This Solicitation opportunity from Texas was posted on September 29, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Hendrick Middle School Systems & Compliance Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Plano Independent School District is seeking competitive sealed proposals for the Hendrick Middle School Systems & Compliance Project, with an estimated budget of approximately $1.39 million, including a $70,000 contingency fund. The project involves extensive MEP work, including replacing multiple rooftop air conditioning units, structural steel rework, roofing repairs, gas piping modifications, and refrigerant and condensate piping system rework. An alternate bid option includes replacing an air handling unit and overhauling the school's temperature controls and energy management system, complemented by the addition of utility and water flow meters for enhanced controls. The scope also encompasses replacing the existing Public Address System, along with architectural improvements such as sign replacement, pavement repairs, minor fencing, erosion control, painting, ceiling work, and installing security film on first-floor exterior windows. The project is located at 7400 Red River Drive, Plano, Texas, with a project timeline that includes virtual and onsite pre-bid meetings scheduled for early October, and a response deadline of October 22, 2024. The procurement process is managed through a structured bidding process, with detailed instructions for virtual and onsite pre-bid meetings, and the opportunity for vendors to submit proposals via specified online platforms. The contract falls under the NAICS code 541310 and is categorized as a large-scale project with a size range between $1 million and $5 million. The primary point of contact is Veronica Couzynse, reachable via email and phone, with additional details available through the provided online link. The solicitation emphasizes transparency and thorough communication, incorporating updates and clarifications through addenda, and aligns with the district’s standards for project execution, including commissioning, testing, and compliance with relevant regulations.
General Info
Place of Performance
TX, USASet-Aside
Documents
1AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- City of Santa Cruz Lifeguard Headquarters RepairsOpen now, due in 17 days
- Architectural Design ServicesOpen now, due in 59 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Hendrick Middle School Systems & Compliance Project SCOPE OF WORK:
Several MEP items of work to include replacement of several existing Roof Top A/C units, related structural steel rework, related roofing patching/repair, gas piping rework, replacement of several split direct expansion A/C units (an done DX coil in an AHU), replacement/rework of refrigerant piping systems, rework of condensate piping systems, an alternate bid item to replace an air handling unit and the complete replacement of the temperature controls and energy management system. Several utility and chilled/heating water system flow meters are being added as a part of the controls system rework. The existing Public Address System is to be replaced. Pertinent TAB and Commissioning included but paid for and directed by the PISD. Architectural work includes replacement of the Marquis Sign, replacement/repair of several concrete pavement sections to include sidewalks, stair and drive areas, some limited erosion control work, minor fencing work, patching/painting and ceiling removal/reinstallation related to the MEP scope of work, and addition of security film to all exterior windows on the first floor level only
The estimated budget and Location:
Estimated Budget - $1,320,000and $70,000 owner's contingency Project Location - Hendrick Middle School – 7400 Red River Dr, Plano, TX 75025 VIRTUAL Pre-Bid Meeting October 8 at 2:00 PM
ONSITE PRE-BID MEETING OCTOBER 14, AT 9:30 AM
Please pre-register at: https://forms.office.com/r/Pq8x8yh8Zs ZOOM CREDENTIALS FOR VIRTUAL PRE-BID MEETING: Veronica Couzynse is inviting you to a scheduled Zoom meeting.
Topic: Veronica Couzynse's Zoom Meeting - VIRTUAL PRE-BID MEETING SYSTEM & COMPLIANCE PROJECTS Time: Oct 8, 2024 02:00 PM Central Time (US and Canada)
Join Zoom Meeting https://planoisd.zoom.us/j/3804467644?pwd=S09iMHgvR1NyNkx2S2ZqTnYzek5wQT09&omn=94806413559
Meeting ID: Sign up to see this detail Passcode: 9S5Att
******************************************************************************************* VIRTUAL OPENING ZOOM CREDENTIALS:
Veronica Couzynse is inviting you to a scheduled Zoom meeting.
Topic: Veronica Couzynse's Zoom Meeting- VIRTUAL OPENING System & Compliance - Mitchell, Bethany, Hedgcoxe, Hendrick Time: Oct 22, 2024 03:00 PM Central Time (US and Canada)
Join Zoom Meeting https://planoisd.zoom.us/j/3804467644?pwd=S09iMHgvR1NyNkx2S2ZqTnYzek5wQT09&omn=99712769981
Meeting ID: Sign up to see this detail Passcode: 9S5Att
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
