This Sources Sought opportunity from Department Of Defense was posted on April 11, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Green River Lock 1 Miter Gate Rehab

Closed
W912QR24QGRL1Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex located at 28 Bare Cove Park Drive. This fixed-price lump sum project has an estimated construction cost of $1,300,000. The scope of work includes site preparation such as the removal of trees, shrubs, and stumps, re-grading the site, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the contractor is responsible for a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor must coordinate with the Town and the demolition contractor, Pasquazzi Bros, Inc., and is responsible for maintaining construction fencing and erosion control throughout the project duration. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or paved athletic facilities. Bidders must submit their proposals electronically via the OpenGov portal by November 3, 2026, including a 5% bid security and a Statement of Qualifications with at least three similar public project references. Awarded contractors must provide a payment bond equal to 50% of the total project cost and adhere to Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code. The project includes a minimum one-year warranty for labor and a two-year warranty for materials. Final payment is contingent upon the submission of AIA affidavits for the payment of debts and release of liens.
Recreation

POSTED

about 4 hours ago

DEADLINE

in 5 days
NAICS: 237990
New
SLED
Pre-Qualification For Construction Of Park, Recreation & Libraries Parks And Facilities For 2027
Solicitation # 13-202
Solicitation 13-202 is a pre-qualification process issued by the City of Roseville, California, for the construction of park, recreation, and library facilities scheduled for 2027. The objective is to identify qualified contractors with the capacity and experience to execute new park construction and rehabilitation projects. Interested parties must submit their pre-qualification packages via email to the City Clerk’s Office by 3:00 p.m. on November 23, 2026. Submissions are limited to 25 megabytes and must include a signed questionnaire, DIR registration for all contractors and subcontractors, and current workers' compensation certificates of insurance. To achieve pre-qualified status, applicants must meet essential qualifications, including a valid California Contractor's license and specific insurance limits of 1,000,000 dollars per occurrence and 2,000,000 dollars aggregate. Experience requirements mandate the completion of at least six new park construction projects for public agencies within the last three years, with a maximum of three rehabilitation projects allowed toward this total. Financial solvency is verified through third-party credit checks, where a score of 650 or less may lead to disqualification. Evaluation also considers compliance with California apprenticeship laws, Davis-Bacon prevailing wage requirements, and CAL OSHA safety standards.
City of Roseville, Parks, Recreation & Libraries Department (PRL)

POSTED

about 4 hours ago

DEADLINE

in 25 days

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Reed, KY, 42451, USA

Set-Aside

NONE

Documents

1

Market Survey Questionnaire - Green River Lock 1 Miter Gate Rehab

DOCX, Low prioritysources-sought
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseClosed
Posted

Sources Sought

Deadline changed

Response deadline changed from Mar 19, 2024 to Apr 17, 2024.

Notice updated

Response deadline changed from Apr 17, 2024 to Apr 16, 2024. The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Louisville
Contacts1 person available
OfficeLOUISVILLE, KY, 40202-2230, USA
Office AddressLOUISVILLE, KY, 40202-2230, USA

Full Description

Show more
A market survey is being conducted to determine if there are a reasonable number of interested small business concerns to set this future project aside for them. If your firm is a Small Business (SB), certified HUBZone, 8a, Woman-Owned Small Business (WOSB), or Service Disabled Veteran Owned Small Business (SDVOSB) and you are interested in this project please respond appropriately. All interested SB, certified HUBZone, 8a, WOSB, and SDVOSB contractors should respond to this survey by email by 16 April 2024 by 4:00 PM Eastern Standard Time to Andrew Fleming at contact@example.gov. 1. Project Title: Green River Lock 1 Miter Gate Rehab 2. Project Location (with physical address): 5048 DAM & LOCK ROAD REED, KY 42451 3. Project NAICS Code: 237990 4. Response Date: 16 APR 2024 5. Short Project Description: Dewatering the lock chamber will be required to perform this work. Dewatering will include install of closure system and maintaining a dewatered status for the remainder of the project. A replacement poiree dam lower closure (bulkhead slots, needle dam, modified headbay, or sheet pile wall) will need to be designed and installed for dewatering. During the dewatering the contractor will raise miter gates by picking. The contractor will replace and rehab related components, to include contact blocks, anchor arms, pintle balls/bushings, and timber seals. Another component to this is to tension the diagonals and repair any structural cracking that is found. 6. Type of Action: Sealed Bid 7. Estimated Advertisement Date: 4th Quarter FY24 8. Estimated Award Date: 4th Quarter FY24 9. Estimated Performance Period: 430 calendar days 10. Construction Cost Limit (CCL) and Programmed Amount (PA): NOTE: The CCL is the estimated construction award amount and does not include real estate, S&A, DDC or contingency. CCL: 6.0M PA: $6.59M 11. Criteria: a. Projects similar in scope to this project include: Construction including dewaterings on lock or dam structures on the Ohio and Mississippi Rivers and their tributaries. b. Projects similar in size will include: Removal and rehabilitation of miter gates or similar structures in which dewatering was needed. Projects should include managing a dewatering on a major river system to perform maintenance work. Examples of similar projects would be: Miter Gate Rehabilitations, Miter Gate Exchanges, Lock Chamber Dewatering's. 12. Based on the definitions above, for each project submitted, include: a. current percentage of construction complete and the date when it was or will be completed. b. scope of the project c. size of the project d. dollar value of the project e. the portion and percentage of work that was self-performed f. whether the project was design/build or not To protect the procurement integrity of any future procurement, if any, that may arise from this announcement, information regarding the technical point of contact will not be given and no appointment for presentations will be made. All information is to be provided on a voluntary basis at no charge to the Government. There is no entitlement to payment of direct or indirect costs related to or arising out of responding to this request for information. All information provided becomes property of the Government. There is no guarantee, expressed or implied, that the market research for this acquisition will result in any guarantee of award or acquisition strategy. Email the requested information, with delivery and read receipt requested to: Andrew Fleming at contact@example.gov The email should be titled: Sources Sought - Green River Lock 1 MGR - **Contractors Name**

More opportunities from Department Of Defense → W072 Endist Louisville

Same awarding agency

NAICS: 237110
New
Federal
Design-Bid-Build - Rough River Lake Axtel Wastewater Treatment Plant (WWTP)
Solicitation # W912QR27BA003
Solicitation W912QR27BA003 is a Design-Bid-Build project for the demolition and construction of the Axtel Wastewater Treatment Plant (WWTP) at Rough River Lake in McDaniels, Kentucky. The scope of work requires the contractor to remove the existing WWTP and fencing and install a new Aerobic Treatment Unit (ATU) and Drip Field System. This unrestricted procurement is estimated to have a construction magnitude between 1 million and 5 million dollars, with the award based on the lowest evaluated price. A 10 percent price evaluation preference will be applied to eligible HUBZone small business concerns. The contract is a Firm-Fixed-Price agreement under NAICS code 237110, with a total project duration of 400 calendar days from the Notice to Proceed. Performance is scheduled from December 18, 2026, to January 22, 2028, with a requirement to commence work within 10 calendar days of the notice. Key requirements include the submission of a Construction Quality Control (CQC) plan within 30 days of the notice to proceed, adherence to Davis-Bacon Act wage rates, and the provision of a Site Safety Health Officer. Liquidated damages for delays are set at 500 dollars per calendar day. Proposals must be submitted electronically via the PIEE Solicitation Module by the December 3, 2026, deadline.
Water and Sewer Line and Related Structures Construction

POSTED

2 days ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS