sec at reduced resolution 3. ARAMIS modules to operate cameras for image acquisition and data processing 4. A controller shall be included with a minimum of 8-channel data logger 5. A light projector shall be included to allow for illumination of test article. 6. The image sensor shall be stable and allow for minimum shocks during testing without losing calibration. 7. Image acquisition and measurement system shall include 35mm lenses 8. Measurement system shall include CP40/200 calibration panel 9. System shall include maintenance for minimum of 2 years. 10. GOM correlation professional, NW version included to allow for automation capabilities and scripting and project templates. This shall include testing automation and calculations with reporting. 11. The system shall be delivered no later than 6 weeks from the delivery of the order. 12. Shall include shipping to MSFC, AL 35812.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS