Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on September 18, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Hawthorne Army Depot New Bomb Request for Information

Closed
W519TC-25-I-HWADFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)
Solicitation # W912DQ26RA065
The U.S. Army Corps of Engineers, Kansas City District, is soliciting design-build construction services for the installation of access manholes at the Fairfax-Jersey Creek Levee Unit on the Missouri River in Kansas City, Kansas. The project scope involves designing and constructing manholes, with estimated depths between 10 and 25 feet, to facilitate the video inspection of approximately 27,000 feet of existing perforated corrugated metal seepage collector pipe. To maintain levee integrity, the government strictly prohibits invasive mass excavation methods such as trenching, requiring the use of minimally invasive excavation techniques. Key deliverables include a Drilling and Invasive Program Plan approved by a licensed professional engineer or geologist, temporary flood protection plans, and final as-built drawings. This is a firm-fixed-price contract with an estimated magnitude between $1,000,000 and $5,000,000, though the total award amount shall not exceed $3,400,000. The acquisition is categorized under NAICS code 237990 with a small business size standard of $45 million. The selection process is conducted in two phases; Phase 1 focuses on qualifications and technical approach without pricing, from which up to three qualified offerors will be selected for Phase 2. Evaluation factors include design concepts, performance confidence, technical approach and qualifications, and small business participation, with non-price factors being significantly more important than price. Proposals must be submitted via the PIEE Solicitation Portal and adhere to strict documentation requirements, including the use of specific government templates for vendor information, experience, and technical qualifications.
W071 Endist Kansas City

POSTED

about 9 hours ago

DEADLINE

in 6 days
NAICS: 237990
New
Federal
PASS-A-GRILLE-PASS, MAINTENANCE DREDGING, PINELLAS COUNTY, FLORIDA
Solicitation # GROUP1-27-R-J001
Solicitation GROUP1-27-R-J001 is a total small business set-aside for maintenance dredging at Pass-a-Grille Pass in Pinellas County, Florida, issued by the U.S. Army Corps of Engineers, Jacksonville District. This firm fixed price task order is limited to contractors previously awarded under solicitation W912EP25R0010. The scope of work involves excavating material from the pass and transporting it to the Pass-a-Grille Beach Placement Area located north of the channel. Hopper dredging is strictly prohibited. Incidental requirements include environmental and water quality monitoring, beach fill quality control, tilling, vibration monitoring, and Munitions and Explosives of Concern construction support. The project has a price target range between $5,000,000 and $10,000,000, with a performance period of 120 calendar days following the Notice to Proceed, and work must commence within 60 calendar days of that notice. The government will utilize the Lowest Price Technically Acceptable process for award, evaluating offerors based on the technical acceptability and availability of their identified dredge and their past performance under the associated MATOC. Proposals must be submitted in PDF format via the PIEE Solicitation Module by 2:00 PM EST on November 20, 2026. Key compliance requirements include adherence to the Davis-Bacon Act, the provision of performance and payment bonds within 10 days of award, and the submission of qualified bird monitor credentials. Technical specifications require beach fill to be clean sand free of debris or toxic materials, with strict monitoring at both the borrow and placement areas to ensure quality standards are met.
W074 Endist Jacksnvlle

POSTED

about 9 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
Federal
Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
Solicitation # W912DS26RA032
Solicitation W912DS26RA032 is a competitive two-phase design-build procurement issued by the US Army Corps of Engineers, New York District, for the Port Monmouth Phase II Contract 1 Mitigation project in Middletown, New Jersey. With an estimated project magnitude between $15 million and $30 million, the scope involves the design and construction of wetland and upland restoration at the Pews Creek and Compton Creek mitigation sites. The project aims to reduce storm damages from coastal erosion and flooding in Raritan Bay, specifically focusing on restoring approximately 24.83 acres of wetlands and channels and 8.76 acres of uplands. The State of New Jersey Department of Environmental Protection serves as the non-Federal sponsor. The procurement follows a best-value tradeoff process in accordance with FAR 36.3, where non-price evaluation factors are approximately equal in importance to price. Phase One focuses on qualifying offerors based on specialized experience and past performance to shortlist up to five firms for Phase Two. Final award will be a firm fixed-price contract. Key requirements include strict adherence to New Jersey environmental standards, the provision of performance and payment bonds, and compliance with the Davis-Bacon Act. Following multiple amendments, the final response deadline for proposals was extended to October 21, 2026.
W2SD Endist New York

POSTED

about 9 hours ago

DEADLINE

in about 21 hours
NAICS: 237990
New
Federal
Stove Prairie Campground Gate Replacement
Solicitation # 117346
The USDA Forest Service, CSA Intermountain, is soliciting quotes for the disposal and replacement of a broken 32-foot double lane closure gate at Stove Prairie Landing in Bellvue, Colorado. This project is a total small business set-aside under NAICS code 237990, with an estimated project magnitude between $25,000 and $100,000. The award will be a firm fixed-price contract. The selected contractor must provide all labor, materials, and equipment for mobilization and the installation of the gate, ensuring all signage meets MUTCD standards and concrete work adheres to specific AASHTO sampling and testing requirements. Work must commence within 10 calendar days of the notice to proceed and be completed by August 31, 2027. Evaluation will be based on best value, focusing on the offeror's technical approach and price. Applicants must submit a 1-3 page technical narrative and a construction schedule, such as a Gantt chart, along with their pricing documentation. All quotes must be submitted via email to Contract Specialist Jordan Carlsen by November 11, 2026, at 14:00 EST. The contract requires the provision of performance and payment bonds and mandates that all invoicing be processed through the electronic Invoice Processing Platform (IPP) system. The government will conduct inspections at all reasonable times before final acceptance in accordance with FAR 52.246-12.
Csa Intermountain 8 Usda-Fs

POSTED

about 9 hours ago

DEADLINE

in 22 days
NAICS: 237990
New
SLED
Madera Unified School District Outdoor Education FacilityThe Madera Unified School District is proposing the construction and operation of the Outdoor Educational Facility Project located at the intersection of Almond Avenue and Stadium Road in Madera, California. This project involves the development of a 25.61-acre complex designed for district educational programs, youth sports, community events, and general public recreation. The facility will feature five ball fields, three soccer fields, five sand volleyball courts, a parking lot with approximately 313 spaces, and two support buildings comprising an office, training, and storage facility, as well as a ticket booth and restroom building. The scope also includes roadway, sidewalk, and utility improvements along the project frontage and the expansion of a City-owned stormwater basin. The project is governed by the California Environmental Quality Act (CEQA), with a Draft Initial Study and Mitigated Negative Declaration indicating that the project will not cause significant environmental harm provided specific mitigation measures are implemented. Key requirements include the use of full cut-off lighting fixtures, strict adherence to nesting bird protection windows between February and August, archaeological monitoring for excavations exceeding three feet, and paleontological discovery protocols. The project is managed by Rosalind Cox, Director of Facilities Planning, and involves coordination for potential annexation of portions of the site into the City of Madera.
Madera Unified School District

POSTED

about 14 hours ago

DEADLINE

N/A

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

NV, 89415, USA

Set-Aside

NONE

Documents

6

Hawthorne Army Depot - Existing Hydro Soils Groups (070224)

PDF, High priority: read this first1 page · specifications
High

Hawthorne Army Depot (HWAD) New Bomb Design and Build SOW

PDF, High priority: read this firstsow
High

Hawthorne Army Depot - Hydrology Basins Control Points (07/02/2024)

PDF, High priority: read this first1 page · specifications
High

HWAD Maps of Clearance Areas

PDF, High priority: read this first1 page · specifications
High

HWAD New Bomb Stormwater Detention Basins and Channel Clean-Up SOW

PDF, High priority: read this firstsow
High

TS-W519TC-24-R-0003 Geotechnical Investigation Report

PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

special-notice

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W6QK Acc-Ri
Contacts2 people available
OfficeROCK ISLAND, IL, 61299-0000, USA
Office AddressROCK ISLAND, IL, 61299-0000, USA

Full Description

Show more

The Army Contracting Command - Rock Island, on behalf of Headquarters, Joint Munitions Command is issuing a request for information notice to identify capable sources for two stormwater detention pond projects at Hawthorne Army Depot (HWAD) in Hawthorne, NV. The first project includes clean-up/rehabilitation of the stormwater dry detention ponds. The second project includes design and construction of stormwater detention ponds.


REQUIREMENT DESCRIPTION: Project one requires rehabilitation of storm water controls at the New Bomb open burn/open detonation demilitarization site. The requirement will include clearance of material from storm water detention ponds resulting from a flood event in accordance with the attached statement of work titled New Bomb Stormwater Detention Basins and Channel Clean-Up SOW. The potential for unexploded ordnance exists and must be considered in the cleanup of collected silt in stormwater detention ponds and spillways.


Project two requires the design and construction of storm water controls capable of withstanding a 500-year flood event and contain a 100-year event in accordance with the attached statement of work titled New Bomb Design and Build SOW.


The intent is for project one and the design part of project two to be completed concurrently with the construction part of project two to begin immediately after to avoid double movement of material and equipment as much as possible. Nearby storage location for transient materials is available, and aggregate can be stored on site for later reuse in construction of ponds and spillways.


RESPONSES: Interested vendors are invited to indicate their interest by providing the U.S. Government with the following information no later than 0900 central on 14 October 2025:


  1. Provide a brief summary of the company’s capabilities (a description of the facilities, equipment, personnel experience, quality system, and past/current relevant experience). Any potential key subcontractors shall also be addressed, by indicating which key tasks or processes would be subcontracted and provide a brief summary of potential key subcontractors.
  2. Discuss the feasibility of the period of performance for tasks in each SOW. Does the contractor have the ability to accelerate the timeline? Can they be accelerated? Can any of this work be completed concurrently to create timeline efficiencies?
  3. Provide a Rough Order of Magnitude for each SOW. List all assumptions and basis of estimate.
  4. Discuss the advantages/disadvantages to the U.S. Government regarding the award of these two projects together to one contractor versus competing them separately.
  5. Discuss preferred contract type to include advantages to the U.S. Government and mitigation of risk.

This  request for information post is for information and planning purposes only and shall not be construed as a Request for Proposal or as an obligation on the part of the U.S. Government. The U.S. Government does not intend to award a contract on the basis of this request for information post or otherwise pay for information received.


Industry responses to this request for information post will not represent binding offers, and the U.S. Government cannot accept an industry response to form a binding contract. The U.S. Government intends to use any information submitted in response to this request to determine a path forward for meeting the described requirements.


In order to be eligible for contracts with the U.S. Government, Contractors must be registered in the System for Award Management (SAM) database prior to award, during performance, and through final payment of any contract resulting from a planned solicitation for these items. Contractors may obtain information on SAM registration by visiting: https://www.acquistion.gov. All interested companies are highly encouraged to get registered in SAM immediately.


The U.S. Government will hold all information submitted in a confidential status. Response to this request for information shall be provided via email to John Fotos at john.g.fotos.civ@army.mil and Ashley Korves at ashley.m.korves.civ@army.mil. Submit questions to contact Contract Specialist, Ashley Korves, via email at ashley.m.korves.civ@army.mil.


ATTACHMENTS:


  • New Bomb Stormwater Detention Basins and Channel Clean-Up SOW
  • HWAD Maps of Clearance Areas
  • New Bomb Design and Build SOW
  • HWAD NEW BOMB Drainage Improvements Project- Geotechnical Investigation Report
  • HWAD-NewBomb - ExistingHydroBase - 070224-ExHydroSoilsGroups
  • HWAD-NewBomb - ExistingHydroBase - 070224-Hydrology BasinsControlPoints

More opportunities from Department Of Defense → W6QK Acc-Ri

Same awarding agency

NAICS: 541380
New
Federal
Granite Surface Plate Calibration and lapping - updated Docs
Solicitation # W519TC27QA007
Solicitation W519TC27QA007, issued by the Army Contracting Command - Rock Island, seeks an ISO 17025 accredited vendor to provide annual inspection, calibration, and lapping/repair of granite surface plates at the Rock Island Arsenal Joint Manufacturing and Technology Center in Illinois. This Firm Fixed Price contract consists of a base year running from February 2, 2027, to February 1, 2028, with four subsequent one-year option periods. All work must adhere to ASME B89.3.7 for flatness and ANSI Z-540-1 standards traceable to NIST. Key deliverables include the application of calibration stickers to each plate and the submission of a Service Acceptance Report within three business days of completion. To be considered, vendors must submit their proposals by November 9, 2026, including proposed fixed prices for all periods, documentation of technical capability, and a signed concurrence of the Scope of Work. Personnel requiring installation access must complete AT Level I awareness training and comply with strict security mandates, including CAC requirements and iWATCH briefings. Award evaluation is based on price and technical capability. Contract administration will be managed through the Wide Area WorkFlow system for invoicing, and performance will be monitored via a 100 percent inspection surveillance method as outlined in the Quality Assurance Surveillance Plan.
Testing Laboratories and Services

POSTED

about 9 hours ago

DEADLINE

in 20 days
View Details
NAICS: 541612
New
Federal
DRAFT RFPs – Human Resource Solutions, GEN VI IDIQ Contracts
Solicitation # W519TC-26-R-AHRS
The Army Contracting Command - Rock Island is seeking industry feedback on draft Requests for Proposals for the Sixth Generation (GEN VI) Human Resource Solutions multiple-award IDIQ contract suites. This procurement is divided into two primary components: Personnel Lifecycle Support (PLS) and Recruiting Management Administrative Support (RMAS). The PLS suite has a total estimated cumulative ceiling value of approximately 6.09 billion dollars, while the RMAS suite is estimated at approximately 1.52 billion dollars. Both contracts are structured as 10-year IDIQs, consisting of a five-year base period and a five-year option period. This is a 100 percent small business set-aside, with a minimum of 10 awards reserved specifically for small business offerors. The scope of work involves providing enterprise-level human resource knowledge-based services, training, manpower forecasting, and administrative support for the Department of Defense and other federal agencies. Evaluation for the base IDIQ awards will be based on acceptability factors, specifically Technical capability and Past Performance, with Corporate Experience being the most significant technical subfactor. Price will not be evaluated for the initial IDIQ award but will be used for subsequent task order awards. Proposals must be submitted electronically via the PIEE suite, and awardees will be required to maintain specific security clearances and adhere to strict quality control and reporting standards.
Human Resources Consulting Services

POSTED

about 9 hours ago

DEADLINE

in 6 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS