HDPE Piping and Seepage Collection Installation

Active
International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract, issued by MPE a division of Englobe, involves the installation of drainage and seepage collection systems for reservoir projects within the Bow River Irrigation District. The scope of work requires the installation of 2000 HDPE DR1 and 750 DR17 HDPE pipe, along with slotted HDPE DR11 header pipes equipped with filter socks and non-woven geotextiles featuring a 300mm overlap. The selected contractor will utilize HDPE fusion welding and specialized trenching equipment to install HDPE Tees and manholes, ultimately delivering a fully tested seepage collection network. The solicitation was posted on October 5, 2026, with a response deadline of October 23, 2026, falling under NAICS code 238110.

General Info

Documents

This scope was carved out of 1510-032-02.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

BRID - Deadhorse Reservoir Contract 2 RFQ

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyMPE a division of Englobe
ContactsNo contacts available
OfficeN/A
Organization / AgencyMPE a division of Englobe
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs drainage and seepage collection systems for prime contractors on Bow River Irrigation District reservoir projects. Installs 2000 HDPE DR1 and 750 DR17 HDPE pipe, slotted HDPE DR11 header pipes with filter socks, and non-woven geotextiles with 300mm overlap. Utilizes HDPE fusion welding and trenching equipment to install HDPE Tees and manholes. Delivers a tested seepage collection network.

Similar Contracts

Same NAICS industry code

More opportunities from MPE a division of Englobe

Same awarding agency

NAICS: 237990
New
International
BRID - Deadhorse Reservoir Contract 2 RFQ
Solicitation # 1510-032-02
The Bow River Irrigation District is seeking qualified contractors for the construction of the North Dam and South Road Dyke as part of the Deadhorse Reservoir project. This infrastructure will serve as a balancing and re-regulating reservoir for the district's Main Canal. The scope of work includes the construction of a 4800m zoned earth-fill dam and a 1740m road dyke with a height of 3.7m, as well as the installation of specialized seepage collection offtakes. Contractors are responsible for providing all labor, materials, and plant, while ensuring that the operation of the Main Canal is maintained throughout the construction process. The procurement follows a Best Value Selection process, requiring a minimum score of 70 rating points for bidders to be invited to bid. Qualification submissions must be received by October 23, 2026, and must include a corporate profile, project comprehension, key personnel resumes, relative experience, and a Declaration of Conflict of Interest. Mandatory requirements include a valid Certificate of Recognition (COR) or COR Equivalency Letter (COREL) issued by the Alberta Construction Safety Association. Selected contractors must provide performance and labor and material payment bonds, each for 50 percent of the tender price. Project milestones include relocation by July 15, 2028, North Dam completion by August 15, 2028, and substantial performance by August 31, 2028, with reservoir filling scheduled for September 2028. The total performance date for the contract is May 31, 2029. Pricing is based on a unit price bid covering various items, including mobilization, topsoil stripping, borrow excavation, and the placement of various fill zones and gravels.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in 17 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS