Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on October 6, 2010. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Havilah Work Center Water System Rehabilitation & Reconstruction for hte Sequoia National Forest

Awarded
AG-9A40-S-10-0045Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational facility, including the installation of pumps, a generator, odor control equipment, new gravity sewers, and manholes, while managing by-pass pumping, testing, and commissioning. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 12, 2026, and must be submitted using the EJCDC C-410 Bid Form. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and proof of insurance. Technical standards include AWWA Specification C-600 for pipelines, NEMA MG1 for motors, and AWS D1.2 for aluminum welding. Project administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via Applications for Payment, with terms set at 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 8 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The Havilah Work Center Water System Rehabilitation and Reconstruction project for the Sequoia National Forest involves extensive site work and infrastructure upgrades. Key deliverables include the replacement of 2000 linear feet of waterline, installation of new control valves and hydrants, and the construction of a new 20,000 gallon ground mounted bolted steel water storage tank on a new concrete foundation. The scope also requires the rehabilitation and deepening of an existing water well, installation of new pump and well head controls, and the dismantling of the old storage tank for government retention. Located on the Kern River Ranger District approximately 11 miles south of Lake Isabella, the project is estimated to cost between 100,000 and 250,000 dollars. The contract specifies a performance period of 150 calendar days with an estimated start date of September 6, 2010. This unrestricted solicitation was managed by the Sierra National Forest under the Department of Agriculture.

General Info

Contract Value

$224,339.19

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

Sequoia National Forest 1839 S. Newcomb Street, PORTERVILLE, CA, 93257, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

2 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Sierra National Forest
Contacts2 people available
OfficeCLOVIS, CA, 93611, USA
Office AddressCLOVIS, CA, 93611, USA
Contacts
Nancy L. RuggeriContracting Officer
Teresa PorterProcurement Assistant

Full Description

Show more
The work includes, but is not limited to the following major items: ? Facilities Related Site Work o Demolition of miscellaneous existing features and underground utilities o Replacement of approximately 2000 LF of existing waterline of various sizes. o New control valves and boxes, hydrants, and fire hydrants. o Connection to existing waterlines at the building connections at existing locations. o Patch paving to include excavation and backfill of utility lines. o Connection to the new water storage tank and new controls. o Complete geotechnical report for the steel bolted tank foundation. o Dismantling of the old water storage tank for retention by the government. o Removal of old gravel ringwall foundation and construction of a new concrete tank foundation. o New 20,000 gallon ground mounted bolted steel water storage tank. o Rehabilitation of the existing water well and/development to include increasing the depth. o New well control lines, conduit, with new controls. o New pump and well head controls at the existing well head. o Installation of one cattle guard. The project is located at the Forest Service Havilah Work Center, on the Kern River Ranger District of the Sequoia National Forest. The project site is located approximately 11 miles south of Lake Isabella on County Road 483. A pre-bid tour will be conducted on August 4, 2010 at 10 a.m. at the existing Havilah Work Center on Bodfish Caliente Rd. Contractors should notify the Contracting Officer of their intent to attend the pre-bid tour. The price range of this project is between $100,000 and $250,000. The estimated contract time is 150 calendar days. Estimated start work date is September 6, 2010. Issue date is approximately July 14, 2010 with a closing date of approximately August 17, 2010. This project is being issued unrestricted.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS