This Solicitation opportunity from Department Of Defense was posted on August 20, 2019. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Hills Creek Oil Spill Prevention System

Closed
W9127N19R0017Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Pennsauken Community Pool Improvements
Solicitation # 2026-BID-15
The Township of Pennsauken, New Jersey, is soliciting bids for the complete rehabilitation and improvement of the Pennsauken Community Pool under solicitation number 2026-BID-15. The scope of work includes significant structural improvements to the pool, the demolition and construction of the pool mechanical room, electrical upgrades, and the installation of plumbing and other general complex upgrades. Specific deliverables include reinforced concrete flooring and walls, sandblasting the pool interior, and the installation of two 25 by 25 foot shade structures. All work must adhere to the 2019 NJDOT Standard Specifications for Road and Bridge Construction, the Americans with Disabilities Act of 1990, and New Jersey Prevailing Wage Act requirements. Bids must be submitted electronically via the OpenGov Procurement Portal by November 10, 2026, at 10:30 AM. The contract will be awarded to the lowest qualified responsible bidder. Submission requirements include a bid bond of 10 percent not to exceed 20,000 dollars, a notarized Non-Collusion Affidavit, a Certificate of Non-Debarment, and signed acknowledgments for Addenda 01 and 02. The successful contractor must provide a performance bond within three days of the contract award. The initial contract period is one year, with a possible one-year extension upon mutual agreement. Payment will be processed through the Township Governing Body following certification by the Township Engineer and the submission of itemized invoices and certified payrolls.
Procurement

POSTED

about 17 hours ago

DEADLINE

in 11 days

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Hills Creek Dam, OAKRIDGE, OR, USA

Set-Aside

SBA

Documents

15

605-5150-03 Fixed Axle EZ Clean Open Top Tank Data Sheet

PDF, High priority: read this firstspecifications
High

PEWE Oil/Water Separator Specification

PDF, High priority: read this first4 pages · specifications
High

Proj 1834 - Hills Creek Dam Seepage Explorations Site Plan and Borings

PDF, High priority: read this first6 pages · specifications
High

W9127N19R0017 Amendment 0001

PDF, High priority: read this first2 pages · amendment
High

W9127N19R0017 Amendment 0002

PDF, High priority: read this first2 pages · amendment
High

W9127N19R0017 Amendment 0003

PDF, High priority: read this first15 pages · amendment
High

W9127N19R0017 Amendment 0004

PDF, High priority: read this first2 pages · amendment
High

W9127N19R0017 - Hills Creek Oil Spill Prevention System

PDF, High priority: read this first594 pages · rfp
High

19R0017 Site Visit Attendees - Hills Creek Oil Spill Prevention System

PDF, Low priority1 page · other
Low

Hills Creek Dam Pre-Award Site Visit Instructions

PDF, Low priority2 pages · presolicitation
Low

OWS-200 Oil/Water Separator Operations Manual

PDF, Low priority11 pages · specifications
Low

Water Equipment, LLC OWS-200 Operations Manual

PDF, Low priority11 pages · specifications
Low

2_20190815_130532.jpg

JPG

A.01.13_HCR_OSPS_ADVERTISE_DRAWINGS.pdf

PDF

A.01.13_HCR_OSPS_FOR_INFORMATION_ONLY_DRAWINGSADVERTISE.pdf

PDF45 pages

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

8 updates
PhaseClosed
Posted

Presolicitation

Notice updated

Response deadline changed from Apr 8, 2019 to Aug 11, 2019. The notice description changed.

Notice updated

Response deadline changed from Aug 11, 2019 to Aug 13, 2019. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from Aug 13, 2019 to Aug 19, 2019. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Aug 19, 2019 to Aug 23, 2019. The notice description changed.

Type Changed

Presolicitation → Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Portland
Contacts2 people available
OfficePORTLAND, OR, 97204-3495, USA
Office AddressPORTLAND, OR, 97204-3495, USA
Contacts
Michael E. SaldanaContract Specialist
David C. BooneContracting Officer

Full Description

Show more
Synopsis: The U.S. Army Corps of Engineers (USACE) Portland District intends to solicit construction firms who are interested in submitting a competitive firm-fixed-price proposal for this project. This announcement is for Hills Creek Dam Oil Spill Prevention System, located in Lane County, Oregon. Project Description: The U.S. Army Corps of Engineers, Portland District, has a requirement for an Oil Spill Prevention System which includes installation of equipment and modification of existing systems to meet oil spill prevention goals at the Hills Creek project site. This work includes demolition and removal of the existing oil/water separator (OWS) vaults and installation of a new OWS that meets the required specification; Separation of the combined powerhouse unwatering and drainage sump with a cast-in-place concrete dividing wall; Installation of new drainage pumps, piping, and sump controls; Modifications to existing sump piping; Installation of new hydrocarbon detectors in the new sumps and a belt skimmer for removal of oil from the drainage sump; Modification of the existing intake tower drain exposed in the powerhouse lower gallery to provide secondary containment for oil filled operating equipment; Replacement of the existing pressure relief device (PRD) on the main unit step up transformer with a directional PRD to prevent oil releases and mitigate the risk of oil spills and fire/explosion; Installation of a new underground vault with valves to isolate the discharge of the OWS; Repair of the existing concrete diesel containment pit in the intake tower; Installation of a hydrocarbon meter, temperature probe, and flow meter for future NPDES permit compliance; and new underground utilities for power and controls between the powerhouse and the new OWS. The period of performance from contract award is estimated to be NLT 20 August 2019 to final construction physical completion date of 30 June 2020. Acquisition Strategy: The solicitation will be a request for proposal (RFP). Best Value/Trade Off source selection process will be used in the evaluation of proposals. Evaluation criteria will be stated in the RFP. The Government will include options in the RFP. This acquisition will result in a single firm-fixed-price contract. Magnitude of Construction: The estimated cost of the project is between $1,000,000 and $5,000,000. Set Asides and Codes: This is a 100% Small Business set-aside, utilizing other than full and open procedures. This effort is classified through the North American Industry Classification System (NAICS) under code 237990, Other Heavy and Civil Engineering Construction (Size Standard: $36.5M).The FSC is Z2KZ - Repair or Alteration of Dams. Proposal Period: The solicitation is scheduled for release on or about 8 April 2019. The tentative date for receipt of proposals is on or about 23 May 2019. Plans and Specifications: The solicitation will be posted on the Federal Business Opportunities website, https://www.fbo.gov/, once it is issued. Firms are requested to register electronically to receive a copy of the solicitation when it is issued. System for Award Management (SAM): Offerors must register in the SAM at https://www.sam.gov/portal/public/SAM/ prior to receiving an award. Point of Contact: The USACE-NWP Contract Specialist will be the primary point of contact for this action. E-mail responses to the Primary Point of Contact, Mr. Michael Saldana at contact@example.gov. Email is the preferred method for receiving responses to this pre-solicitation notice. For Small Business questions, please contact Mrs. Carol A. McIntyre at contact@example.gov or via phone at +1 (555) 000-0000. THIS PRE-SOLICITATION NOTICE IS FOR THE PURPOSE OF INFORMING INDUSTRY THAT THIS SOLICITATION WILL BE POSTED ON FBO ON OR ABOUT 8 APRIL 2019. THIS NOTICE IS NOT A REQUEST FOR PROPOSALS AND PROPOSALS RECEIVED AS A RESULT OF THIS PRE-SOLICITATION NOTICE WILL NOT BE ACCEPTED OR EVALUATED. THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS SOLICITATION EITHER BEBORE OR AFTER THE CLOSING DATE. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS PRE-SOLICITATION NOTICE OR ANY FOLLOW-UP INFORMATION REQUEST.

More opportunities from Department Of Defense → W071 Endist Portland

Same awarding agency

NAICS: 238220
New
Federal
John Day Dam Powerhouse HVAC Upgrades
Solicitation # W9127N26BA006
The U.S. Army Corps of Engineers Portland District is seeking a single firm-fixed-price contract for comprehensive HVAC upgrades at the John Day Dam Powerhouse, located across Oregon and Washington. The project involves replacing primary and secondary chillers, installing four new chiller skid packages with approximately 600 tons of refrigeration capacity, and implementing a new automated digital HVAC control system. Key technical requirements include a mix of water-cooled and air-cooled systems, new intake and exhaust ducting for fire smoke propagation prevention, and the installation of mini-split units. The work must be performed within an active powerhouse containing high-voltage electrical equipment and areas prone to water intrusion, with a construction period of 1,004 calendar days. The estimated project magnitude is between 25 million and 100 million dollars under NAICS code 238220. A critical condition for award is compliance with Cybersecurity Maturity Model Certification, specifically CMMC Level 2 (Self) for the prime contractor and appropriate levels for subcontractors based on the type of information processed. The solicitation is expected to be issued as an Invitation for Bids in mid-September 2026, requiring bidders to have an active SAM registration and a current NIST SP 800-171 assessment.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

1 day ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS