This Solicitation opportunity from Department Of Energy was posted on October 29, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HB4 Shutter Insert
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves the design, fabrication, and delivery of a rotary shutter for Oak Ridge National Laboratory's High Flux Isotope Reactor, specifically the HB4 Shutter Insert. The work is guided by a detailed Statement of Work prepared by ORNL, which outlines the technical requirements, project management, and scheduled milestones necessary for the successful completion of the project. The technical specifications are supported by detailed engineering drawings that specify dimensions, materials, and manufacturing standards, ensuring precise fabrication and quality control. The procurement process is initiated through a Request for Proposal (RFP PR422451), issued in late October 2025, with a proposal deadline set for mid-November 2025, and aims to select a qualified contractor through a firm fixed-price subcontract. The project emphasizes adherence to technical standards, schedule commitments, and quality assurance, with the potential for optional installation services, all supporting the broader mission of the U.S. Department of Energy to maintain and enhance the reactor's operational capabilities. The contract is managed from ORNL's location in Oak Ridge, Tennessee, and involves close coordination with designated points of contact to ensure compliance and successful project execution.
General Info
Place of Performance
Set-Aside
Documents
3AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- Procurement of High-Performance Laser Ablation Inductively Coupled Plasma Mass Spectrometer (LA-ICP-MS) System to be delivered to the NETL Pittsburgh site. Period of Performance: 30 days after receip…Open now
- G8 Galieo OH H (218808) Maintenance Plan POP 08/15/2025 - 08/14/2028Open now
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Deadline has passed
Submission Closed
Organization & Contact Information
Full Description
HB4 Shutter Insert
eller shall design, fabricate and deliver a rotary shutter for ORNL's High Flux Isotope Reactor according to the attached Statement of Work and Drawing.
More opportunities from Department Of Energy → Ornl Ut-Battelle Llc-Doe Contractor
Same awarding agency
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
