Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on May 8, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Hd-S3224 Recycling Of Asphalt, Concrete Materials, And Other Related Services At Polb Rubble Site

Closed
HD-S3224 RECYCLING OF ASPHALT, CONCRETE MATERIALS, AND OTHER RELATED SERVICES AT POLB RUBBLE SITEState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This contract involves a comprehensive recycling operation at the Port of Long Beach, requiring the contractor to provide all necessary materials, power, construction equipment with qualified operators, labor, tools, transportation, and supervision for a duration of two years. The primary tasks include crushing and recycling various types of concrete and asphalt debris into Crushed Miscellaneous Base (CMB), as well as crushing and sizing rock and concrete into 2-inch rock. The contractor must also adhere to environmental best practices by maintaining BMP checklists for dust control and stormwater runoff management, and perform routine maintenance on the City-provided scale to ensure accurate measurements and operational efficiency. The project is valued between $500,000 and $2,000,000, with the solicitation posted on May 8, 2025, and a response deadline of June 17, 2025. It is managed under the NAICS code 423810, indicating a focus on construction and mining equipment and supplies. The contract is overseen by the Port of Long Beach, a California-based agency, with primary contact through the specified email and phone number. The scope emphasizes environmental compliance, operational reliability, and the efficient recycling of construction debris to support the Port’s infrastructure needs.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Port of Long Beach
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
The Work required by this Contract includes, but is not limited to, the following: furnishing all materials, power, construction equipment with qualified operators, laborers, tools, transportation and supervision necessary to provide, operate, and maintain a crusher operation for a period of two (2) years and recycle (crush) miscellaneous broken asphalt concrete, Portland cement concrete, and reinforced concrete into Crushed Miscellaneous Base (CMB); crushing and sizing of rock and concrete for 2-inch rock; maintaining Best Management Practices (BMPs) checklist for dust control and storm water run-off; and perform routine maintenance and upkeep to the City’s provided scale.

More opportunities from California → Port of Long Beach

Same awarding agency

NAICS: 238210
SLED
HD-S3203 HARBOR FLEET ZERO EMISSIONS INFRASTRUCTURE
Solicitation # HD-S3203
The Port of Long Beach is soliciting bids for the Harbor Fleet Zero Emissions Infrastructure project (Specification No. HD-S3203), which involves the construction of infrastructure, underground utilities, and the installation of electrical equipment to support zero emissions charging. The scope of work includes the installation of Electric Vehicle Supply Equipment (EVSE), Battery Energy Storage Systems (BESS), and Charge Management Systems (CMS) at the JCCC, Maintenance Yard, and Port Administration Building. The project encompasses demolition, excavation, electrical construction, and site restoration, with a goal of achieving Platinum level Envision verification for sustainability. Bids must be submitted electronically via the PlanetBids system by November 17, 2026, at 2:00 PM PT. The contract will be awarded to the lowest responsive and responsible bidder. Mandatory qualifications include Class A and C-10 California Contractor's Licenses and EVITP certification. Bidders must demonstrate experience within the last five years in the procurement and installation of both Level 2 and Level 3 electric vehicle chargers and associated charging management systems. Additionally, the project is subject to a Port-Wide Project Labor Agreement and requires compliance with the American Disabilities Act and ISO 27001 cybersecurity standards.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

22 days ago

DEADLINE

in 19 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS