Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Groundwater Treatment Plant Filter Gallery Valve Rehabilitation Project – Phase 2

Active
20260909016State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Groundwater Treatment Plant Filter Gallery Valve Rehabilitation Project Phase 2, solicitation number 20260909016, is issued by the Board of Public Utilities Commissioners of the City of Long Beach. The project focuses on the removal and replacement of butterfly valves, electric actuators, steel piping, and Victaulic couplings. Additional requirements include the rehabilitation of steel spools, recoating surface wash water piping, managing electrical conduit connections, and integrating new actuators into the existing SCADA system. The scope also encompasses repairing filter basin cracks using polyurethane crack injection. Work must be executed in phases aligned with the shutdown status of various filter basins, necessitating close coordination with the Long Beach Public Utilities Department for sequencing flexibility. This solicitation is open for responses until October 8, 2026, and is categorized under NAICS code 237110. The project will be performed in Long Beach, California.

General Info

Long Beach BPU valve rehabilitation and filter gallery repairs, due October 8, 2026.

Agency

California → Board of Public Utilities Commissioners of the City of Long BeachView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Long Beach, CA, 90806, USA

Set-Aside

NONE

Documents

(2)

EO-3742 Groundwater Treatment Plant Filter Gallery Valve Rehabilitation Project - Phase 2 Plans

PDFspecifications

WD-05-25 Groundwater Treatment Plant Filter Gallery Valve Rehabilitation Project - Phase 2

PDFspecifications

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Board of Public Utilities Commissioners of the City of Long Beach
Contacts1 person available
OfficeN/A
Organization / Agency
California → Board of Public Utilities Commissioners of the City of Long Beach
View Agency Profile
Office AddressN/A

Full Description

Show more
Bid #WD-05-25: This project involves the removal and disposal of existing butterfly valves, electric actuators, associated steel piping, Victaulic couplings, and appurtenances. It includes the installation of new butterfly valves, electric actuators, associated steel piping, Victaulic couplings, and appurtenances. The scope also covers the rehabilitation of existing steel spools, recoating of existing surface wash water piping, disconnection and reconnection of electrical conduits, struts, and junction boxes, and connection of new actuators to the existing SCADA system. Additionally, the project requires the repair of cracks in filter basins using the polyurethane crack injection method. The work is to be performed in phases based on the shutdown condition of various filter basins, requiring coordination with the Long Beach Public Utilities Department (LBUD) to allow flexibility in sequencing.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
SLED
PIDC Project 1 - Bldg. 3 plumbing, boiler, FA, painting and WWTP
Solicitation # 872281
Solicitation 872281, managed by the Bristol Alliance of Companies for U.S. Immigration and Customs Enforcement, involves a comprehensive series of facility repairs and upgrades at the Port Isabel Detention Center in Los Fresnos, Texas. The project scope encompasses multiple critical infrastructure improvements, including the replacement of boilers across several buildings, the installation of a new fire alarm system in the dining facility, and extensive painting and structural repairs for 11 buildings. Additionally, the contract requires significant plumbing repairs in Multipurpose Building 3 and critical upgrades to the wastewater treatment plant, specifically replacing worn valves, installing a sewage grinder on the influent trough, and utilizing coastal weather resistant materials to ensure long term durability. The project is estimated to have a magnitude between 1.5 million and 2 million dollars and is issued as a task order for 8(a) MACC IDIQ offerors. Contractors must adhere to the TX20260236 wage determination for Cameron County and meet strict requirements regarding key personnel qualifications, quality control, and safety standards. The procurement process includes a mandatory site survey and a detailed pricing template broken down by CSI division. Proposals are subject to technical evaluations focusing on the approach to safety and quality assurance, with a response deadline of September 10, 2026.
Bristol Alliance of Companies

POSTED

about 12 hours ago

DEADLINE

in 14 days
View Details
NAICS: 237110
New
JCSD Intervalley Pipeline Project in CA
Solicitation # jcsd-intervalley-pipeline-project-ca
The JCSD Intervalley Pipeline Project in Fontana, California, involves the demolition, furnishing, installation, testing, and operationalization of approximately 3.3 miles of 42-inch cement mortar lined and coated steel potable water transmission pipeline. Managed by Garney Pacific, Inc. for the Jurupa Community Services District, the scope of work includes trenchless crossings, air release valves, blowoff assemblies, valves, fittings, and connections to existing water facilities. Additional requirements encompass pavement removal and restoration, traffic control, utility coordination, the construction of flow control facility components, and the overall disinfection, startup, and commissioning of the pipeline system. This solicitation seeks subcontractor and supplier quotes for various trade scopes, including steel pipe welding, electrical and instrumentation, trenchless construction, and the supply of aggregates, ready-mix concrete, and steel fittings. All subcontractors are required to utilize union labor and must be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid. Quotes and any exceptions to the Garney Standard PO and Subcontract Forms must be submitted to Alyssa Callaway by September 18, 2026, at 2:00 PM PT.
Garney Pacific, Inc.

POSTED

about 12 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is seeking MBE, DBE, and WBE subcontractors and suppliers for a targeted green-street retrofit project in downtown Romney, West Virginia. The project involves the modification of approximately 343.59 linear feet of South Marsham Street between Gravel Lane and US Route 50. The scope of work includes the installation of 1,450 square feet of permeable pavement, eight vegetated stormwater management cells, and comprehensive drainage and tie-in work. Additionally, the project requires the planting of six native trees and approximately 345 native plants, along with limited curb, sidewalk, ADA, apron, crossing, and traffic-calming improvements to integrate the BMP corridor. The primary objective of the project is to treat approximately 1.7 acres of impervious surface within a 3.3-acre drainage area, concluding with final stabilization, cleanup, and restoration. This solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and Veteran-Owned businesses, with an encouragement for these entities to form consortiums for larger bid items. Bids must be submitted by September 17, 2026, at 4:00 P.M. The primary point of contact for this effort is Jennifer Wilson, with administrative coordination handled by Jonah Leith.
Harbel, Inc.

POSTED

about 12 hours ago

DEADLINE

in 6 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project requires the installation of both contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches, as well as tie-ins between 54 and 145.5 inches. Additional deliverables include the construction of four surge tanks, two valve vaults, an air compressor yard structure, drainage improvements, electrical upgrades, instrumentation and controls, and various piping systems. Civil works involve the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and women business enterprises. Bids are due by September 29, 2026. The project encourages the use of apprentices and provides specific support for M/W/DBE subcontractors, including assistance with bonding, insurance, lines of credit, and the procurement of equipment and materials. All negotiations must be finalized 24 hours prior to the bid opening. Technical plans and specifications are available through the James W. Fowler website.
James W. Fowler Co.

POSTED

about 12 hours ago

DEADLINE

in 18 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS