Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Subcontract opportunity from California was posted on June 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Hazardous Waste Characterization and Packaging

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541620
New
Grant
Natural Climate Solutions Grant Program Round 2
Solicitation # https://dep.nj.gov/wp-content/uploads/climatechange/ncs_r2_nofa.pdf
The Natural Climate Solutions Grant Program Round 2 is a state grant opportunity administered by the New Jersey Department of Environmental Protection (NJDEP) to fortify natural carbon sinks through blue and green carbon sequestration projects. With a total funding pool of 30 million dollars, the program is split equally between blue carbon projects focusing on coastal ecosystems and green carbon projects focusing on terrestrial forest restoration. Individual awards range from a minimum of 250,000 dollars to a maximum of 5 million dollars, with project durations typically spanning three to five years. Applications must be submitted via the NDEP SAGE system by the deadline of December 31, 2026. Funding is awarded on a first-come, first-serve basis to applicants who meet a minimum required score threshold. Eligible costs include personnel, subcontractors, consultants, supplies, and equipment not exceeding 10,000 dollars per unit, with indirect costs capped at 15 percent of Modified Total Direct Cost. Grantees are required to submit quarterly progress and financial reports, annual reports by January 31, and a final report within 90 days of project completion to receive the final 5 percent of the grant. Additionally, a final Monitoring and Adaptive Management Plan and a maintenance plan must be submitted within 18 months of the work period start date. Failure to comply with reporting requirements may result in the suspension of funding or a requirement to return grant monies.
NJ Department of Environmental Protection

POSTED

about 3 hours ago

DEADLINE

in about 2 months
NAICS: 541620
New
SLED
Certified Arborist Services for Twin Lakes Pump Station Pipeline Project
Solicitation # 2026-RFP-053
The Las Virgenes Municipal Water District is soliciting services from a certified arborist for the Twin Lakes Pump Station Pipeline Project in Chatsworth, California. The project involves the construction of a new 16-inch water transmission pipeline, with portions of the work located within or adjacent to areas containing protected trees, including coast live oaks and California sycamores. The selected consultant will be responsible for updating a 2019 Protected Tree Report to reflect current site conditions and project designs, providing updated protection recommendations for construction documents, and providing on-site monitoring during critical phases such as fencing and trenching. Additionally, the arborist must support the implementation of mitigation planting, specifically the planting of eight 24-inch box Coast Live Oaks, and monitor these trees for a required three-year survivability period. All work must comply with the City of Los Angeles Protected Tree Ordinance No. 177404 and the City's Recreation and Parks Tree Protection Specifications. The contract requires the consultant to maintain accurate cost records, which the Agency may audit for four years following final payment. Payment is issued via monthly itemized statements and processed within 45 days of receipt. The consultant must adhere to California Labor Code requirements, including Workers' Compensation insurance and prevailing wage laws if applicable. Key personnel must be identified in the agreement, and any substitutions require written approval from the Agency. All project data and documents are confidential, and the use of the Agency's name or project photographs in publicity requires prior written consent.
Engineering & Facilities

POSTED

about 15 hours ago

DEADLINE

in 28 days

AI Contract Overview

Show more

This contract involves the identification, labeling, and compliant packaging of hazardous waste materials at facilities managed by the California Department of Water Resources (DWR) prior to their transportation. The scope ensures that all hazardous waste handled at these locations meets regulatory standards for characterization and packaging, thereby maintaining safety and compliance throughout the waste management process. The contract is categorized under NAICS code 541620, which pertains to environmental consulting services, indicating a focus on technical expertise in hazardous waste management. The solicitation was posted on June 9, 2026, and responses are due by July 8, 2026. This opportunity is structured as a subcontract, though details on any set-aside status or specific vendor types are not provided. While the exact sites of performance are unspecified, the contract is tied to the California region under the oversight of the DWR. Interested parties can access additional information and submit responses through the California procurement portal provided in the contract details.

General Info

Identify, label, and package hazardous waste for California DWR, ensuring regulatory compliance and safety.

Documents

This scope was carved out of 10219611.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

IFB 10219611 Hazardous Waste Removal Services

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia Department of Water Resources
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Identification, labeling, and compliant packaging of hazardous waste materials at DWR facilities prior to transport.

More opportunities from California Department of Water Resources

Same awarding agency

NAICS: 237310
New
SLED
IFB 10223523
Solicitation # 10223523
The California Department of Water Resources is soliciting bids for professional traffic control services on an as-needed basis for the Sutter Maintenance Yard, with an anticipated start date in February 2027. The scope of work involves implementing traffic control on publicly accessible roadways for projects ranging from 500 to 1,500 feet in distance and one to 45 days in duration. Key tasks include closing shoulders or lanes, metering traffic, and supporting activities such as road surface repair and drainage work across various Division of Flood Operations sites in Sutter, Yuba, Butte, Tehama, Lake, and Plumas counties. To be eligible, contractors must possess a valid C-31 Contractor's License and be registered with the Department of Industrial Relations. The contract will be awarded to the lowest responsible bidder based on the total bid amount, with specific calculation preferences available for certified Small Businesses and Disabled Veteran Business Enterprises. Bidders must adhere to strict equipment standards, including the use of ANSI 107-99 Class 2 safety clothing and retro-reflective sheeting for barricade rails that conforms to ASTM and MUTCD standards. Administrative requirements include the submission of a GenAI disclosure, recycled content certification, and a certificate of insurance. Bids are due by December 2, 2026, and must be submitted in both hardcopy and electronic formats on a USB drive. The state maintains the right to terminate the contract without cause upon 30 days written notice.
Highway, Street, and Bridge Construction

POSTED

2 days ago

DEADLINE

in 26 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS