Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

Hobart Mills - PLN22-0153; GPA22-0001; RZN22-0001; AAP22-0004; EIS25-0012

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Project application PLN22-0153 for Hobart Mills in Truckee, California, seeks to align zoning and General Plan Designations with existing uses previously approved under the 2019 Comprehensive Master Plan and PLN17-0097. The proposal aims to extend the development timeline for the owner and carry forward existing conditions of approval and mitigation measures. Any new uses not previously authorized will require separate permitting and evaluation for consistency with the Hobart Mills Comprehensive Plan. The application includes text amendments to the Comprehensive Master Plan to modify land use boundaries for aggregate processing, water storage, and drainage improvements. Specifically, the Industrial designation and corresponding M1-SP zoning will increase from 30.00 to 46.87 acres, while the Recreation and Open Space designations and their respective zoning will decrease to 28.06 and 58.07 acres. These changes are intended to ensure the legal zoning reflects the actual approved land uses.

General Info

Aligns zoning and General Plan designations for Hobart Mills project in Truckee, California.

Agency

California → Nevada County

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

State Highway 89, Truckee, CA, 96161

Set-Aside

NONE

Documents

(4)

PLN22-0153; EIS25-0012 -Hobart Mills IS-MND

PDF

PLN22-0153 Hobart Mills Summary Form

PDF

PLN22-0153 Notice of Completion & Environmental Document Transmittal

PDF

PLN22-0153 Hobart Mills NOI-NOA

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Nevada County
Contacts1 person available
OfficeN/A
Organization / Agency
California → Nevada County
Office AddressN/A
Contacts
David NicholasSenior Planner

Full Description

Show more
The project application (PLN22-0153) proposes to align the zoning and the General Plan Designations with the existing uses previously approved by the Comprehensive Master Plan (CMP) that was approved on July 3, 2019. The application also proposes to extend the amount of time the owner has to finish the development of the uses. PLN22-0153 does not propose any uses that were not previously approved under the existing approval (PLN17-0097). Accordingly, many of the conditions of approval and mitigation measures adopted for PLN17-0097 are proposed to be carried forward and applied to the continued development of the project. Any new uses not specifically approved by PLN17-0097 will be required to be permitted through the County land use process and will be evaluated for consistency with the Hobart Mills Comprehensive Plan as a separate application. PLN22-0153 includes text amendments to the existing CMP that reflect proposed changes to the zoning district and General Plan land use designation boundaries. These boundaries would be modified to align with the land uses approved under PLN17-0097 including the aggregate processing, water storage tank, and drainage improvements. The proposed General Plan amendment would increase the area designated Industrial (IND) from 30.00 acres to 46.87 acres; decrease the area designated Recreation (REC) from 40.00 acres to 28.06 acres; and decrease the area designated Open Space (OS) from 63.00 acres to 58.07 acres. The project proposes corresponding rezones that would increase the combined M1-SP-SC and M1-SP zoned area from 30.00 acres to 46.87 acres; decrease the combined REC-SP-SC and REC-SP zoned area from 40.00 acres to 28.06 acres; and decrease the combined OS-SP-SC and OS-SP zoned area from 63.00 acres to 58.07 acres. For clarity, the amended CMP would also remove the discussion concerning the permitting of existing uses because those uses were previously authorized under PLN17-0097.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Corydon Well Replacement (C2305)
Solicitation # C2305
Ardurra Group, Inc. is soliciting proposals for the Corydon Well Replacement Project (Work Order C2305) on behalf of the Elsinore Valley Municipal Water District in California. This professional services agreement seeks qualified DBE firms to provide comprehensive design, bidding support, and engineering services during construction. The scope is divided into two phases: Phase 1 focuses on civil site design, technical specifications, and construction management for the drilling of a new well and the abandonment of the existing one; Phase 2 covers architectural, civil, mechanical, structural, electrical, and I&C design drawings, as well as equipping, testing, and commissioning. Technical requirements specify the use of 24-inch diameter stainless steel Ful-Flo louvered well screens and compliance with AWWA potable water well construction standards, Riverside County, and California State Water Resources Control Board regulations. The contract is set aside for small and disadvantaged businesses, including DBE, WOSB, and SDVOSB entities. Award selection is based on the most advantageous proposal, considering both price and other factors. Key requirements include the provision of performance and payment bonds for 100 percent of the contract price, a bid guarantee of five percent, and adherence to California prevailing wage laws. Consultants must maintain active SAM registration and provide a project manager as the primary point of contact. Payment is processed via monthly itemized statements, with a 45-day review and payment cycle. Proposals must be submitted via PlanetBids by September 1, 2026, and must include a cover letter, a detailed project approach, staff resumes, a five-year representative project list, and three professional references.
Ardurra Group, Inc.

POSTED

about 5 hours ago

DEADLINE

in 7 days
View Details
NAICS: 541330
New
SLED
Portsmouth Seacoast Greenway Trailheads Design and Engineering
Solicitation # 01-27-RFP
The City of Portsmouth Department of Public Works is soliciting proposals under solicitation 01-27-RFP for engineering and design services to develop two trailhead facilities on city-owned land at 445 Borthwick Avenue and 850 Banfield Road. These facilities will provide public access to the New Hampshire Seacoast Greenway and are expected to include paved parking areas, concrete pads and enclosures for portable restrooms, bicycle racks, trailhead kiosks, wayfinding signage, landscaping, and seating areas. The scope of work also encompasses addressing drainage and utility impacts. Proposals must be submitted electronically via the City's e-Procurement Portal by September 21, 2026. The project is funded by 850,000 dollars in Congressional Directed Spending through the U.S. Department of Housing and Urban Development (HUD). Consequently, the selected contractor must strictly adhere to all HUD grant requirements, including specific standards for procurement, reporting, documentation, and labor compliance. The contract term is for one year with the possibility of extensions upon mutual agreement. Key administrative requirements include obtaining necessary security clearances prior to execution, maintaining comprehensive insurance and indemnification, and complying with nondiscrimination policies and all applicable federal, state, and local laws.
DPW

POSTED

about 12 hours ago

DEADLINE

in 27 days
View Details