Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Hidden Canyon Residences and Preserve Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Hidden Canyon Residences and Preserve Project involves the development of 28 new detached single-family residential units and associated roadways on approximately 23.89 acres of a 130.98-acre site in the City of Pleasanton, California. The project includes the demolition and reconstruction of two existing homes in the northeastern portion of the site, the dedication of open space, and the annexation of a portion of the land—including the existing Oak Hills Congregation Church Site—into the City of Pleasanton to realign municipal boundaries. All development activities are subject to comprehensive environmental compliance under CEQA and other applicable state and federal regulations, requiring adherence to Title 24 energy standards, CALGreen building codes, NEHRP seismic design criteria, and strict noise limits of 86 dBA at property lines during construction. The project must also implement erosion control, wildfire mitigation measures for high fire hazard zones, and waste diversion protocols, while ensuring coordination with regional agencies for water quality, geotechnical stability, and biological resource protection. The City of Pleasanton serves as the lead agency for permitting, environmental review, and final acceptance of all deliverables, with oversight from the U.S. Army Corps of Engineers, Alameda County Department of Environmental Health, and the Alameda County Flood Control District. Inspections occur on-site and are governed by the California Building Code, California Fire Code, Cal/OSHA standards, ASTM testing methods, and project-specific technical benchmarks such as GEO-1, GEO-3, GEO-4, and AES-4. While no formal FAR clauses, contract value estimates, pricing details, or procurement evaluation factors are present, the project follows municipal submission protocols with public comment periods and electronic filing through the City’s Community Development Department. Proposals and environmental documentation must be submitted to Natalie Amos at the City of Pleasanton via mail or email, with preferred formats including Microsoft Word and Adobe PDF. No contract type, delivery terms, invoicing methods, or contractor certifications such as UEI, CAGE, or socioeconomic status are defined in the provided materials, indicating this is a local municipal development initiative rather than a federal procurement action.

General Info

28 new homes on 23.89 acres in Pleasanton, CA, with open space dedication, environmental compliance, and municipal annexation.

Agency

California → City of Pleasanton

NAICS

541620 - Environmental Consulting ServicesView NAICS

Place of Performance

Dublin Canyon Road, Canyon Meadows Drive, Pleasanton, CA, 94566

Set-Aside

NONE

Documents

(18)

Appendix B - Air Quality, GHG Emissions, and Energy Supporting Information

PDFsupporting-document

DTSC Comments on Hidden Canyon Residences DEIR 2019080461

PDFcomment

Appendix C - Biological Resources Supporting Information for Lester and Shriner's Property Project

PDFsupporting-document

Appendix I - Utilities and Service Systems Supporting Information - Hydraulic Analysis for Tract 8569

PDFtechnical-memorandum

SCH 2019080461 Hidden Canyon Residences and Preserve Summary Form

PDFenvironmental-summary

Appendix H - Transportation Supporting Information for Hidden Canyon Residences

PDFsupporting-document

_SCH 2019080461 Hidden Canyon Draft EIR Corrections Memo

ZIP

Pleasanton Hidden Canyon Residences and Preserve Draft Environmental Impact Report

PDFenvironmental-impact-report

Appendix A - EIR Noticing and Public Involvement for Hidden Canyon Residences Project

PDFpresolicitation

Caltrans Comments on Hidden Canyon Residences DEIR 2019080461

PDFcomment

SCH #2019080461 Hidden Canyon Residences Review Extension Memo

PDFother

SCH 2019080461 Hidden Canyon Draft EIR Corrections Memo

PDFmemorandum

Appendix F - Hydrology and Water Quality Supporting Information

PDFsupporting-document

SCH 2019080461 Notice of Completion for Hidden Canyon Residences and Preserve

PDFnotice-of-completion

__Request to extend review

ZIP

Appendix E - Geology and Soils Geotechnical Supporting Information

PDFsow

Appendix D - Cultural and Tribal Cultural Resources Supporting Information

PDFsupporting-document

Appendix G - Noise Supporting Information for Hidden Canyon Residences

PDFsupporting-document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Pleasanton
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Pleasanton
Office AddressN/A
Contacts
Natalie AmosAssociate Planner
Prathna MaharajSenior Environmental Project Manager

Interested Companies (1)

Show more
First Carbon Solutions
Walnut Creek, CA

Full Description

Show more
The proposed project would build 28 new detached single-family residential units and roadways on approximately 23.89 acres of an approximately 130.98-acre project site within the City of Pleasanton. Project implementation would also include the demolition and reconstruction of two existing single-family homes located in the northeastern portion of the development site, dedication of open space, and annexation of a portion of the project site, including the existing Oak Hills Congregation Church Site, into the City of Pleasanton to ensure a logical reorganization of City of Pleasanton boundaries.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
Environmental & Archaeological AssessmentThe contract encompasses a comprehensive environmental and archaeological assessment to support permitting under the National Environmental Policy Act and Section 106 of the National Historic Preservation Act. It requires the performance of a Phase I Environmental Site Assessment to identify potential contamination, a wetland delineation to determine the extent and boundaries of wetland areas, and archaeological surveys to evaluate the presence of culturally significant resources. These activities are essential for documenting environmental and historical conditions prior to any proposed development or infrastructure projects in Dawson County, Georgia. The work must be conducted in accordance with federal regulatory standards to ensure compliance and facilitate the permitting process. This is a subcontract opportunity posted by the Development Authority of Dawson County, with a response deadline of September 7, 2026. The North American Industry Classification System code 541620 indicates the work falls under environmental consulting services. The performance location is within Georgia, though specific site details are not provided. Interested parties must submit proposals by the stated deadline to be considered, and all activities are intended to support regulatory compliance and due diligence for future development initiatives in the region.
Development Authority of Dawson County

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541620
New
SLED
Environmental Compliance and MonitoringThe contract involves comprehensive environmental compliance and monitoring services focused on stormwater management, erosion control oversight, and regulatory reporting throughout the construction phase. The work is tied to a project under the Haralson County School District in Georgia and requires adherence to established environmental regulations, ensuring that construction activities do not negatively impact surrounding ecosystems or water resources. The contractor will be responsible for implementing and maintaining effective erosion and sediment control measures, conducting regular site inspections, documenting compliance efforts, and submitting required reports to regulatory authorities as needed. This subcontract is categorized under NAICS code 541620, which corresponds to environmental consulting services, indicating a professional scope centered on technical environmental management rather than physical construction. The solicitation was posted on August 7, 2026, with a response deadline set for September 9, 2026, providing interested parties a limited window to submit proposals. Performance is expected to occur in Georgia under the jurisdiction of the Haralson County School District, though specific site locations are not detailed in the provided data. The contract emphasizes continuous regulatory alignment and accurate documentation, making it critical that the selected vendor has demonstrated expertise in environmental monitoring and compliance reporting within construction environments.
Haralson County School District

POSTED

about 18 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541620
New
PACP and MACP Pipeline Condition AssessmentThis contract requires the standardized coding and reporting of pipeline and manhole defects in accordance with NASSCO’s Pipeline Assessment Certification Program (PACP) and Manhole Assessment Certification Program (MACP) protocols. All condition assessments must follow these industry-recognized guidelines to ensure accurate, consistent, and defensible data collection for infrastructure evaluation and maintenance planning. The work is part of a larger infrastructure project under SAK Construction, LLC, and performance is expected to adhere to strict quality control measures aligned with national best practices for utility asset management. The solicitation is designated as a subcontract under the Small Business Administration’s set-aside programs, with eligibility limited to Small Business, Small Disadvantaged Business, Women-Owned Small Business, Veteran-Owned Small Business, Alaskan Native Corporations, Indian Tribes, and Disadvantaged Business Enterprises certified under the Department of Transportation’s DBE program. The NAICS code 541620 categorizes this as an engineering services contract, confirming the technical nature of the condition assessment work. The response deadline is September 10, 2026, and the performance location is tied to the SARP10 Humphreys Blvd CIPP project in Memphis, Tennessee, though specific site details are not fully defined in the provided data.
SAK Construction, LLC

POSTED

about 21 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541620
New
SLED
Quality Assurance and Compliance Testing (Environmental/Chemical)The contract requires third-party testing and verification of brine salt to ensure full compliance with TxDOT CAT 8C-B specifications, focusing on critical parameters such as concentration, purity, and corrosion characteristics. This work is essential for confirming that the brine salt meets the stringent environmental and chemical standards mandated by the Texas Department of Transportation for use in transportation infrastructure applications. The testing must be conducted by qualified external laboratories with proven expertise in chemical analysis and environmental compliance to guarantee accurate, reproducible results aligned with state requirements. The solicitation is classified as a subcontract under NAICS code 541620, indicating it involves scientific and technical testing services. It is posted under the Texas SmartBuy portal with a response deadline of September 1, 2026, allowing potential bidders sufficient time to prepare detailed proposals demonstrating their technical capability, equipment certification, and experience with similar transportation-related materials testing. The place of performance and point of contact details are unspecified, but all work must align with Texas Department of Transportation's operational and regulatory expectations, ensuring the brine salt used in state projects remains safe, effective, and environmentally compliant.
Texas Department of Transportation

POSTED

about 21 hours ago

DEADLINE

in 24 days
View Details
NAICS: 541620
New
SLED
Erosion Control and Stormwater ManagementThe contract pertains to erosion control and stormwater management activities required during and after construction projects under the jurisdiction of the Texas Department of Transportation. It encompasses the installation and maintenance of best management practices such as silt fences, sediment basins, inlet protection structures, and related measures designed to prevent sediment runoff and protect water quality. The work must be performed in accordance with state and federal environmental regulations to mitigate the impact of construction on surrounding ecosystems and waterways. All activities are to be completed within the designated project areas, with strict adherence to timelines and performance standards. The contract is classified as a subcontract and is open for bids with a response deadline of September 2, 2026. It falls under the NAICS code 541620, indicating it involves environmental consulting and related services. The solicitation was posted on August 7, 2026, and is accessible through the Texas SmartBuy portal. While specific performance locations and contact details are not provided, the work is expected to occur across various Texas transportation construction sites. Contractors must demonstrate experience in implementing erosion and sediment control systems and be prepared to provide documentation and inspections to verify compliance with established environmental protocols.
Texas Department of Transportation

POSTED

about 21 hours ago

DEADLINE

in 25 days
View Details