Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Gurdial Singh Travel Center Project by LAV Consulting and Engineering

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Gurdial Singh Travel Center Project, managed by LAV Consulting and Engineering for Kern County, California, involves a Precise Development Plan to construct a 12,303-square-foot travel center on a 10.6-acre portion of a larger 26.41-acre parcel. The facility will operate 24 hours a day and feature a convenience store, a fast-food drive-thru restaurant with limited dine-in seating, a standard vehicle service station with 16 fuel pumps, and a 9-bay semi-truck diesel fueling station with an associated scale. Specialized amenities for long-haul drivers include a lounge with televisions, vending machines, and dedicated restrooms with shower areas. The site will accommodate 49 truck parking spaces for short-term and overnight use, four electric vehicle charging stations, and six heavy truck EV charging spaces. Fuel infrastructure will consist of above-ground storage tanks with a maximum capacity of 100,000 gallons each for diesel and gasoline. The project includes a request for a Zone Variance to allow a pole sign with a 300-square-foot face and a height of 70 feet, exceeding the standard limits of 240 square feet and 35 feet. Under solicitation PLN25-00129, the project has undergone environmental review via a Mitigated Negative Declaration to address potential impacts on air quality, biological and cultural resources, geology, and hazardous materials. A public review period was established from September 30, 2026, to October 29, 2026, with a public hearing scheduled for November 19, 2026. The development is expected to employ between 8 and 12 full-time staff per shift and will offer food, beverage, and closed-lid alcohol sales.

General Info

Kern County project for a 12,303-square-foot travel center with fueling and truck parking.

Agency

California → Kern County

Place of Performance

Stockdale Highway & Interstate 5, CA, 93276

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Kern County
Contacts1 person available
OfficeN/A
Organization / Agency
California → Kern County
Office AddressN/A
Contacts
April WentworthPlanner II

Full Description

Show more
The project proposes a Precise Development Plan to allow a 12,303-square-foot travel center on a 10.6-acre portion of a 26.41-acre parcel. The proposed travel center will include a convenience store, a fast-food drive-thru restaurant with a limited dine-in seating, one service station for standard vehicles with 16 auto fuel pumps, and a 9 bay semi-truck diesel fueling station with an associated semi-truck scale. The proposed travel center will operate 24 hours a day, seven days a week, with an anticipated 8-12 full-time employees per shift. The travel center will also include an office, food and beverage sales (including closed lid alcohol). Additional services for long haulers include a small lounge with couches, televisions, a vending machine and a separate restroom with shower area. The plan includes 49 truck parking spaces intended for short term and overnight use, four electric vehicle (EV) charging stations, and six heavy truck (EV) charging spaces. Above ground fuel storage tanks with a maximum storage capacity of 100,000 gallons of diesel and 100,000 gallons of gasoline would be located in the northern portion of the project site. The proposed project includes a request for a Zone Variance to allow a pole sign with a 300-square-foot sign face where a maximum 240-square foot sign face is allowed and a 70-foot-sign height where a maximum of 35-feet is allowed.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) as defined by the Department of Transportation, falling under NAICS code 236220. The solicitation was posted on October 24, 2026, with a response deadline of November 4, 2026. The project area for subcontracting opportunities is designated as Riverside or Los Angeles. To ensure project financing and avoid being deemed non-responsive, bidders must strictly adhere to six Good Faith Effort (GFE) requirements. Critical mandates include posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening, as well as demonstrating the utilization of the Small Business Administration and the Minority Business Development Agency. Proof of these specific efforts must be included in the bid package. While outreach documentation may be submitted up to three business days after the closing date, failure to complete the primary GFE steps before the opening date will result in the bid being rejected.
RT CONTRACTOR CORP

POSTED

about 10 hours ago

DEADLINE

in 10 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope includes comprehensive site preparations, underground stormwater retention, utilities, telecommunications, landscaping, and parking. An additional option for the P1016 facility involves a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders are requested to provide pricing for a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and sitework. All work must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Interested parties must contact Rahul Maheshwari to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 10 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that impacted the first, second, and third floors. The scope of work includes architectural repairs such as drywall replacement, painting, ceiling tile and flooring installation, and rubber wall base installation, as well as necessary plumbing and electrical work to restore dormitory rooms, offices, and common areas to their original condition. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. This is an SBA set-aside opportunity open to small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Award will be based on best value, evaluated through a 100-point system consisting of price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Requirements include a valid Massachusetts Contractor's License, proof of specific automobile liability insurance, and compliance with Davis-Bacon Act wage determinations, NFPA-101 life safety codes, and EPA and OSHA regulations. Proposals must include a detailed cost breakdown for labor, materials, and equipment, a timeline for substantial completion, and a 90-day bid guarantee.
Grafton Job Corps

POSTED

about 10 hours ago

DEADLINE

in 23 days
View Details
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is seeking pricing for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements feature reinforced concrete floors, rigid inclusions, load transfer mats, grounding and lightning protection, and intrusion detection systems. The project encompasses a wide range of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. Site work is extensive, requiring clearing, rock excavation, grading, and mitigation for impacts on existing wetlands, as well as the installation of access roads, paved loading areas, and full electrical utility infrastructure. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Interested parties must respond by October 31, 2026, by contacting the primary point of contact to receive the formal bid invitation and project documents.
J & J Contractors, Inc

POSTED

about 10 hours ago

DEADLINE

in 6 days
View Details
NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center in Glynco, Georgia, is a single firm fixed price contract for comprehensive interior modernization. The scope of work includes replacing corridor and classroom flooring with composite modular materials, fully renovating restrooms with new vanities and lavatories, and updating doors and life-safety components. Technical upgrades involve installing raised flooring and electrical distribution to support classroom needs, implementing simple dimming lighting controls, and replacing variable air volume systems. The project also encompasses repainting interior surfaces, correcting plumbing deficiencies, and providing new signage for all spaces. While the primary focus is Building 262, the project includes a base requirement for Building 261 and an option for Building 263. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the notice to proceed. Award will be based on a best suited negotiate methodology, evaluating price alongside past performance and corporate relevant experience. Contractors must provide performance and payment bonds equal to 100 percent of the contract price and adhere to Davis-Bacon wage determinations and ADA accessibility guidelines. Proposals must be submitted electronically to the contracting officer by November 9, 2026, and must include a detailed bid schedule in Excel and technical documentation in PDF format.
Bristol Alliance of Companies

POSTED

about 10 hours ago

DEADLINE

in 16 days
View Details
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000, managed by the Bristol Alliance of Companies, is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project scope is comprehensive, involving selective demolition, building envelope and roofing repairs, interior reconfiguration, and the installation of new finishes. Critical infrastructure upgrades include new HVAC systems, exhaust extraction, compressed air systems, a full NFPA-compliant fire suppression system, updated electrical distribution, lighting, low-voltage systems, and building automation controls. Additionally, the project requires hazardous materials abatement and site improvements, specifically paving removal and replacement, as well as drainage, water, sanitary, and storm system repairs. The estimated contract value ranges between 10 million and 25 million dollars, with a performance period of 730 days after award. Award will be based on the lowest price for two primary exhibit line items: building renovation and paving replacement. Proposals are due by November 23, 2026. Bonding requirements are tiered, with proposals exceeding 150,000 dollars requiring bid, payment, and performance bonds. The contractor must adhere to the Davis-Bacon Act, Buy American requirements, and ADA accessibility guidelines. Quality control is strictly managed through a three-phase process, and invoicing must be processed via Wide Area Work Flow with detailed supporting documentation.
Bristol Alliance of Companies

POSTED

about 10 hours ago

DEADLINE

in 30 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS