This Solicitation opportunity from Department Of Defense was posted on May 27, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
GOVERNMENT FIRST ARTIC
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
This contract involves the procurement of carriage assemblies, specifying detailed technical and quality requirements aligned with the DLA Master List of Technical and Quality Requirements as applicable at the solicitation or award date. The manufacturing processes identified include metal casting and forging, requiring specialized tooling and adherence to stringent quality standards such as ISO 9001:2015 and compliance with defense-related cybersecurity and packaging regulations. Sampling and inspection protocols follow MIL-STD-1916 or comparable standards, with a zero-tolerance acceptance criterion for non-conforming items unless otherwise stated. Items must be marked and packaged per military specifications, with shipping and delivery managed FOB origin to the designated defense logistics location at Tinker AFB, Oklahoma. The contract specifies a firm quantity of five carriage assemblies with delivery expected within 373 days, alongside a separate line item for a government first article test, which verifies compliance prior to full production. The contract also includes comprehensive audit and cybersecurity provisions, referencing adherence to DFARS clauses and CMMC Level 2 self-assessment standards. Documentation for source approval, inspection at origin, and removal of government identification on rejected items are mandated. The shipping, packaging, and palletization must comply with MIL-STD-2073-1E and DLA packaging requirements to ensure proper preservation and handling. The first article test line item requires one unit and is essential for contract award, with no separate charge assumed if pricing is not provided. Overall, this contract establishes rigorous compliance and quality assurance measures to ensure delivery of high-integrity defense components within specified timelines.
General Info
Agency
NAICS
Place of Performance
3301 F AVE CEN REC BLDG 506 DR 22, TINKER AFB, OK, 73145-8000, USSet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
CARRIAGE ASSEMBLY
RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS
(IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE
DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB
AT:
http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx
FOR SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-ON REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS.
RC001: DOCUMENTATION REQUIREMENTS FOR SOURCE APPROVAL REQUEST (SAR)
RD002, COVERED DEFENSE INFORMATION APPLIES
RD004: Cybersecurity Maturity Model Certification (CMMC) Level 2 Self-Assessment RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
RQ009: INSPECTION AND ACCEPTANCE AT ORIGIN
RQ011: REMOVAL OF GOVERNMENT IDENTIFICATION FROM NON-ACCEPTED SUPPLIES
RQ017: PHYSICAL INDENTIFICATION/BARE ITEM MARKING
Item Unique Identification is not required by request of the Service customer. DFARS 252.211-7003(c)(1)(i) applies.
RQ042: Non-Tailored Higher-Level Quality Requirements (ISO 9001:2015) for Manufacturers and Non-Manufacturers
RT001: MEASURING AND TEST EQUIPMENT
A metal casting process was identified as a means to manufacture this item. Tooling is required to produce a casting. For sourcing, tooling, materials or other information, please contact the appropriate assistance team: (Aviation, C<(>&<)>E Supply Chains) https://www.dla.mil/Aviation/Offers/Engineering/Forging-and-Casting/; (Land & Maritime Supply Chains) DSCC.cast.forge@dla.mil. A forging process was identified as a means to manufacture this item. Tooling is required to produce a forging. For sourcing, tooling, materials or other information, please contact the appropriate assistance team: (Aviation, C<(>&<)>E Supply Chains) https://www.dla.mil/Aviation/Offers/Engineering/Forging-and-Casting/; (Land & Maritime Supply Chains) DSCC.cast.forge@dla.mil.
SAMPLING: THE SAMPLING METHOD SHALL BE IN ACCORDANCE WITH MIL-STD-1916 OR ASQ H1331, TABLE 1 OR A COMPARABLE ZERO BASED SAMPLING PLAN UNLESS OTHERWISE SPECIFIED BY THE CONTRACT. IF THE APPLICABLE DRAWING, SPECIFICATION, STANDARD, OR QUALITY ASSURANCE PROVISION (QAP) SPECIFIES CRITICAL, MAJOR AND/OR MINOR ATTRIBUTES, THEY SHALL BE ASSIGNED VERIFICAITON LEVELS OF VII, IV AND II OR AQLS OF 0.1, 1.0 AND 4.0 RESPECTIVELY. UNSPECIFIED
SPE4A6-26-T-72H0
SECTION B
ATTRIBUTES SHALL BE CONSIDERED AS MAJOR UNLESS SAMPLING PLANS ARE
SPECIFIED IN APPLICABLE DOCUMENTS. FOR MIL-STD-1916, THE MANUFACTURER
MAY USE THE ATTRIBUTE OR VARIABLE INSPECTION METHOD AT THEIR OPTION OR
PER THE CONTRACT. MIL-STD-105/ASQ Z1.4 MAY BE USED TO SET SAMPLE LOT
SIZE, BUT ACCEPTANCE WOULD BE ZERO NON-CONFORMANCES IN THE SAMPLE LOT
UNLESS OTHERWISE SPECIFIED IN THE CONTRACT.
CRITICAL APPLICATION ITEM
THE BOEING COMPANY 81205 P/N 5-87847-2
DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to determine the corresponding ANSI X12 unit of issue.
https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments% 2FDLMS%2FeApplications%2FLogDataAdmin%2FUnitofIssueandPurchaseUnit.xlsx&wdOrigin=BROWSELINK
CLIN PR PRLI UI QUANTITY UNIT PRICE TOTAL PRICE.
0001 7016847851 0001 EA 5.000
NSN/MATERIAL:1560011188049
DELIVERY (IN DAYS):0373
DELIVER FOB: ORIGIN
QTY VARIANCE: PLUS 0% MINUS 0%
INSPECTION POINT: ORIGIN
ACCEPTANCE POINT: ORIGIN
PREP FOR DELIVERY:
PKGING DATA MIL-STD-2073-1E
QUP:001 PRES MTHD:20 CLNG/DRY:1 PRESV MAT:ZZ
WRAP MAT:GB CUSH/DUNN MAT:NA CUSH/DUNN THKNESS:A
UNIT CONT:EC OPI:M
PACK CODE:U
MARKING SHALL BE IN ACCORDANCE WITH MIL-STD-129.
SPECIAL MARKING CODE:00 -00 No special marking
PALLETIZATION SHALL BE IN ACCORDANCE WITH RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
SUPPLEMENTAL DATA: APPLY O2 TO BEARINGS ONLY
PARCEL POST ADDRESS:
SW3211
DLA DISTRIBUTION DEPOT OKLAHOMA
3301 F AVE CEN REC BLDG 506 DR 22
TINKER AFB OK 73145-8000
US
FOR TRANSPORTATION SEE DLAD DLAD PROC NOTE C19. FOR FIRST DESTINATION TRANSPORTATION SEE DLAD PROC NOTE
C20 AND CONTRACT
FREIGHT SHIPPING ADDRESS:
SPE4A6-26-T-72H0
SECTION B
PR: 7016847851 PRLI: 0001 CONT’D
SW3211
DLA DISTRIBUTION DEPOT OKLAHOMA
3301 F AVE CEN REC BLDG 506 DR 22
TINKER AFB OK 73145-8000
US
Need Ship Date:11/15/2026 Original Required Delivery Date:02/19/2028
GOVERNMENT FIRST ARTICLE TEST – THE NUMBER OF UNITS SHOWN SIGNIFIES THE
TEST REQUIREMENT. SEE FAR CLAUSE 52.209-4 CITED IN SECTION A OF THIS
SOLICITATION FOR THE ACTUAL QUANTITY REQUIRED.
DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to determine the corresponding ANSI X12 unit of issue.
https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments% 2FDLMS%2FeApplications%2FLogDataAdmin%2FUnitofIssueandPurchaseUnit.xlsx&wdOrigin=BROWSELINK
CLIN PR PRLI UI QUANTITY UNIT PRICE TOTAL PRICE.
0002 0000000000 EA 1.000
NSN/MATERIAL:0001S00000052
DELIVERY (IN DAYS):0090
THIS LINE ITEM SIGNIFIES THE FIRST ARTICLE TEST REQUIREMENT (FAT). SEE
CLAUSES FOR INFORMATION CONCERNING THE FAT REQUIREMENT. OFFERS THAT DO
NOT CITE A PRICE FOR THIS LINE ITEM SHALL BE EVALUATED UNDER THE
ASSUMPTION THAT THERE IS NO SEPARATE CHARGE FOR THE FAT. IN THE EVENT
THE FAT REQUIREMENT IS WAIVED, NO AWARD WILL BE MADE FOR THIS LINE ITEM.
THE NUMBER OF UNITS SHOWN APPEARS AS “1 EA”. THIS QUANTITY SIGNIFIES
THE TEST REQUIREMENT. OFFERORS WILL FIND THE ACTUAL QUANTITY REQUIRED
BY THE GOVERNMENT FOR THE FAT LINE ITEM PER FAR 52.209-3 OR 52.209-4 IN
SECTION A OF THIS SOLICITATION.
DELIVER FOB: ORIGIN
QTY VARIANCE: PLUS 0% MINUS 0%
INSPECTION POINT: ORIGIN
ACCEPTANCE POINT: ORIGIN
Need Ship Date:00/00/0000 Original Required Delivery Date:00/00/0000
SPE4A6-26-T-72H0 NSN/Part Number: 0001S00000052 Quantity: 5 EA Purchase Request: 7016847851QTY - See Solicitation Delivery: 373 days ADO
