Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on October 1, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Heavy Civil GC/CM Services for MDCSO Wet Weather Treatment Station

Closed
001480,3State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
Demolition of Connex Box Structures and Removal of Debris
Solicitation # ACFD 26-03
The Alameda County Fire Department (ACFD) is soliciting sealed bids for solicitation number ACFD 26-03, focused on the demolition of Connex Box Structures and the removal of debris at 890 Lola Street in San Leandro, California. This is a stipulated sum, single-prime contract with a total project duration of 120 calendar days. Bids must be submitted by 2:00 pm on December 10, 2026, at 6363 Clark Ave., Dublin, California. The contract will be awarded to the lowest responsive and responsible bidder based on the base bid amount. Required submission documents include a bid bond or security of 10 percent of the total bid price, a non-collusion declaration, a debarment form, and a designated subcontractors list. The successful contractor must provide 100 percent performance and payment bonds and adhere to California Public Works Contract requirements, including the payment of prevailing wages. Key operational requirements include the submission of a site security and logistics plan addressing tool control and working around inmates, as well as strict adherence to soil dust mitigation and hazardous materials procedures. Project milestones range from the initial kick-off meeting and equipment delivery to final site clearance. The contractor is also required to comply with the Americans with Disability Act and Title VII of the Civil Rights Act of 1964. All work is subject to inspection and potential rejection by the ACFD and the Construction Manager to ensure conformity with technical specifications and industry standards.
AC Fire Department

POSTED

about 8 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract pertains to the construction and preconstruction services for the Wet Weather Treatment Station (WWTS) at the mouth of the Duwamish River, designed to treat combined sewer overflows before discharge into the east waterway. The project involves the development of a comprehensive treatment facility that includes an underground 4 million-gallon equalization basin, screening systems, pumping infrastructure, ballasted sedimentation technology with ultraviolet (UV) disinfection, solids handling, odor control, and site surface improvements. The scope also encompasses demolition of existing structures, shoring, excavation, soil management—including contaminated soils—and the installation of influent piping, instrumentation, and controls. The facility aims to enhance water quality and environmental compliance, with an expected project completion date of December 31, 2034. The procurement process includes multiple addenda that update insurance requirements, scope of work, and project principles such as lean construction and Building Information Modeling (BIM) integration. The solicitation, issued by King County, seeks a heavy civil general contractor/construction manager (GC/CM) with a project size estimated between $50 million and $150 million, with the total project cost likely exceeding $1 billion. The contract documents feature draft agreements for both preconstruction and construction phases, outlining scope, schedule, cost, subcontracting, insurance, and compliance requirements. The process emphasizes collaboration, adherence to state regulations, and integrated project delivery methods, with a focus on timely completion and environmental stewardship. The project represents a significant infrastructure investment aimed at improving wastewater management and waterway health in the region.

General Info

Place of Performance

WA, USA

Set-Aside

NONE

Documents

7

Addendum 1 KC001480 Heavy Civil GC/CM Services for Mouth of the Duwamish CSO Wet Weather Treatment Station

PDF, High priority: read this first50 pages · amendment
High

KC001480 RFP Addendum 2 - Heavy Civil GC/CM Services Insurance Requirements

PDF, High priority: read this first3 pages · amendment
High

KC001480 RFP Addendum 3 for Heavy Civil GC/CM Services

PDF, High priority: read this first21 pages · amendment
High

RFP KC001480 Heavy Civil GC/CM Services for Mouth of the Duwamish CSO WWTS

PDF, High priority: read this first44 pages · rfp
High

RFP KC001480 Proposal Cover Sheet for Heavy Civil GC/CM Services

DOCX, High priority: read this first1 page · rfp
High

KC001480 Heavy Civil GC/CM Construction Services Contract Draft

PDF, Low priority396 pages · contract-document
Low

KC001480 Heavy Civil GC/CM Preconstruction Services Agreement

PDF, Low priority125 pages · contract-document
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → King County
Contacts1 person available
OfficeN/A
Organization / AgencyWashington → King County
Office AddressN/A
Contacts
Melissa Jordan

Full Description

Show more
The WWTS is a new treatment facility to treat combined sewer overflows (CSOs) prior to discharge through a new outfall into the east waterway at the mouth of the Duwamish River. The project will construct an equalization basin(s), screening, pumps, ballasted sedimentation technology for solids removal, chlorine disinfection system utilizing ultraviolet light (UV) disinfection, solids storage, and instrumentation and controls. The scope includes the demolition of existing structures and foundations, construction of a below-grade 4 million-gallon (MG) equalization basin, shoring and excavation work, and soil management (including disposal of contaminated soils, ground improvements, and tremie slabs). The scope also includes influent piping, screening and pumping, construction of a vendor supplied ballasted sedimentation UV disinfection treatment system, solids handling, odor control systems, and site surface improvements.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS