Hexavalent Chromium-6 Mitigation Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Coachella and the Coachella Water Authority are implementing the Hexavalent Chromium-6 Mitigation Project to comply with California state requirements to reduce Chromium-6 levels in drinking water to 10 micrograms per liter by October 2027. The project involves retrofitting seven domestic water wells using reduction, coagulation, and filtration technology, which utilizes ferrous iron chemical injection to convert hexavalent chromium into a less soluble trivalent form. Infrastructure improvements include the installation of filter and reduction vessels, chemical injection and electrical systems, on-site backwash tanks, wastewater discharge lines, and three sewer line upgrades. Project sites are distributed across the city, including locations within residential subdivisions, open lands, and areas adjacent to city parks. The environmental review process, managed by Terra Nova Planning and Research, Inc., includes a Mitigated Negative Declaration to address potential impacts on local wildlife, such as nesting birds and the Burrowing Owl. The project is currently in the presolicitation phase, with a public review period established from September 23, 2026, through October 23, 2026, under the direction of the City of Coachella Utilities Director.

General Info

Coachella water project retrofitting seven wells to reduce Chromium-6 levels by October 2027.

Agency

California → City of Coachella

Place of Performance

Seven CWA Well Locations and Three Sewer Line Segments within the corp. limits of Coachella, Coachella, CA, 92236

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Coachella
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Coachella
Office AddressN/A
Contacts
Castulo EstradaUtilities Director
John D CristePrincipal Planner

Interested Companies (1)

Terra Nova Planning & ResearchPalm Desert, CA

Full Description

Show more
The Coachella Water Authority (CWA) is required to comply with state requirements to lower Cr-6 levels in drinking water by October 2027. The CWA proposed to implement a remediation program to reduce the levels of Chromium-6 (Hexavalent Chromium) in the City’s drinking water to 10 micrograms per liter (ug/l) as required by the State of California. The project will include retrofitting seven domestic water wells and the installation of wastewater discharge lines and three sewer line upgrades. The Project sites are located throughout the city with two sites located adjacent to city parks, while other sites are located within existing residential subdivisions and open lands. Well improvements will include filter and reduction vessels, additional chemical injection systems and electrical systems, on-site backwash tanks and discharge lines. preliminary design of each of the well sites’ treatment measures using reduction/coagulation/filtration (RCF) treatment technology. The RCF treatment process includes ferrous iron chemical injection to reduce Cr-6 to less soluble trivalent chromium (Cr(III) or Cr-3) through reduction contact vessels.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
IEUA RMPU Basin Improvements Project Montclair Basin Improvements
Solicitation # ieua-rmpu-basin-improvements-project-montclair-basin-improvements
The IEUA RMPU Basin Improvements Project involves construction improvements at Montclair Basin 2 and 3 in Chino, California. The primary objective is to divert available storm flows from the San Antonio Creek Channel into existing basins to facilitate groundwater recharge. The scope of work is comprehensive, requiring all materials, labor, tools, equipment, and incidentals necessary to furnish, install, commission, and deliver a fully functional project. Key activities include civil and site work such as grading, demolition, saw cutting, cold planing, and trucking, as well as the installation of concrete pipes and structures. Specialized services required for the project include electrical work, welding, construction surveys, preconstruction video, and traffic control. Norstar Plumbing and Engineering, Inc. is managing the solicitation and is specifically seeking certified and qualified DBE, MBE, SBE, and WBE subcontractors and suppliers to support these efforts. The project falls under NAICS code 237110. Interested parties must submit their bids by October 29, 2026, at 2:00 PM. Detailed plans and specifications are available through the Inland Empire Utilities Agency bidding website, and coordination is handled by primary points of contact Nathan and Destiny Plummer.
Norstar Plumbing and Engineering, Inc

POSTED

about 1 hour ago

DEADLINE

in 1 day
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also encompasses the installation of new gravity sewers, manholes, site grading, and the provision of a fully operating pumping station equipped with mechanical and electrical systems, a generator, and odor control equipment. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with responsiveness contingent upon the submission of a completed EJCDC C-410 Bid Form, a bid bond, and required MWBE documentation, including a Good Faith Efforts Form and Table A. The contractor must provide performance and payment bonds equal to the contract price and maintain insurance with an A.M. Best rating of A-VII or better. Performance is governed by a Notice to Proceed, with liquidated damages set at 1,000 dollars per day for failure to achieve substantial completion. Payments are processed monthly via applications for payment submitted to the Engineer, with payment due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in 13 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work includes the rehabilitation of covered and open concrete structures, the relining, modification, or replacement of steel and ductile iron pipes and supports, and the installation or replacement of valves and piping appurtenances. Additionally, the project requires the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to instrumentation and electrical systems, replacement of motor control center components, modifications to sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid. Quotes are due by November 17, 2026, at 2:00 PM PT, with the final bid date set for November 18, 2026. Bids will be based on Garney Standard Purchase Order and Subcontract forms, and any exceptions must be submitted as redlines or comments along with the quote.
Garney Pacific, Inc.

POSTED

about 1 hour ago

DEADLINE

in 21 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS