Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Nebraska was posted on January 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Halleck Park Inclusive Playground

Closed
2026-RFP-002State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541310
New
SLED
City of Santa Cruz Lifeguard Headquarters Repairs
Solicitation # RFQ No. SCFD-0334
The City of Santa Cruz is seeking architectural services for repairs to the Santa Cruz Fire Department Marine Safety Division Lifeguard Headquarters located at 1 Municipal Wharf. The project is focused on bringing the facility into a safe and operationally ready condition, specifically addressing items 1, 2, 3, and 6 from the Moffatt & Nichol inspection memo dated February 16, 2026. The scope of work is divided into six primary tasks: preparing 30% and 100% building permit plan sets and project specifications, providing a construction cost estimate, offering bid support during the bidding process, providing construction support, and delivering final as-built drawings and annotated specifications. The selection process is qualification-based, with the award granted to the most qualified architect whose fee does not exceed the project budget. The selected architect must adhere to professional standards from the AIA, ACEC, ASCE, and NSPE, and ensure full compliance with the Americans with Disabilities Act, specifically CBC 11B203.3 and CBC 11B204. Contractual requirements include adherence to California prevailing wage laws, the maintenance of city data confidentiality, and a specific site visit schedule including two progress visits, a punch list visit, and a final certification visit. There is no set-aside status for this solicitation.
Fire

POSTED

about 16 hours ago

DEADLINE

in 13 days
NAICS: 541310
New
Federal
INDEFINITE DELIVERY/ INDEFINITE QUANTITY (IDIQ) CONTRACT FOR ARCHITECT-ENGINEER (A-E) SERVICES FOR FACILITIES WITH SECURED SPACES LOCATED THROUGHOUT NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND AREA OF RESPONSIBILITY, WORLDWIDE
Solicitation # N6247026R0022
This Indefinite Delivery/Indefinite Quantity (IDIQ) contract is for multi-discipline Architect-Engineer (A-E) services to support the renovation, repair, and new construction of facilities with secured spaces worldwide, primarily within the Naval Facilities Engineering Systems Command (NAVFAC) Atlantic and Pacific areas of responsibility. The scope includes design for design-build and design-bid-build projects, site investigations, and facility accreditation support, with a strict requirement for compliance with ICD/ICS 705 physical and technical standards for SCIFs and SAPFs, as well as TEMPEST and RF attenuation requirements. The contract is set aside solely for small business concerns and is categorized under NAICS 541310. The contract structure consists of a two-year base period followed by three one-year option periods, with a total fee not to exceed $250 million and a guaranteed minimum of $10,000. Task orders will be awarded as firm-fixed-price. Evaluation is based on specialized experience, professional qualifications of key personnel, and past performance, with a specific emphasis on the firm's commitment to and utilization of small businesses. Key personnel, including architects and various engineers, must hold a Secret security clearance or higher, and joint ventures must obtain a Secret Facility Clearance from the Defense Counterintelligence and Security Agency.
Navfacsyscom Atlantic

POSTED

about 22 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The City of Papillion is seeking proposals from qualified consulting firms to design an inclusive playground at Halleck Park Large Pavilion, located at 712 E. Halleck Street in Papillion, Nebraska. The project aims to create a playground accommodating children aged 3 to 15, featuring accessible equipment and amenities that comply with ADA standards and impact attenuation requirements. The design scope includes site grading, foundations, playground equipment, landscaping, seating, surfacing, and other site improvements like demolition, drainage, and necessary permitting. The project also involves removing existing structures such as an old play structure, horseshoe pits, infected Ash trees, and concrete, while relocating a newer swing set within the new design. The inclusive playground must be connected via ADA-accessible routes to seven new handicapped parking stalls, positioned with a 40-foot drop-off zone at the entrance. Existing site elements like a large tree and a lighting structure will remain undisturbed. Additional features such as handicapped-accessible concrete paths, benches, trash receptacles, and picnic tables may be incorporated. This playground will be the first of its kind in the city's system and aims to showcase innovative design elements aligned with the provided Playground Design Guidelines. Proposals must be submitted by February 3, 2026, with primary contact information available for the Parks and Facilities Director and Contract Manager.

General Info

Design an ADA-compliant inclusive playground at Halleck Park with accessible features, landscaping, demolition.

Place of Performance

NE, USA

Set-Aside

NONE

Documents

3
PDF, High priority: read this first19 pages · rfp
High
PDF, High priority: read this firstspecifications
High
DOCX, High priority: read this first4 pages · sow
High

Read all 3 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Specialized Architectural Consulting (Accessibility/ADA)Open now, due in 33 days
  • City of Santa Cruz Lifeguard Headquarters RepairsOpen now, due in 14 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNebraska → Parks & Facilities
Contacts2 people available
OfficePapillion, NE, 68046, USA

Interested Companies (26)

7er Construction
ABcreativeDe Soto, KS
Alfred Benesch &Greenwood Village, Colorado

See All 26 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
The City of Papillion is requesting proposals from qualified consulting firms to design and provide design services for an all inclusive playground. The playground/park is at Halleck Park Large Pavilion, 712 E. Halleck Street in Papillion, NE. The proposed playground is to be an inclusive playground that incorporates equipment for children ages 3- 15 years old. A map of the site along with pictures are included in Appendix B. The overall work is to include development of bid documents for the design of the inclusive playground. The scope of the design work includes but not limited to the site grading, foundations, equipment, landscape, seating, and surfacing. Demolition, grading, drainage, site work, site furnishings, site concrete, USACE and other required permitting, and surfacing that is ADA-compliant and meets impact attenuation criteria, etc. This project seeks to meet the goals and guidelines set forth in the Playground Design Guidelines in Appendix A. The playground will be located along an ADA-accessible route that will connect to the playground to seven (7) new handicapped parking stalls. Removal of the old play structure, horseshoe pits, infected Ash Trees, and concrete, as well as the relocation of the current, newer swing set into the new design. This will be the first of it's kind in the city's playground system, so a great design utilizing imagination and innovation is desired. Handicapped accessible concrete paths, benches, trash receptacles, picnic tables can all be included in the design. The handicapped parking will be a nose-in parking area along the current driveway at the site. The new parking stalls will be separated by an approximately 40 foot area that will be utilized as the "drop off zone" for visitors and act as the entrance to the play area. Currently, a large tree and a OPPD cobra head lighting structure is located in this area, and will remain in place.

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS