Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Hope House Foundation Repairs Project, Project# WH163A, CP#26-19

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Contra Costa County is seeking a contractor for the Hope House Foundation Repairs Project in Martinez, California. The project involves comprehensive structural repairs to a 24-hour residential treatment facility that supports up to 16 individuals transitioning from hospital care to the community. Key technical work includes the installation of hydraulically driven and drilled piers, polyurethane injection for slab lifting and waterproofing, soil nail installation for retaining wall stabilization, and the potential addition of subsurface drains. The scope also includes limited interior tenant improvements, specifically bathroom upgrades. Construction is scheduled to begin in spring 2027 with an estimated duration of one year. The project may require right-of-way acquisitions, utility relocations, and temporary easements. To ensure minimal disruption and safety, the contractor must implement dust control and storm drain protection, maintain constant access for emergency vehicles, and adhere to local guidelines for any necessary night or weekend work. This forecast is managed by the County's Senior Planner and Project Manager.

General Info

Contra Costa County seeks a contractor for Hope House structural repairs starting spring 2027.

Agency

California → Contra Costa County

NAICS

238190 - Other Foundation, Structure, and Building Exterior ContractorsView NAICS

Place of Performance

Allen Street, Barrellessa Street, Martinez, CA, 94553

Set-Aside

NONE

Documents

(1)

CP#26-19 NOE Hope House Foundation Repairs-signed

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Contra Costa County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Contra Costa County
Office AddressN/A
Contacts
Syd SotoodehSenior Planner
Shravan SundramProject Manager

Full Description

Show more
The Hope House facility serves as a 24-hour residential treatment center providing transitional care for individuals leaving hospitals who require additional support before re-entering the community. The facility accommodates up to 16 residents and plays a critical role in the County's behavioral health continuum by offering an alternative to hospitalization and supporting the recovery and reintegration of vulnerable populations. The County has determined that comprehensive foundation repairs are necessary to address deficiencies and ensure long-term viability of the building. The existing building foundation will be repaired by hydraulically driven piers which push against the building and drilling new piers that will support the existing foundation and concrete slab. Cracks in the existing slab will be repaired, and the slab is anticipated to be lifted in locations using a polyurethane injection which will also provide waterproofing. New soil nails will be used to stabilize an existing retaining wall. Subsurface drains may be added to control subsurface soil moisture. Additionally, there will be limited interior tenant improvement type work, most notably bathroom upgrades. Construction is anticipated to begin in spring 2027 and take approximately one year for completion. Appropriate best management practices such as dust control and storm drain inlet protection will be implemented. Ground disturbance and excavations are anticipated for the foundation work. Vegetation trimming and removal may be necessary. Real property transactions, including but not limited to, right-of-way acquisition and permanent and temporary easements, and utility relocations may be necessary in support of this project. Night or weekend work may be necessary and will be performed in accordance with local guidelines. Emergency vehicles will have access at all times.

Similar Contracts

Same NAICS industry code