Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on August 28, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Henry C. Gonzalez Municipal Auditorium Roof Improvements, City Project No. 695- Prk

Closed
PW-NIB-695-PRKState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333413
New
DIBBS
41--FAN,VANEAXIAL
Solicitation # SPE8E9-27-T-0554
This contract is a Request for Quotations (RFQ) issued by DLA Troop Support, Construction & Equipment MRO SVC I for the procurement of nine vane axial fans, identified by NSN 4140-00-289-8885 and part number M18953-AA02WA4W6NANANA. The hardware must meet specific technical requirements, including a 440V AC three-phase power supply, a nominal air flow rate of 2000 cubic feet per minute, and clockwise rotation with outward flow. The item is designated as a critical application item and must comply with basic specification MIL-PRF-18953C(1) and quality assurance provision QAP 13873 QAP-EQ003. Additionally, the manufacturer must be Qualified Products List (QPL) approved at the time of award. Delivery is required within 318 days after order, with an original required delivery date of November 16, 2026, shipped FOB Destination to the DLA Distribution DDSP New Cumberland facility in Pennsylvania. The contract mandates strict adherence to MIL-STD-2073-1E for packaging and MIL-STD-129 for marking. Quality inspection will occur at the destination using sampling methods per MIL-STD-1916 or ASQ H1331, with a zero-non-conformance requirement for acceptance. Environmental restrictions prohibit the intentional use of mercury or Class I ozone-depleting chemicals. Administrative requirements include the use of the Wide Area WorkFlow (WAWF) system for invoicing and compliance with various FAR and DFARS clauses regarding cybersecurity, sustainable products, and small business representations.
CONSTRUCTION & EQUIPMENT MRO SVC I

POSTED

1 day ago

DEADLINE

in 10 days

AI Contract Overview

Show more

The contract involves comprehensive roofing and equipment replacement work at the Henry C. Gonzalez Municipal Auditorium under City Project No. 695-PRK. The scope includes removing the existing built-up roofing system, rooftop HVAC units, exhaust fans, heating ventilation units, and associated connections, then reinstalling the equipment at the same locations with new platforms. The project requires installing a new white PVC roofing system with walking pads and a minimum 2% slope over R-30 rigid insulation on the existing roof deck. Additionally, new sheet metal flashings, cap flashings, roof drains, scuppers, and conduits for water, electrical, and gas pipes will be provided to ensure proper drainage and utility connections. An alternate bid option offers a cost reduction by replacing the PVC roofing with a 3-ply built-up roofing system that includes modified asphalt rolls, walking pads, and dense glass reinforcement. The contract is valued between $500,000 and $1,500,000, with a response deadline of September 30, 2025. The project is managed by the City of South Gate, California, and is overseen by Gladis Deras, who can be contacted via email or phone for further details. The work aims to enhance the roof’s durability and functionality while ensuring proper installation of all roofing components and equipment.

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • FILTER, ELEMENT, AIR,Open now, due in 7 days
  • POWER, BREEZEROpen now, due in 6 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of South Gate
Contacts1 person available
OfficeN/A

Full Description

Show more
The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Specifications and Contract Documents. The general items of work include Remove existing built-up roofing material and roof accessories as detailed on the drawings, remove existing rooftop package HVAC equipment, exhaust fans, heating ventilation units, equipment curbs, and associated connections for new roof. Work and re-install all equipment to same location per plan with new equipment platforms. Provide and install new white PVC roofing system, with walking pads with 2% minimum slope over new R-30 rigid insulation on existing roof deck. Provide new sheet metal flashing and cap flashing at selected areas, and pipes. Provide new roof drain scuppers at each roof level. Provide all conduits for water, electrical, and gas pipes on new rubber blocks. Alternate Bid No. 1 for cost reduction: Alternate bid for cost reduction: in lieu of PVC roofing install 3-ply built-up roofing system w/ walking pads & dense glass. Built-up roof to provide rolls of modified asphalt (Omniseal Base 410, Omniseal Ply 420, & Paragon Mod Cap 601)

More opportunities from California → City of South Gate

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS