Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Iowa was posted on May 2, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Heartland East 23-24 Batch and Build Edge of Field Project

Closed
EOF-24-01State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
Demolition of Connex Box Structures and Removal of Debris
Solicitation # ACFD 26-03
The Alameda County Fire Department (ACFD) is soliciting sealed bids for solicitation number ACFD 26-03, focused on the demolition of Connex Box Structures and the removal of debris at 890 Lola Street in San Leandro, California. This is a stipulated sum, single-prime contract with a total project duration of 120 calendar days. Bids must be submitted by 2:00 pm on December 10, 2026, at 6363 Clark Ave., Dublin, California. The contract will be awarded to the lowest responsive and responsible bidder based on the base bid amount. Required submission documents include a bid bond or security of 10 percent of the total bid price, a non-collusion declaration, a debarment form, and a designated subcontractors list. The successful contractor must provide 100 percent performance and payment bonds and adhere to California Public Works Contract requirements, including the payment of prevailing wages. Key operational requirements include the submission of a site security and logistics plan addressing tool control and working around inmates, as well as strict adherence to soil dust mitigation and hazardous materials procedures. Project milestones range from the initial kick-off meeting and equipment delivery to final site clearance. The contractor is also required to comply with the Americans with Disability Act and Title VII of the Civil Rights Act of 1964. All work is subject to inspection and potential rejection by the ACFD and the Construction Manager to ensure conformity with technical specifications and industry standards.
AC Fire Department

POSTED

about 6 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

This contract involves a project in Iowa that encompasses the installation of 14 bioreactors and 25 saturated buffer structures across Cedar, Scott, Johnson, and Muscatine Counties. The project's estimated cost ranges from $550,000 to $565,000 and includes the procurement and installation of various materials such as 55 water control structures, over 4,100 cubic yards of woodchips, nearly 3,000 square yards of geotextile fabric, along with perforated and non-perforated piping, outlet structures, and other necessary components. The scope of work primarily involves excavation, earthwork, grading, mobilization, and seeding activities to complete the project. The solicitation, titled "Heartland East 23-24 Batch and Build Edge of Field Project," was posted on May 2, 2024, with a response deadline of May 29, 2024. It is managed by the Iowa Department of Agriculture and Land Stewardship under NAICS code 238910. The primary point of contact for inquiries is Tracy Bruun, reachable via email or phone. The project aims to enhance agricultural water management infrastructure and environmental conservation efforts within the specified counties in Iowa. More details and the opportunity to respond can be accessed through the provided online link.

General Info

Agency

Iowa Agriculture and Land Stewardship

Place of Performance

IA, USA

Set-Aside

NONE

Documents

7

2024 Batch and Build Projects - Standards and Specifications

PDF, High priority: read this firstspecifications
High

Denitrifying Bioreactor Construction Plans

PDF, High priority: read this firstspecifications
High

Heartland East 23-24 Batch and Build Edge-of-Field Project - Addendum No. 1

PDF, High priority: read this firstamendment
High

Heartland East 23-24 Batch and Build Edge-of-Field Project (EOF-24-01)

PDF, High priority: read this firstifb
High

Heartland East 23-24 Batch and Build Edge-of-Field Project (EOF-24-01)

PDF, High priority: read this firstifb
High

Heartland East 23-24 Batch and Build Edge-of-Field Project Notice-to-Bidders

PDF, High priority: read this firstifb
High

Saturated Buffer Construction Plans - Scott Co, Iowa

PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyIowa Agriculture and Land Stewardship
Contacts1 person available
OfficeN/A
Organization / Agency
Iowa Agriculture and Land Stewardship
Office AddressN/A

Full Description

Show more
This project includes 14 bioreactors and 25 saturated buffer structures located in Cedar, Scott, Johnson, and Muscatine Counties. The estimated cost range for this project is $550,000 and $565,000. Some of the materials required for this project include: 55 water control structures (WCS), 4136 cubic yards of woodchips, 2945 square yards of geotextile fabric, perforated and non-perforated piping, outlet structures, amidst other items. In general, the work involves, and is not limited to, excavation, earthwork, grading, mobilization, and seeding.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS