Greenville Road Sewer Extension Project
Active
State & LocalContract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
NAICS
N/A
Place of Performance
Greenville Road and Tesla Road, CA, 94550Set-Aside
NONE
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Organization & Contact Information
Show more
AgencyCalifornia → Alameda County
Contacts2 people available
OfficeN/A
Interested Companies (1)
Rincon ConsultantsVentura, California
Full Description
Show more
The proposed project includes two components: the extension of a sewer line along Greenville Road between Tesla Road and the Martinelli Center, and modifications to and/or re-use of the Martinelli Center. The actual paved parking lot area is expected to be substantially smaller and would be refined during final design. The proposed project would be located within paved rights-of-way, with no ground disturbance proposed in adjacentagricultural or natural areas. The alignment crosses one bridge over Arroyo Seco, an east-west intermittent stream. The proposed project also includes a sewer lateral connection from Greenville Road to the existing Martinelli Center buildings and a lift station at the Martinelli Center parcel.
While the County is considering several options for future uses at the Martinelli Center, the CEQA analysis is based on the most intensive use that could be feasible for the property. Changes to uses of the Martinelli Center could include: (1) the continuation of the event center functions, including weddings and other social events on weekends, and business and civic events during the week; and (2) conversion of the existing office space into a wine country visitor hub, including activities such as wine tastings and wine trolley tours leaving from the Martinelli Center.
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
