Harmony High School Baseball and Softball Sports Lighting Replacement Project

Closed
osceola-county-school-board-sdoc-26-b-074-ml-2026State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
Transformer Oil Testing Services
Solicitation # RFP-VC-26-010
The Inland Empire Utilities Agency is seeking proposals under solicitation RFP-VC-26-010 for transformer oil testing services to enhance the reliability, safety, and maintainability of its transformers. The project focuses on three primary areas: conducting visual and infrared thermographic inspections to identify thermal anomalies, installing standardized external oil sampling devices for safer collection, and performing comprehensive oil testing analysis. Key deliverables include annotated inspection results, written condition reports for each asset, standard operating procedures, and on-site training for up to 20 agency staff members. All work must adhere to NETA MTS, IEEE, NFPA 70E, and ASTM D923 standards, with infrared inspections performed by ASNT Level 1 certified technicians or equivalent. This is a not-to-exceed contract with fixed pricing, intended as a single award to the most capable and cost-effective offeror. Qualified bidders must have completed at least two similar projects within the last five years, including one for a utility or industrial facility and one combining oil testing with infrared inspections. Proposals are due by December 23, 2026, via the PlanetBids portal and must include a detailed staffing plan, methodology, and required certifications such as a Non-Collusion Statement and Workers Compensation Certificate. The agency also emphasizes cybersecurity compliance, requesting SOC 2 reports or completed CAIQ forms, and requires contractors to be registered with the Department of Industrial Relations as public works contractors.
Inland Empire Utilities Agency

POSTED

about 5 hours ago

DEADLINE

in 2 months
NAICS: 238210
New
Centennial JCC Emergency Lighting Replacement, Upgrade, Testing & Maintenance Services
Solicitation # centennial-jcc-emergency-lighting-replacement-upgrade-testing-maintenance-services
Management and Training Corporation is soliciting bids for a fixed-price, single lump sum contract to provide emergency lighting replacement, upgrade, testing, and maintenance services at the Centennial Job Corps Center in Nampa, Idaho. The project involves inspecting, repairing, and certifying emergency lighting systems in compliance with NFPA 101 (2024 Edition), NFPA 70, and OSHA regulations. Key deliverables include the integration of fixture data and the establishment of an automated 30-day functional testing schedule within the facility's Computerized Maintenance Management System. The estimated contract value ranges from $25,000 to $100,000, with a performance period of 30 business days following the written Notice to Proceed. Bids are due by December 1, 2026, and will be awarded based on overall best value. Mandatory requirements for submission include a physical site visit, a detailed cost breakout on company letterhead, and a bid bond guarantee of 20% for bids exceeding $25,000. Awarded contractors must provide performance and payment bonds from a surety with at least an A- rating. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certifications. Compliance with the Davis-Bacon Act, Federal Contractor Minimum Wage requirements, and various FAR clauses regarding security, whistleblower rights, and small business utilization is required.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 5 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The School Board of Osceola County awarded contract C-26-1039-ML to M. Gay Constructors, Inc. for a total cost of 281,000.00 dollars to perform a turnkey LED lighting replacement for the baseball and softball fields at Harmony High School. The project scope includes the removal of existing fixtures and the installation of energy-efficient LED systems, including new drivers, galvanized steel tubular cross-arms, and surge protection. The installation must adhere to strict performance standards, including specific target illumination levels for infields and outfields, a minimum color temperature of 5700K, and a CRI of 75 plus. A primary objective of the design is environmental light control to minimize glare and spill light to neighboring properties and players, requiring the use of internal and external shields and louvers. The contractor is responsible for securing all necessary permits and ensuring all components withstand 150 mph winds and meet NEC and NFPA780 grounding standards. Performance is guaranteed through a 10-year warranty ensuring that light levels do not drop below specified target values. The project timeline established a commencement date of May 29, 2026, with final completion required by August 28, 2026. Compliance requirements include adherence to federal terms and conditions, a 10 percent Small Business Enterprise and Veteran Business Enterprise participation goal, and the provision of performance and payment bonds.

General Info

M. Gay Constructors will install LED lighting at Harmony High School for 281,000 dollars.

Documents

17

Attachment A - ITB General Terms and Conditions

PDF, High priority: read this firstspecifications
High

Attachment B - ITB Respondents Acknowledgement and Required Forms

PDF, High priority: read this firstbidder-acknowledgement
High

Attachment D - Price Sheet: Harmony High School Baseball and Softball Sports Lighting Replacement Project

PDF, High priority: read this firstbid-schedule
High

Attachment E - SBE/VBE Program Participation Form

PDF, High priority: read this firstsupporting-document
High

Attachment G - Federal Terms and Conditions

PDF, High priority: read this firstspecifications
High

Attachment H - Bidder's Statement of Principal Place of Business

PDF, High priority: read this firstother
High

Attachment L - Architectural Drawings

PDF, High priority: read this firstspecifications
High

BID # SDOC26-B074-ML Addendum #1 - Harmony High School Sports Lighting

PDF, High priority: read this firstamendment
High

Harmony High School Baseball and Softball Sports Lighting Replacement Project

PDF, High priority: read this firstsow
High

School District of Osceola County Construction Agreement Draft

PDF, High priority: read this firstcontract-document
High

Attachment C - References Form

PDF, Low prioritypast-performance
Low

Attachment K - Performance Bond (School District of Osceola County)

PDF, Low priorityperformance-bond
Low

Bid # SD OC-26-B-074 ML - Harmony High School Baseball & Softball Sports Lighting Project

PDF, Low priorityaward
Low

Board Approval: Harmony High School Sports Lighting Replacement (SDOC-26-B-074-ML)

PDF, Low priorityaward
Low

Harmony High School Baseball and Softball Lighting Replacement - Pre-Bid Sign-in Sheet

PDF, Low priorityprebid-meeting-sign-in
Low

School District of Osceola County - Payment Bond

PDF, Low prioritypayment-bond
Low

School District of Osceola County - Report of Unsatisfactory Materials and/or Service

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Osceola County School Board — Maintenance
Contacts2 people available
OfficeFL
Office AddressFL
Contacts
Melanie Lachmiller

Full Description

Show more
This Specification establishes the minimum requirements for this solicitation, listed and described in the body of these specifications, to be used as noted, by The School Board of Osceola County, FL. The intent of this bid is to secure firm fixed pricing for the lighting system performance and design standards for the Baseball and Softball Fields at Harmony High School, using an LED Lighting source. The contractor shall supply lighting equipment to meet or exceed the standards set forth in these specifications. A. Field to be lit: 1. Softball– 200’ 2. Baseball – 315’/350’/315’ B. The primary goals of this sports lighting project are: 1. Guaranteed Light Levels for each field. Light levels are guaranteed to not drop below specified target values for a period of 10 years. 2. Environmental Light Control: It is the primary goal of Osceola County School District to reduce spill light to adjoining properties as well as reduce glare to the players, spectators and neighbors. The LED design should incorporate glare control. The LED design should provide equal to or better glare control than what is currently installed. 3. The preferred lighting system shall be energy-efficient and cost effective to operate. Fixture Types to be comparable to Mucso’s TLC-LED-1500, TLC-LED-1200, TLC-LED-550, TLC-LED-900 or equivalent. 4. Contractor shall be responsible for securing necessary permits. 2.01 LIGHTING PERFORMANCE A. Venues to be lit to an average target illumination level and uniformity as specified in the chart below. Lighting calculations shall be developed, and field measurements taken on the grid spacing with the minimum number of grid points specified below. Appropriate light loss factors shall be applied and submitted for the basis of design. Average illumination level shall be measured in accordance with the IESNA LM-5-04 (IESNA Guide for Photometric Measurements of Area and Sports Lighting Installations). Illumination levels shall not drop below desired target values in accordance to IES RP-6-15, Page 2, Maintained Average Illuminance and shall be guaranteed for the full warranty period. Area of Lighting Average Target Illumination Levels Maximum to Minimum Uniformity Ratio Grid Points Grid Spacing Softball Infield 50fc 2.0:1 25 20` x 20` Softball Outfield 30fc 2.5:1 152 20` x 20` Baseball Infield 50fc 2.0:1 25 30` x 30` Baseball Outfield 30fc 2.5:1 70 30` x 30` B. LED Color: The lighting system shall have a minimum color temperature of 5700K and a CRI of 75+. C. Mounting Heights: Existing poles Field Pole Designation Number of Poles Pole Height Softball All Poles 5 60’ Baseball All Poles 6 70’ 2.02 ENVIRONMENTAL LIGHT CONTROL A. All luminaires shall utilize spill light and glare control devices including, but not limited to, internal shields, louvers and external shields. B. The desire of The Osceola School District is to reduce spill and glare to the community and the players. The criteria below must be submitted with your bid for the design engineer to make that determination C. The first page of a photometric report for all luminaire types proposed showing horizontal and vertical axial candle power shall be provided to demonstrate the capability of achieving the specified performance. Reports shall be certified by a qualified independent testing laboratory with a minimum of five years` experience or by a manufacturer’s laboratory with a current accreditation under the National Voluntary Laboratory Accreditation Program for Energy Efficient Lighting Products. A summary of the horizontal and vertical aiming angles for each luminaire shall be included with the photometric report. D. In accordance with IES RP 6-20, manufacturers must submit candela glare readings at 150’ from the fields edges in all directions. E. The Fixtures proposed shall be the same or better at controlling glare to the community. Therefore, the candela shall not exceed the candlepower at the specified degrees above the center of the beam in the vertical plane as specified in the following table. Information must be verified by the photometric report required. NEMA Classification of Vertical Beam Candela Degrees Above the Center of the Beam in the Vertical Plane 4 10,348 19.5 degrees 2.03 LIGHTING FOR AERIAL SPORTS A. For fixtures that provide less than 10,000 candelas above 22 degrees vertical, the owner requires luminaires mounted approximately 15’ above grade to provide targeted light above the playing field. These fixtures will not emit direct light less than 10° above the horizon, and no more than 10% of the total (directly) applied lumens as modeled may be in this area. 2.04 REMOVAL OF EXISTING FIXTURES A. Disconnect and remove existing light fixtures from the baseball field poles. B. Disconnect and remove existing light fixtures from the softball field poles. C. Properly dispose of removed fixtures in accordance with local regulations. 2.05 INSTALLATION OF NEW LED FIXTURES A. Install new Musco model TLC-BT-575 LED drivers or equal at the lower portion of each pole in the existing box for ease of access and maintenance. B. All wiring shall be enclosed within the cross-arms, pole, or electrical components enclosure. No external wiring or SO Cords are allowed C. Replacing the existing crossarms with Galvanized steel tubular cross-arm assembly. Angle Iron crossarms are not allowed D. Contractors will remote all drivers and supporting electrical equipment in aluminum enclosures mounted approximately 10 feet above grade. The enclosures shall be touch-safe and include drivers and fusing with indicator lights on fuses to notify when a fuse is to be replaced for each luminaire. Disconnect per circuit for each pole structure will be located in the enclosure. Integral driver fixtures will not be accepted. Active cooling technologies will not be considered. E. Contractors shall provide surge protection at the pole equal to or greater than 40kA for each line to ground (Common Mode) as recommended by IEEE C62.41.2_2002. F. Wire harnesses from the top of the pole to the remote driver are required, complete with an abrasion protection sleeve, strain relief and plug-in connections for fast, trouble-free installation. G. All luminaires, visors, and cross-arm assemblies shall withstand 150 mph winds and maintain luminaire aiming alignment. H. Contractor shall verify the grounding of each pole. Ohm reading must be taken, and reading must be below published standards. I. All system components shall be UL listed for the appropriate application. J. Ensure grounding components meet minimum standards required by NEC and NFPA780. K. New lightning down conductor(aluminum) and 5/8” copper ground rod on poles 75’ or less use 1/0 AWG, poles. L. Ensure all components are bonded to both equipment and lightning grounds. No upward sweeps allowed for lightning down conductor or bonding jumper(s). M. Test ground resistance with 3-point megger and confirm 25 ohms or less for each pole. Install additional ground rods or create grounding grid until resistance of 25 ohms or less is achieved. N. Lights shall be turned on/off primarily by the use of contactors. O. System shall provide for instant on/off of luminaires. 2.06 FIELD QUALITY CONTROL A. Field Light Level Accountability 1. Light levels are guaranteed not to fall below the target maintained light levels for the entire warranty period of 10 Years. 2. The contractor/manufacturer will be held responsible for any and all changes needed to bring these fields back to compliance for light levels and uniformities. Contractor/Manufacturer will be held responsible for any damage to the fields during these repairs. 2.07 WARRANTY AND GUARANTEE FOR PRODUCT A. 10-Year Warranty: Each manufacturer shall supply a signed warranty covering the entire system for 10 years from the date of Installation. Warranty shall guarantee specified light levels. Warranty does not cover weather conditions, events such as lightning or hail damage, improper installation, vandalism or abuse, unauthorized repairs or alterations, or products made by other manufacturers. 2.08 RESPONDENT’S QUALIFICATIONS A. Certified Electrical Contractor’s License for Electrical Work, issued by the State of Florida Construction Industry Licensing Board according to Florida State Statutes, Chapter 489. 2.09 RESPONDENTS REQUIREMENTS A. The Contractor shall furnish all labor, tools, equipment, transportation, utilities and materials to provide a total turnkey project at Harmony High School as required by the School Board’s Project Manager. B. The Contractor shall supervise and direct the Work, using the Contractor’s best skill and attention. The Contractor shall be solely responsible for all means, methods, techniques, sequences and procedures for coordinating all portions of the Work as a result of this ITB.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS