Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Hope Elementary School Water System Improvements Project

Forecast
SCH No. 2025090438State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Hope Elementary School Water System Improvements Project, managed by the City of Porterville under solicitation SCH No. 2025090438, is designed to provide the school with a reliable water source after the existing well was found to exceed regulatory nitrate contaminant levels. The scope of work involves constructing new water mains along South Indiana Street and West Teapot Dome Avenue to connect the school to the city water system. Key technical installations include a service connection and water meter to support domestic use, irrigation, and fire flow, as well as the decommissioning and destruction of the existing school well and the removal of an on-site water tank. The project has undergone a comprehensive environmental review process in compliance with the California Environmental Quality Act, resulting in a Mitigated Negative Declaration approved by the City Council on October 21, 2025. This review included detailed analyses of air quality, biological resources, and cultural resources, with specific requirements for archaeological personnel to meet the Secretary of the Interior's Professional Qualifications. The project is located in Tulare County and the City of Porterville, with Claudia Calderon serving as the primary point of contact for the Community Development Department.

General Info

City of Porterville will connect Hope Elementary to city water and decommission existing well.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Porterville
Contacts1 person available
OfficeN/A

Interested Companies (1)

Provost & Pritchard Consulting GroupClovis, CA

Full Description

Show more
The proposed project consists of a water system improvement project that would provide Hope Elementary School with a consistent and reliable source of water, as water produced by the existing well has been found to have nitrate levels higher than the regulatory maximum contaminant level. New water mains connecting the school to the City’s water system would be constructed along S. Indiana St. and W. Teapot Dome Ave. A 4-inch service connection and water meter would be installed, providing the school with the ability to use the new water main for domestic water use, irrigation, and fire flow school site. A water tank existing on-site would be removed, and the existing school well would be destroyed. No new connections to the extended water system are being proposed at this time.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sanitary sewer system improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of PVC and DIP piping ranging from 6 to 30 inches, the construction of standard and doghouse manholes, and the execution of 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional requirements include CSO regulator fit out, outfall construction, maintenance of flows and bypass operations, and the abandonment of existing pipes and manholes. Project execution requires strict adherence to environmental standards through SWPPP implementation and maintenance, as well as the use of geotechnical instrumentation and monitoring. Due to the project location and nature, railroad insurance is a mandatory requirement. General site preparation tasks such as clearing and grubbing of wooded areas and subsequent seeding and fine grading are also included in the bid schedule.
Cleary Construction, Inc.

POSTED

about 5 hours ago

DEADLINE

in 16 days
View Details

More opportunities from California → City of Porterville

Same awarding agency

NAICS: 237310
SLED
Tule River Tribe Complete Streets and Two Pedestrian Bridges
Solicitation # 2026041305
The Tule River Tribe Complete Streets and Two Pedestrian Bridges project, identified by solicitation number 2026041305, is a construction initiative managed by the City of Porterville and the California Transportation Commission. Located in Tulare County along North Reservation Road between Cow Mountain Road and Million Dollar Bridge within the Tule River Reservation, the project aims to improve pedestrian safety and access to an education center and gymnasium. The scope of work includes the construction of two pedestrian bridges, including the replacement of an existing swinging bridge and a new bridge connecting Cow Mountain Road to the Justice Center corridor. Additional infrastructure improvements consist of 484 feet of sidewalk, two new crosswalks, four rectangular rapid flashing beacon signals, a pedestrian refuge, intersection lighting, shade trees, and the reconfiguration of back-in angled parking stalls along with landscaping and irrigation. The project was approved following the preparation of a Mitigated Negative Declaration in compliance with the California Environmental Quality Act, ensuring that the work will not have a significant effect on the environment provided that specific mitigation measures and monitoring plans are adopted. Primary points of contact for the project include City Engineer Daniel Cervantez and Associate Deputy Director Cherry Zamora. The project is classified under NAICS code 237310 and is currently listed as a forecast with a posted date of July 1, 2026.
Highway, Street, and Bridge Construction

POSTED

5 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS