This Government Contract opportunity from Department Of Agriculture was posted on June 16, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The Helena National Forest contract, managed by the Custer Gallatin National Forest, involves trail work across two distinct locations. The Arrastra Creek project on the Lincoln Ranger District consists of approximately 4.5 miles of trail restoration to hiker, pack, and saddle standards with a 24-inch tread width. This scope includes clearing, grubbing, excavation, turnpikes, ditching, and foot bridge construction, noting that significant rock presence may impact the pace of work.
The Beartrap project on the Helena Ranger District involves approximately 3 miles of new trail construction and restoration, also built to hiker, pack, and saddle standards but with a wider 30-inch tread. This portion requires machine construction and includes the installation of switchbacks, climbing turns, grade reversals, and grade dips. The government estimate for these combined projects is between 25,000 and 100,000 dollars.
HighAI Summary for 912-4 Grade Dip Detail: Technical drawing/specification document dated 4/96 (912-4) detailing a grade dip for a spillway, including plan and profile views with minimum dimensions of 6 inches and 10 feet.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 912-9 Inslope Climbing Turn Specifications: Technical specification document dated 4/6/96 detailing the design and construction of insloped climbing turns. It includes requirements for constant grade maintenance, transition sections (15 L.F. minimum), slope percentages (3%), and field marking instructions via flagging or staking.
DOC
DOC, High priority: read this firstamendment
HighAI Summary for Amendment 1 to RFQ AG-03H6-S-09-0023 - Arrastra/Beartrap Trail Projects: Amendment 1 dated 5/13/2009 for Construction RFQ AG-03H6-S-09-0023 regarding the Arrastra Creek/Beartrap Trail Projects for the Helena National Forest. This amendment replaces Page 3 (Schedule B - ITEM 2) to include estimated quantities for Clearing & Grubbing, Excavation, Switchbacks, and Mobilization.
DOC
DOC, High priority: read this firstrfq
HighAI Summary for Arrastra Creek/Beartrap Trail Projects - RFQ Cover Sheet: Request for Quotation (RFQ) cover sheet for the Arrastra Creek/Beartrap Trail Projects within the Helena National Forest (Lincoln and Helena Ranger Districts). Contract number AG-03H6-S-09-0023. Closing date is May 22, 2009. Instructions require completion of Section B (Schedule of Items) and adherence to Section M requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Arrastra Creek Trail #482 Reconstruction Project Map: A project map for the reconstruction of Arrastra Creek Trail #482 within the Lincoln Ranger District of the Helena National Forest. The document identifies the start and end of the project, the Scapegoat Wilderness Boundary, and a bridge location.
DOC
DOC, High priority: read this firstrfq
HighAI Summary for Construction RFQ AG-03H6-S-09-0023 - Arrastra Creek/Beartrap Trail Projects: Request for Quotation (RFQ) issued on May 8, 2009, by the Helena National Forest for trail restoration and construction projects at Arrastra Creek and Beartrap Gulch. The document includes a detailed bid schedule with specific line items (clearing, grubbing, culverts, etc.), a statement of work describing trail standards and locations, and an estimated price range between $25,000 and $100,000.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Existing Trail Restoration Detail 915-1: Technical drawing/specification detail for existing trail restoration, illustrating before and after restoration states, including slope requirements (3%), crown specifications (2 inch), and the use of compacted suitable material.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Rock Retaining Wall Specifications (935-1): Technical specifications and construction details for a rock retaining wall, dated 9/30/2023. Includes requirements for wall embedding, footing preparation, outslope percentages, and dimensions for header and edge rocks.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Rock Waterbar Technical Specification (922-1): Technical drawing and installation specifications for a Rock Waterbar, dated 4/96. The document provides specific requirements for rock weight (80 lb minimum), embedment depth (12 inches into bank, 2/3 into tread), overlap (1/3 length), and skew angle (45 to 60 degrees).
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Rolling Dip Technical Specification (912-5): Technical drawing and specification document for the construction of a rolling dip, including plan and profile views, grade requirements (3%-5% outslope), and drainage instructions. Dated 3/02.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Shallow Stream Ford and Gully Crossing Rock Structure Specifications: Technical specifications and construction details for a shallow stream ford and gully crossing rock structure, dated 9/6/16. Includes requirements for rock dam embedding, stepping rock placement, and material sizes for the tread.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Single Lobe Stringer Trail Bridge - Drawing R924: Technical drawing and specification document (Drawing No: R924) dated 10/20/2003 for a single lobe stringer trail bridge located at Stonehouse Drive, PA. Includes section 1-1 and notes regarding dimensions and materials.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Single Log SL-3 Layout 1: Technical layout document containing loading specifications for storage rectangular pieces, including dimensions (length, width, height) and deadweight calculations. The document includes tables for pipe sizes and weight formulas, referencing further specifications for detailed information.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Single Log Stringer Trail Bridge - Sheet 2 of 4: Technical drawing specifications and layout for a Single Log Stringer Trail Bridge, dated 06/06/99 for the Northwest Region, ROG. The document includes requirements for SI units, part tables, and specific dimensions for rail spice diagrams, interior roof faces, and deck sections with pile handbrake load capacity.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Switchback - Type I Detail (914-1): Technical drawing and specifications for a Type I Switchback construction, detailing slope percentages (3% inslope/outslope), grade maximums (5% approach, 10% turn), and structural elements such as log barriers and drain ditches. Dated 4/96.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Trailbed and Slope Finish Specifications: Technical specifications detailing the required finish for trailbeds and slopes, including requirements for root and rock removal, minimum clearance of 24 inches tread width, and specific slope ratios for rock and common materials.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Tree Removal and Stump Height Specifications: Technical specifications detailing tree removal constraints based on diameter and distance from the centerline, as well as specific stump height requirements based on slope and position relative to clearing limits.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Turnpike Type II Cross Section: Technical drawing and specifications for a Turnpike Type II installation, dated 3/1/97. The document provides detailed cross-section requirements including material specifications for rock retainers, geotextiles, and stakes, as well as dimensions for leadoff and side ditches.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Typical Trail Cross Sections: Technical drawing specifications for trail cross sections, detailing benching requirements based on sideslope percentages and a standard trailbed width of 24 inches.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for USDA Forest Service - Single Log Stringer Trail Bridge Standard Plans: Standard design plans and project design criteria for a Single Log Stringer Trail Bridge, issued by the U.S. Department of Agriculture Forest Service. The document includes structural and site criteria such as soil, foundation, and grade profiles.
DOC
DOC, High priority: read this firstwage-determination
HighAI Summary for Wage Determination - Arrastra Creek/Beartrap Trail Projects: General Decision Number MT080001 (dated 03/27/2009) for heavy construction projects in Montana. The document specifies hourly base rates and fringes for various labor classifications, including carpenters, electricians, power equipment operators, ironworkers, and laborers, including zone-based pay adjustments and specific county designations.
PDF
PDF, Low priorityother
LowAI Summary for 922_2_R1+Model (1): The document contains a brief statement asserting the accuracy of a table and noting potential minor discrepancies between a drawing and said table.
PDF
PDF, Low priorityother
LowAI Summary for BearTrapGulchTrail.pdf: The document contains a single certification statement asserting that the information provided is true to the best of the author's knowledge and experience. It lacks sufficient context to determine a specific procurement purpose.
PDF
PDF, Low priorityspecifications
LowAI Summary for BearTrapGulch Vicinity Map: A vicinity map for the Beartrap Gulch project identifying existing and proposed trails, geographic landmarks, and nearby highways including I-15, Highway 280, and Highway 284.
PDF
PDF
AI Contract Breakdown
Uniform Contract Format
Contract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Timeline
2 updates
PhaseAwarded
Posted
Presolicitation
Notice updated
Response deadline changed from Jun 2, 2009 to May 22, 2009. The notice description changed.
Notice updated
The notice description changed.
Type Changed
Presolicitation → Solicitation
Awarded
Contract was awarded
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
Organization & Contact Information
Show more
AgencyDepartment Of Agriculture → Custer Gallatin National Forest
This contract consists of the following: Arrastra Creek #482 will be approximately 4.5 miles of trail restoration. Arrastra Creek is located on the Lincoln Ranger District. The trail will be constructed to hiker, pack and saddle standards. Tread width will be 24 inches. All aspects of trial restoration will be included in this project. Clearing and grubbing, excavation, turnpikes, foot bridge construction and ditching are all included in this project. Terrain is not exceptionally rough but there will be a considerable amount of rock that will slow construction. Beartrap #4137 will be approximately 3 miles of new trail construction mixed with some trail restoration. Beartrap is located on the Helena Ranger District.The trail will be constructed to hiker, pack and saddle standards. Tread width will be 30 inches. All aspects of new trial construction will be included in this project. Clearing and grubbing, excavation, switchbacks, climbing turns, grade reversals are all included in this project. Grade dips and grade reversals will be incidental to new tread excavation. Machine construction will be a requirement on this project. Government Estimate - between $25,000 and $100,000. Solicitation issuance date on or about May 11, 2009, Solicitation will be posted electronically.
More opportunities from Department Of Agriculture → Custer Gallatin National Forest