This Solicitation opportunity from Hawaii was posted on January 29, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for 6. General Site Map: A technical drawing or site map document identifying hydrant drain locations as part of the project specifications.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Central Oahu Agriculture and Food Hub Site Improvements and Sewer Lift Station Plans: Technical plans and specifications for site improvements and a sewer lift station in Wahiawa, Oahu, Hawaii. The document includes DAGS Job No: 12-11-7758, post-construction Best Management Practice (BMP) notes for storm water runoff, biofiltration and vegetated swale summary tables, and detailed road section and curve data.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Conceptual Plans - Building R & T: The document contains conceptual architectural and engineering plans for Building R and Building T. It provides technical specifications and visual layouts necessary for procurement planning and contractor bidding.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for IFB 24 200 020 Addendum #1: Addendum #1 to IFB 24 200 020 for the High Pressure Processing Facility in Whitmore, Oahu. Dated/procurement notice posted February 16, 2024, it adds additional pre-bid site visit dates, revises the submission of questions section, and directs offerors to submit questions through HlePRO by March 5, 2024, with answers posted March 7, 2024.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for IFB 24 200 020 Addendum #3 - High Pressure Processing Facility: Addendum #3 for IFB 24 200 020 regarding the High Pressure Processing Facility in Whitmore, Oahu. This document provides answers to prospective bidder questions, confirming a 5% bid bond requirement and stating an overall project budget of $5,500,000.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for IFB 24 200 020 Addendum #4 Q&A: Addendum #4 to IFB 24 200 020 for the High Pressure Processing Facility in Whitmore, Oahu. Dated March 18, 2024, this document provides answers to bidder questions and clarifications on warranty coverage, HVAC, utilities, slab capacity, permitting, crane demolition, inspections, geotechnical work, lighting, electrical enclosure ratings, network cabling, and other design-build requirements.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for IFB 24 200 020 Addendum #5 - High Pressure Processing Facility: Addendum #5 for IFB 24 200 020 regarding the High Pressure Processing Facility in Whitmore, Oahu. This document updates the 'Submission of Bids' section on page SP-3, specifying that bids must be submitted electronically via HIePRO by 2:00 p.m. on Tuesday, April 16, 2024. It explicitly prohibits submissions via mail, facsimile, or email and provides guidance on labeling proprietary information.
PDF
PDF, High priority: read this firstifb
HighAI Summary for IFB-24-200-020 High Pressure Processing Facility: Invitation for Bid IFB-24-200-020 issued by the State of Hawaii Agribusiness Development Corporation for a design-build High Pressure Processing Facility in Whitmore, Oahu. Notice date is January 29, 2024, with bids due via HIePRO by April 2, 2024 at 2:00 p.m. The document includes notice to bidders, bid form, wage certificate, special provisions, specifications, and a base bid pricing schedule covering mobilization, machine installation, building renovation, hazardous materials removal, and additional work.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for IFB 24 200 020 - High Pressure Processing Facility Whitmore, Oahu - Addendum #2: Addendum #2 dated February 20, 2024, for IFB 24 200 020 regarding the High Pressure Processing Facility in Whitmore, Oahu. This document replaces the Bid Form, Special Provisions, and Specifications dated January 29, 2024, and includes a new Bid Form with a base bid schedule for mobilization, machine installation, building renovation, and hazardous materials removal.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Limited Pre-Demolition Hazardous Material Assessment Report - Central Oahu Agriculture Food Hub: Limited pre-demolition hazardous material assessment report dated July 12, 2023, prepared by OSHE Group LLC for the State of Hawaii Agribusiness Development Corp. It documents asbestos and lead-based/lead-containing paint survey protocols, laboratory results, locations, quantities, conditions, and recommendations for 19 structures at the Future Central Oahu Agriculture Food Hub in Wahiawa, Hawaii. The report includes executive summary, inspection protocols, laboratory summaries, photos, and certifications to support future demolition planning and hazardous materials notification/abatement.
PDF
PDF, High priority: read this firstsow
HighAI Summary for OSHE23009 Limited Pre-Demolition Hazardous Material Assessment Report: Limited pre-demolition hazardous material assessment report dated July 12, 2023, prepared by OSHE Group LLC for the State of Hawaii Agribusiness Development Corp. for the Future Central Oahu Agriculture Food Hub site in Wahiawa, Hawaii. The report documents asbestos and lead-based/lead-containing paint survey protocols, laboratory results, and recommendations for 19 structures across Parcels 4 and 9. It identifies multiple asbestos-containing materials and lead paint detections, with attached lab reports, photos, certifications, and chain-of-custody records.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Specifications: High-Pressure Processing Facility, Oahu: Dated January 2024, this document outlines the technical specifications and scope of work for a design-build installation of a High-Pressure Processing (HPP) facility on Oahu. It includes requirements for the purchase and installation of an HPP machine (2,500 lbs/hr throughput), the rehabilitation and expansion of two buildings (6,500 and 2,625 sq ft), site improvements, sanitary food handling design, and specific flooring and lighting standards. It also defines contractor qualifications, including a Hawaii 'B' license and 5 years of experience, and detailed liability insurance requirements.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Whitmore Community Food Hub Proposed Utility Plan: A Basis of Design exhibit (Exhibit 7) for the proposed utility plan and sewer lift station associated with the Whitmore Community Food Hub site improvements in Wahiawa, Oahu, Hawaii, dated January 30, 2024, prepared by Austin Tsutsumi & Associates, Inc.
PDF
PDF, Low prioritycontract-document
LowAI Summary for AG 008 103D General Conditions: Standard General Conditions for contracts under Hawaii Revised Statutes (HRS) chapter 103D. The document outlines the legal relationship between the State and the Contractor, including independent contractor status, tax responsibilities, personnel requirements, nondiscrimination, and various administrative clauses regarding payment, termination, and compliance.
PDF
PDF, Low priorityreport
LowAI Summary for Preliminary Summary for High Pressure Processing (HPP) in Hawaii: Preliminary Summary for High Pressure Processing (HPP) in Hawaii, prepared by the University of Hawai'i Community Design Center and submitted to the Agribusiness Development Corporation in May 2022. The report summarizes feasibility research, public engagement, site and program considerations, precedent studies, and proof-of-concept conceptual master planning for an HPP facility at the Whitmore Community Food Hub Complex. It also outlines recommended next steps, appendices, and key findings related to integrating HPP technology with agricultural processing, storage, and related facility planning.
PDF
PDF, Low priority243 pages · specifications
LowAI Summary for Whitmore Village Properties Phase I ESA: Draft Phase I Environmental Site Assessment (ESA) dated August 29, 2013, prepared by Bureau Veritas North America, Inc. for the Trust for Public Land. The report evaluates recognized environmental conditions for approximately 479 acres of land in Wahiawa, Oahu, Hawaii, in accordance with ASTM E1527-05 standards to support a property acquisition.
PDF
PDF, Low priority70 pages · other
LowAI Summary for Whitmore Village Property Phase II Environmental Site Assessment: A Phase II Environmental Site Assessment report dated December 9, 2013, prepared by ENPRO Environmental for the Agribusiness Development Corporation. The document assesses potential soil contaminants at the Whitmore Village property (TMK (1) 7-1-002:009) in Wahiawa, Hawaii, following a previous Phase I assessment.
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
1 update
PhaseClosed
Posted
Solicitation
Deadline changed
Response deadline changed from Apr 16, 2024 to Apr 2, 2024.
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.