Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Iowa was posted on June 11, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Harmon Tunnel Highwall (Bluff) Scaling, Pammel State Park, Madison County

Closed
26-04-61-02State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
North of River Sanitary District No. 1 WRRF Upgrades and Expansion
Solicitation # north-river-sanitary-district-no-1-wrrf-upgrades-expansion
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North of River Sanitary District No. 1 WRRF Upgrades and Expansion project located in Bakersfield, California. The scope of work is extensive, covering civil and site work such as aggregates, trucking, asphalt paving, and curb and gutter; structural and finishing tasks including concrete reinforcing, masonry, welding, roofing, and painting; and specialized electrical and piping installations. Interested firms must contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a response deadline of September 17, 2026. The project is partially funded by the Water Infrastructure Finance and Innovation Act administered by the EPA, making it subject to the American Iron and Steel provisions, Davis-Bacon Related Acts, and DBE Program requirements. Eligible bidders include DBE, SBE, MBE, WBE, SBRA, LSFA, and HUB Zone small businesses, with DBEs required to provide valid certification from recognized bodies such as the US EPA or SBA. Qualified respondents must hold a valid California Contractor’s license and provide acceptable insurance. Additionally, responsible subcontractors may be required to provide bonding for 100% of their contract value, for which Kiewit will reimburse the premiums.
Kiewit Infrastructure West Co.

POSTED

about 12 hours ago

DEADLINE

in 4 days
NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and comprehensive revetment repairs involving clearing, grubbing, stone rework, and vegetation removal. The estimated contract value ranges between 1,000,000 and 5,000,000 dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. This opportunity is set aside for HUBZone Small Businesses, who are eligible for a 10 percent price evaluation preference. Bidders must submit sealed physical bids by September 30, 2026, as electronic submissions are not permitted. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel, including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. The contract stipulates liquidated damages of 2,297 dollars per calendar day of delay and requires a third-party qualified surveyor for pre- and post-dredge multi-beam hydrographic surveys to verify final quantities.
Healy Tibbitts Builders, Inc.

POSTED

about 12 hours ago

DEADLINE

in 17 days
NAICS: 237990
New
Federal
Station Umpqua River Floating Dock Repair
Solicitation # 70Z03326QSEAT0015
The Department of Homeland Security, through the U.S. Coast Guard Base Seattle, is soliciting bids for a firm-fixed-price contract to repair the floating pier at Station Umpqua River in Winchester Bay, Oregon. The project involves providing all personnel, equipment, and tools to remove deteriorated wooden whalers and hardware and install three layers of 4 by 12 inch wooden whalers, through rods, roller hoops, and an egress ladder, while reinstalling ten existing cleats. The estimated period of performance is from September 21, 2026, to October 22, 2026, with a required completion date of October 14, 2026. This is a total small business set-aside under NAICS code 237990. A mandatory site visit is scheduled for August 27, 2026, at 10:00 AM, and interested offerors must submit their attendee lists by August 26, 2026. Proposals are due by September 14, 2026, at 3:00 PM PST and must be submitted via email to the contracting officer. Submissions are limited to six pages and must include a completed SF 1442, a detailed price breakdown covering mobilization, materials, and labor, and a technical proposal detailing the approach and project schedule. Evaluation will be based on technical capability, past performance, and price, with technical capability being the most significant factor. Awardees must be registered in the System for Award Management and comply with Davis-Bacon Act wage determinations for Douglas County, Oregon.
Base SEATTLE(00033)

POSTED

1 day ago

DEADLINE

in 4 days

AI Contract Overview

Show more

This contract involves the careful removal of loose or unstable rock fragments and talus from the highwalls surrounding both tunnel portals at Harmon Tunnel in Pammel State Park, Madison County. The work is restricted to manual, mechanical, or chemical (non-explosive) methods and excludes any blasting. It includes the complete removal and disposal of all debris generated from scaling operations within the designated zone of influence, as well as loose material in the area between this zone and the tunnel pavement. Personnel performing the scaling must have proven experience, with foremen and workers required to have completed similar projects at least three times in the past five years and to have a minimum of two years of full-time rock slope stabilization experience. The solicitation is issued by the Iowa Department of Natural Resources and bids must be submitted electronically by June 25, 2026, at 3:00 PM. The project location is in Madison County, Iowa, and all relevant plans and bidding instructions are provided through the official bid portal. The contact for the project is Darin Galbraith, reachable via email or phone for inquiries related to the bid submission and project details.

General Info

Remove loose rock fragments from Harmon Tunnel highwalls using non-explosive methods; experienced personnel required.

Agency

Iowa → Department of Natural ResourcesView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Madison County, IA, USA

Set-Aside

NONE

Documents

(2)

26-04-61-02 Harmon Tunnel Highwall Scaling Competitive Quotation

PDFrfq

26-04-61-02 Harmon Tunnel Highwall Scaling Requirements

PDFspecifications

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyIowa → Department of Natural Resources
Contacts1 person available
OfficeDES MOINES, IA, 50321, USA
Organization / Agency
Iowa → Department of Natural Resources
View Agency Profile
Office AddressDES MOINES, IA, 50321, USA

Full Description

Show more
"This work includes the removal of loose or potentially unstable disjointed spalled/ exfoliated bedrock fragments and talus above/ around both tunnel portal highwalls (within the zone of influence as depicted in the Drawings) by manual, mechanical or chemical (non-explosive) methods. Includes removal and disposal of all spoil resulting from the highwall scaling operation and all loose material located in the area between the 'zone of influence' and the tunnel pavement. Blasting is not permitted. Each rock slope scaling foreman and all personnel conducting work or activities related to scaling operations shall have performed satisfactory work on three similar projects within the last five years. All personnel must have a minimum of two years of full-time experience in rock slope stabilization that includes rock scaling."
Please see the plans and bid package as noted below. Bid Closing Date and Time: 6/25/2026 at 3:00 PM. Bids must be submitted electronically as directed in the General Information and Instructions to Bidders.

More opportunities from Iowa → Department of Natural Resources

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS