Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on June 15, 2021. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Grindstone Recreation Area Wastewater Treatment Plant (WWTP) Analysis

Awarded
12445121C0006Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Grindstone Recreation Area Wastewater Treatment Plant Analysis, solicitation 12445121R0005, is a small business set-aside contract awarded by the USDA Forest Service. The project focuses on a feasibility study to address critical challenges including aging infrastructure, high maintenance costs, remote management difficulties, and the need to eliminate NPDES permit requirements. The primary objective is to evaluate and recommend cost-effective wastewater treatment replacement options that can handle seasonal fluctuations while reducing operational complexity. The scope of work involves a comprehensive assessment including site reviews of existing facilities, electrical and data systems, and subsurface investigations featuring percolation tests. A key technical requirement is the jetting and television inspection of approximately 6,000 linear feet of gravity sewer collection mains. The contractor must deliver a detailed feasibility study comparing up to four treatment and collection options, a cost-benefit analysis of new construction versus rehabilitation, and a formal closure plan for decommissioning the existing plant to terminate current operating permits.

General Info

Contract Value

$58,931.43

NAICS

541330 - Engineering Services

Place of Performance

Missoula, MT, 59808, USA

Set-Aside

SBA

Awardee

DJ&A, P.C.

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Csa East 11 Usda-Fs
Contacts1 person available
OfficeAtlanta, GA, 303092449, USA
Office AddressAtlanta, GA, 303092449, USA

Full Description

Show more
Services under SRS Shortlist 12445121R0005 feasibility study should address the following challenges: ? NPDES permit requirements ? Aging treatment & collection infrastructure and inefficient design ? High annual maintenance and operation costs ? Remote system operation and management ? Seasonal operation and fluctuations SCOPE OF WORK PHASE 1: Feasibility Study and Assessment of Replacement Options The goal of this phase is to study the feasibility of various wastewater treatment options available to replace the existing WWTP, to compare and assess the replacement options, to recommend the most appropriate replacement option(s) and to provide a closeout plan for the existing wastewater treatment facility. This phase will include the following activities and deliverables: a. Review and document the existing Grindstone WWTP facility site and recreation facilities, operations, maintenance activities, historical records/documents, and NPDES permit. b. Review and document the recreation facilities currently served by the existing sewage treatment plant and evaluate projected wastewater flows generated by each facility. c. Review the sanitary sewer infrastructure serving the existing WWTP. d. Review the electrical and data/telecommunications systems serving the existing WWTP. e. DELETED f. Perform subsurface investigation and testing to develop and evaluate replacement WWTP options. It is assumed the USFS will provide an excavator to dig the test pits and PVC pipe for the percolation tests. Test pit locations will be approved by the Virginia Department of Health (VDH). It is assumed there will be a maximum of five test pits excavated with each test pit requiring a percolation test. Percolation tests will be performed by the prime contractor in accordance with VDH requirements. It is also assumed there will be a water source available on site to conduct the percolation tests. Correspondence with VDH has indicated the new WWTP will not require a VDH permit due to its location on federal land; however, all local and state rules and regulations will be followed. The prime contractor will handle all coordination with VDH as needed. For later phases of the project, VDH has offered to provide a cursory review. g. Items a. - e. will be completed during a 2-day site visit. h. A tv inspection contractor will be subcontracted under the prime contractor to perform gravity sewer tv inspection of approximately 6,000 linear feet of gravity sewer collection main. The tv inspection will be used to evaluate the existing collection system and inform recommendations. The tv inspection contractor will jet the existing collection system prior to the tv inspection. Recordings for all of the gravity sewer collection system inspections will be provided to the prime contractor. It is assumed that it will take approximately five working days to complete the tv inspection. i. Prepare a feasibility study report detailing replacement of the existing WWTP with simpler and more cost-effective wastewater treatment options. The alternative treatment options must eliminate the requirement for an NPDES permit and should be sited within, adjacent to, or close-by the existing WWTP. The feasibility study report should evaluate and consider using components of the existing wastewater infrastructure following some rehabilitation. However, the cost/benefit of new versus rehabilitation must be considered. The report, not including appendices, will be approximately 30- to 40-pages and will be used to scope the next phase of the project. j. Provide an assessment and cost analysis of the replacement options identified/recommended in the feasibility study to include comparisons of up to 4 options for treatment and collection (including a - no action alternative) identified in collaboration with USFS prior to detailing options. At a minimum, comparisons should include environmental impact, seasonal operation/fluctuations, operational complexity, remote operation/management, repair/replacement costs, system vulnerability to infrastructure failure, cost analysis (should include, capital/construction costs, annual operation and maintenance costs, energy savings and life cycle costs), certified operator requirements, options for phasing, implementation timeline, construction schedule and anticipated service life. A - best replacement option recommendation shall be made to the USFS as a final outcome of the assessment including estimated costs and schedules for design and construction. k. Prepare a closure plan outlining possible approaches for decommissioning the existing wastewater treatment plant prior to construction of the new wastewater system that would eliminate wastewater discharging and terminate the VDH DEQ NPDES or other operating permits until demolition of the existing can be completed while still providing limited operations and access to the recreation facilities. Potential closure concepts will be presented in a brief 3- to 4- page technical memorandum, not including attachment.

More opportunities from Department Of Agriculture → Csa East 11 Usda-Fs

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS