HDPE Piping and Seepage Collection Installation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This subcontract, issued by MPE a division of Englobe, involves the installation of drainage and seepage collection systems for reservoir projects within the Bow River Irrigation District. The scope of work requires the installation of 2000 HDPE DR1 and 750 DR17 HDPE pipe, along with slotted HDPE DR11 header pipes equipped with filter socks and non-woven geotextiles featuring a 300mm overlap. The selected contractor will utilize HDPE fusion welding and specialized trenching equipment to install HDPE Tees and manholes, ultimately delivering a fully tested seepage collection network. The solicitation was posted on October 5, 2026, with a response deadline of October 23, 2026, falling under NAICS code 238110.
General Info
Place of Performance
CANSet-Aside
Documents
This scope was carved out of 1510-032-02.
The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.
BRID - Deadhorse Reservoir Contract 2 RFQ
AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
More opportunities from MPE a division of Englobe
Same awarding agency
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
