Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Highway Drainage Study and Design

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

Adelanto, CA, 92301, USA

Set-Aside

NONE

Documents

This scope was carved out of 20261008034.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

On-Call Traffic Engineering And Caltrans Coordination Services For Highway 395 At Lawson Avenue And Cortez Avenue

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → CITY OF ADELANTO
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → CITY OF ADELANTO
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs hydrological analysis and drainage design for prime contractors on City of Adelanto highway projects. Conducts comprehensive drainage studies and designs modifications to existing drainage facilities using Hydrologic and Hydraulic (H&H) modeling software per Caltrans Drainage Requirements. Delivers finalized Drainage Study Reports and improvement plans.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
IMPROVEMENTS TO COPPERMILL RD CULVERT ALONG GOFF BROOK
Solicitation # 2027-01
The Town of Wethersfield is soliciting proposals from qualified consulting firms to provide engineering services for the replacement of the Coppermill Road culvert along Goff Brook, identified as Bridge No. 159012. The primary objective is to develop preliminary engineering documents and a 30 percent design to support the Town's application for construction funding through the State Local Bridge Program. The scope of work encompasses project management, surveying by a Connecticut Licensed Land Surveyor, culvert inspection, hydrologic, hydraulic, and scour analysis, and an evaluation of alternatives including full replacement or rehabilitation methods such as slip-lining or cured-in-place pipelining. Key deliverables include a preliminary engineering report, a preliminary plan set, a construction cost estimate, a permit identification memorandum, and a project risk register, all provided in PDF and editable native formats. Proposals are due by 12:00 p.m. on November 6, 2026, and must be submitted as three color hard copies and one digital PDF to the Town of Wethersfield Finance Department. Award selection is based on consultant qualifications, with a focus on professional expertise, experience with Connecticut municipalities, and a demonstrated capacity to meet the scope of services. Required submission materials include a not-to-exceed fee proposal, resumes of key personnel, five professional references, and evidence of at least three similar projects completed within the last five years. Additionally, firms must provide a Certificate of Insurance and comply with the Connecticut Fair Employment Practices Act by submitting an Equal Opportunity Policy Statement and a detailed fair employment practices questionnaire.
DAS Procurement

POSTED

about 5 hours ago

DEADLINE

in 28 days
View Details
NAICS: 541330
New
Federal
SCSTC Instructor Services Follow-on
Solicitation # N0017827R3102
The SCSTC Instructor Services Follow-on is a combined Advance Notice and Sources Sought for the Naval Surface Warfare Center Dahlgren to obtain instructional, curriculum development, and technical support services for the U.S. Navy and foreign military partners. The scope of work supports the Surface Combat Systems Training Command through schoolhouse training, Mobile Training Teams, Combat Information Center Training Teams, and Billet Specialty Training via the Littoral Combat Ship Training Facility. The requirement is structured as a hybrid contract consisting of Firm Fixed Price for stable, measurable services and Cost-Plus-Fixed-Fee Level of Effort for emergent and developmental support. The anticipated period of performance includes a twelve-month base period with four subsequent twelve-month option years, totaling sixty months. The effort requires a significant labor force, including key personnel such as Instructor Leaders, Senior Mentors, and Training Coordinators, alongside various tiers of instructors and training material analysts. Specific qualifications are mandated, including Cybersecurity Workforce Certifications for Tier II and III instructors and USCG licenses or documented sea experience for LTF Navigation and Ship handling instructors. Contract administration requires invoicing through the Wide Area Workflow module in PIEE and financial reporting via the eCRAFT system. Interested SeaPort MAC holders must submit capability statements and certify their status regarding organizational conflicts of interest and limitations on subcontracting.
Nswc Dahlgren

POSTED

about 8 hours ago

DEADLINE

in 7 days
View Details
NAICS: 541330
New
SLED
City of Ansonia/Ansonia School Building Commission RFQ for Commissioning Agent
Solicitation # 39363
The City of Ansonia and the Ansonia School Building Commission are seeking a qualified professional firm to serve as the Commissioning Agent for the construction of a new Middle School and District Central Administrative Offices located at 64 and 78 Pulaski Highway, Ansonia, Connecticut. The selected agent will provide professional services throughout the design, bidding, procurement, construction, and occupancy phases to ensure all building systems are planned, installed, and optimized according to project specifications. All work must comply with the Connecticut High Performance Building Standards for State Agency and School Buildings and Connecticut General Statutes Section 16a-38k. The selection process is a two-stage RFQ/RFP evaluation where the Most Qualified Proposer will be chosen based on legal status in Connecticut, professional expertise in public school projects over the last five years, team structure, past performance, and pricing. Required qualifications include a Certified Commissioning Professional designation from the Building Commissioning Association or an equivalent certification from the Association of Energy Engineers, which must be maintained for the duration of the contract. The contract utilizes a modified AIA Document A201-2017 and requires a lump sum fee for base services and hourly rates for additional services. Proposals must be submitted by November 2, 2026, consisting of an RFQ response and a sealed RFP response containing the fee proposal and a non-collusion affidavit. Submissions require one original and three paper copies delivered to Ansonia City Hall, along with a digital copy. The successful firm will be subject to strict insurance requirements, network security and privacy liabilities regarding student and sensitive records, and a monthly invoicing process tied to the percentage of completion for each project phase.
DAS Procurement

POSTED

about 8 hours ago

DEADLINE

in 24 days
View Details
NAICS: 541330
New
Federal
Independent Commissioning Agent (Owner’s Advocate) Services for U.S. Army Medical Research Institute of Infectious Diseases
Solicitation # EMO-26-0001
The Defense Health Agency Contracting Activity is seeking information for an Independent Commissioning Agent to serve as an Owner's Advocate for Building 8100 at the U.S. Army Medical Research Institute of Infectious Diseases in Fort Detrick, Maryland. This third-party technical expert will bridge the gap between prime construction execution and the stringent biosafety and regulatory requirements of the end-user. The scope involves a non-severable 60-month period of performance focused on verifying critical facility systems, including BSL-3 and BSL-4 containment, negative pressure cascades, and effluent decontamination systems. The agent will be responsible for 100% on-site witnessing of failure-scenario testing, conducting gap analyses for Federal Select Agent Program registration, and managing a phased transition to functional occupancy. The government is contemplating a Firm-Fixed-Price contract with Performance-Based Milestone Payments under NAICS code 541330. Technical evaluation may involve oral presentations from key personnel, specifically the Lead Commissioning Engineer and Biosafety Regulatory Lead. To avoid organizational conflicts of interest, the contractor must remain independent from the facility's prime construction contractors and shall not perform architectural design or engineering stamps. Interested parties must submit a capability statement and a non-binding Rough Order of Magnitude pricing estimate by November 9, 2026, detailing their experience with high-containment biological facilities and regulatory compliance under 42 CFR Part 73.
Army Medical Resources Acq Activity

POSTED

about 8 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from California → CITY OF ADELANTO

Same awarding agency

NAICS: 541330
New
SLED
On-Call Traffic Engineering And Caltrans Coordination Services For Highway 395 At Lawson Avenue And Cortez Avenue
Solicitation # 20261008034
The City of Adelanto is soliciting proposals for on-call traffic engineering and Caltrans coordination services for the Highway 395 intersections at Lawson and Cortez Avenues. The selected consultant will be responsible for securing approvals for access points and traffic control improvements, which includes obtaining Project Approval and Environmental Document approval through the Quality Management Assessment Process and processing Right-of-Way Decertification. Key deliverables include finalizing preliminary plans, conducting a drainage study, producing a Traffic Operations Report, and completing an Intersection Safety and Operational Assessment Process in accordance with the Caltrans Highway Design Manual. The selection process is based on a combined score of technical evaluations and fee proposals, with weights assigned to experience (35%), understanding of the scope (30%), approach (20%), and references (15%). The top three ranked firms may be interviewed before fee proposals are opened. The resulting contract will be a Professional Services Agreement where work is performed on a task order basis. The City will pay compliant monthly invoices within 30 days, though it reserves the right to retain up to 5 percent of total compensation until final acceptance of services. Proposals must be submitted electronically to the City Clerk by November 2, 2026.
Engineering Services

POSTED

about 15 hours ago

DEADLINE

in 24 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS