Holley Lakebed Permit (PL-26-24)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Lake County

NAICS

N/A

Place of Performance

E. state Hwy 20 and Ogden Rd, CA, 95458

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Lake County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Lake County
Office AddressN/A
Contacts
Daniel BrancatiResource Planner

Full Description

Show more
The proposed project includes the construction of a new swimming platform and new boat lift. The project will be carried out through two (2) phases. Phase 1: adjacent to the existing seawall, the construction of a 3x34 foot gangway and a 10x30 ft suspended platform; this will include driving four (4) new metal pilings. Phase 2: the construction of an 18x30 ft boatlift with 3x30ft courtesy dock; this phase will require driving six (6) new pilings. Activities causing lakebed disturbances will occur between the October 16 – December 31 window; while other activities will be allowed to occur outside that window, per Water Resources. Lakebed disturbance would be limited to the area where six (6) 6-10-inch diameter pilings and thirteen (4) 4-8-inch pilings will be installed using a free fall hammer method. No digging, constant vibration or drilling will be used. No holes will be augured or dug all pilings will be installed using a hammer to drive them directly into the lakebed. Construction is anticipated to take approximately 60 days. All construction activities will be performed in the lake with the use of pontoon boats and barge. All loading of materials and boat launching will take place at existing boat ramps in lakeport. All staging with either take place at construction yard located at 1624 Parallel Dr, Lakeport, or on the barge at the job site.

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS