Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Highland Tank Replacement Project

Forecast
098-25State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Highland Tank Replacement Project, managed by the San Lorenzo Valley Water District in California, involves replacing three aging 10,000-gallon temporary polyethylene water tanks with a single 120,000-gallon fire-resistant steel tank. Located in Boulder Creek, Santa Cruz County, the project aims to increase water storage capacity and improve fire flow reliability to mitigate ongoing drought and wildfire risks without expanding the existing service area. The scope of work includes the installation of the steel tank, a new concrete foundation, a drainage system, security fencing, and ground surface repairs. The project is classified as a forecast with a performance period from July 29, 2025, to September 2, 2025. Due to the urgent need to address emergency conditions, the project is exempt from CEQA under Statutory Exemption 15269(c) and is supported by state emergency proclamations that allow for the suspension of standard competitive bidding and procurement rules. Chris Klier, the Environmental Programs and Special Projects Manager, serves as the primary point of contact. The project is categorized under NAICS code 237110.

General Info

Replace three aging tanks with one 120,000-gallon fire-resistant steel tank under emergency authority to boost water storage and firefighting capacity.

Agency

California → San Lorenzo Valley Water District

Place of Performance

East side of Highland Drive, north of Debbie Drive, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → San Lorenzo Valley Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → San Lorenzo Valley Water District
Office AddressN/A

Full Description

Show more
Replacement of temporary polyethylene water tanks, installed to replace original leaking redwood tank, with larger fire-resistant steel tank that provides increased water supply storage capacity and fire flows for the existing service area, with no expansion of service, to address ongoing drought and fire risk.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sanitary sewer system improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of PVC and DIP piping ranging from 6 to 30 inches, the construction of standard and doghouse manholes, and the execution of 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional requirements include CSO regulator fit out, outfall construction, maintenance of flows and bypass operations, and the abandonment of existing pipes and manholes. Project execution requires strict adherence to environmental standards through SWPPP implementation and maintenance, as well as the use of geotechnical instrumentation and monitoring. Due to the project location and nature, railroad insurance is a mandatory requirement. General site preparation tasks such as clearing and grubbing of wooded areas and subsequent seeding and fine grading are also included in the bid schedule.
Cleary Construction, Inc.

POSTED

about 5 hours ago

DEADLINE

in 16 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS