This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on June 18, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Hatch Stagefield Air Traffic Control Tower Equipment Movement
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
This is a Firm Fixed Price contract awarded as a 100% Total Small Business Set-Aside under NAICS code 238210, solicited under W9124G-26-R-A007 for the movement and reinstallation of Air Traffic Control (ATC) equipment at Hatch Stagefield, Fort Rucker, Alabama. The work involves the complete de-installation of existing ATC systems from the current tower and their installation into a newly constructed tower, including all required cabling, grounding, and integration of Government Furnished Equipment such as three operator positions in the tower cab and one maintenance position in the equipment room. The contractor is responsible for installing 12 runs of 1/2 inch Heliax cabling with connectors and four TACO antennas for 12 radios, all in strict compliance with FAA-STD-019e and MIL-STD-188-124(B) standards. A pre-installation site survey must be conducted resulting in a combined Site Survey Report and Project Concurrence Memorandum, with weekly progress meetings required throughout the project. Performance is scheduled from September 18, 2026, to September 17, 2027, with all work performed on-site at Fort Rucker. The contract mandates a comprehensive Quality Control Plan compliant with ISO 9001:2008, submitted within 30 days of award, and ongoing surveillance by government quality assurance personnel. Operational testing of all installed systems must be performed by the contractor and verified by a NAVAIDS representative, culminating in a jointly signed Technical Acceptance Recommendation report. All proposals must be submitted electronically by 4:00 p.m. Central Daylight Time on June 30, 2026, to the designated point of contact, with copies to the secondary POC, using only Microsoft Office formats or PDF for SF 1449. Proposals are to be structured into four volumes covering contract documentation, technical approach, past performance, and pricing. The solicitation enforces a Lowest Price Technically Acceptable source selection methodology, where proposals must pass critical eligibility gates including conformity to the Statement of Work, completeness of the pricing schedule, technical acceptability, and price reasonableness. No trade-offs between cost and non-cost factors are permitted, and failure on any pass/fail gate renders an offer ineligible. Contractors must comply with numerous FAR and DFARS clauses including security prohibitions,
General Info
Agency
NAICS
Place of Performance
Fort Rucker, AL, 36362, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
18 JUNE 2026 UPDATE: AMENDMENT 0001 HAS BEEN POSTED. SEE ATTACHMENTS FOR FURTHER DETAILS.
This non personal services requirement is being competed as a Firm Fixed Price 100% Total Small Business set aside, under NAICS 238210 and PSC N059.
The contractor shall provide all personnel and supervision required to perform the de-installation of Air Traffic Control (ATC) equipment in the existing Air Traffic Control Tower (ATCT) at Hatch Stagefield, Fort Rucker, Alabama and the installation of the ATC equipment into newly constructed ATCT as per building design. Installation shall include all required cabling and grounding as specified in the appropriate regulations and standards FAA-STD-019e and MIL-STD-188-124(B).
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS