Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Harbinger Motors/12821 Knott Street Project

Forecast
2025050492State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → City of Garden Grove

NAICS

N/A

Place of Performance

Knott Street and SR-22, CA, 92841

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Garden Grove
Contacts2 people available
OfficeN/A

Full Description

Show more
The proposed project includes the construction of a 10,338 sf mezzanine for additional office space within the existing approximately 173,000 sf (gross floor area) warehouse on the project site. All proposed improvements would be limited to the interior of the existing building and no exterior construction or revisions to the existing parking lot are proposed. All construction staging would be contained within the existing building, and all construction equipment would access the site from Knott Street on the east side of the project site. The project site’s zoning (PUD 104-70 [REV. 2019]) allows for the current use, and the current use would not change with implementation of the project. The maximum allowed FAR under the General Plan Land Use Designation IC is 0.50. The additional mezzanine office space would increase the FAR to 0.53. For the project site to remain in compliance with the General Plan Land Use designation and associated maximum FAR, an Amendment to the General Plan is proposed to establish two subareas within the existing IC land use designation. Parcels included in Subarea A (42 total) would retain the existing maximum FAR of 0.5. The maximum FAR that applies to parcels in Subarea B (5 total) would increase to 0.55.

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS