Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on September 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

HOSE ASSEMBLY, NONME

Closed
SPE7M4-26-T-377WFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

Solicitation SPE7M4-26-T-377W, issued by the DLA Land and Maritime Fluid Handling Division, is a request for quotations for two nonmetallic hose assemblies under NSN 4720013002993. The procurement specifies a delivery timeframe of 20 days after the order is placed, with an original required delivery date of August 18, 2026. Delivery is FOB destination to the USNS Alan Shepard, and both inspection and acceptance will occur at the destination. The items are subject to a non-extendable shelf life of 120 months and must comply with specific material restrictions, including the prohibition of Class I ozone-depleting chemicals and the intentional addition of mercury or mercury-containing compounds. The contract mandates strict adherence to quality and packaging standards, including MIL-STD-2073-1E for packaging and MIL-STD-129 for marking. All shipments must follow DLA packaging requirements for procurement and utilize the Wide Area WorkFlow system for electronic invoicing and payment. Compliance with the Buy American Act, the Berry Amendment, and DFARS cybersecurity standards for safeguarding covered defense information is required. Additionally, the solicitation prohibits the use of additive manufacturing processes for the supplied parts unless specifically authorized.

General Info

Procurement of two nonmetallic hose assemblies for USNS Alan Shepard by August 18, 2026.

NAICS

332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing

Place of Performance

UNIT 100494 BOX 1, FPO, AP, 96678, USA

Set-Aside

NONE

Documents

1

SPE7M4-26-T-377W Request for Quotations

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FLUID HANDLING DIVISION
Contacts1 person available
OfficeUSA
Office AddressUSA

Full Description

Show more
HOSE ASSEMBLY,NONME
HOSE ASSEMBLY, NONMETALLIC.
RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS
(IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE
DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB
AT:
http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx
FOR SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-ON REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS.
RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
RQ011: REMOVAL OF GOVERNMENT IDENTIFICATION FROM NON-ACCEPTED SUPPLIES
CLASS I OZONE DEPLETING CHEMICALS ARE NOT TO BE
USED NOR INCORPORATED IN ANY ITEMS TO BE
DELIVERED UNDER THIS CONTRACT.THIS PROHIBITION
SUPERSEDES ALL SPECIFICATION REQUIREMENTS BUT
DOES NOT ALLEVIATE ANY PRODUCT REQUIREMENTS.
SUBSTITUTE CHEMICALS MUST BE SUBMITTED FOR
APPROVAL UNLESS THEY ARE AUTHORIZED BY THE
SPECIFICATION REQUIREMENTS.
RQ017: PHYSICAL IDENTIFICATION/BARE ITEM MARKING
.
Shelf-life Additional Requirements
MERCURY OR MERCURY CONTAINING COMPOUNDS SHALL NOT BE INTENTIONALLY ADDED TO<(>,<)> OR COME IN DIRECT CONTACT WITH<(>,<)> ANY HARDWARE OR SUPPLIES FURNISHED UNDER THIS CONTRACT. EXCEPTION: FUNCTIONAL MERCURY USED IN BATTERIES, FLUORESCENT LIGHTS, REQUIRED INSTRUMENTS; SENSORS OR CONTROLS; WEAPON SYSTEMS; AND CHEMICAL ANALYSIS REAGENTS SPECIFIED BY NAVSEA. PORTABLE FLUORESCENT LAMPS AND PORTABLE INSTRUMENTS CONTAINING MERCURY SHALL BE SHOCK PROOF AND CONTAIN A SECOND BOUNDARY OF CONTAINMENT OF THE MERCURY OR MERCURY COMPOUND. (IAW NAVSEA 5100-003D).
Shelf-life Additional Requirements
RS030: Shelf-life requirement RS001 for a TYPE I (CODE W) item with a shelf life of 120 months (non-extendable) applies to this item.
HYSTER-YALE GROUP, INC. 04627 P/N 354077
PARKER-HANNIFIN CORPORATION 87373 P/N F3020606-6-6-4-13.875W/SG066
SPE7M4-26-T-377W
SECTION B
PR: 7017960103 PRLI: 0001 CONT’D
DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to determine the corresponding ANSI X12 unit of issue.
https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments% 2FDLMS%2FeApplications%2FLogDataAdmin%2FUnitofIssueandPurchaseUnit.xlsx&wdOrigin=BROWSELINK
CLIN PR PRLI UI QUANTITY UNIT PRICE TOTAL PRICE.
0001 7017960103 0001 EA 2.000
NSN/MATERIAL:4720013002993
DELIVERY (IN DAYS):0020
DELIVER FOB: DESTINATION
QTY VARIANCE: PLUS 0% MINUS 0%
INSPECTION POINT: DESTINATION
ACCEPTANCE POINT: DESTINATION
PREP FOR DELIVERY:
PKGING DATA MIL-STD-2073-1E
QUP:001 PRES MTHD:AE CLNG/DRY:1 PRESV MAT:00
WRAP MAT:ZZ CUSH/DUNN MAT:ZZ CUSH/DUNN THKNESS:C
UNIT CONT:BV OPI:O
INTRMDTE CONT:DO INTRMDTE CONT QTY:AAA
PACK CODE:U
MARKING SHALL BE IN ACCORDANCE WITH MIL-STD-129.
SPECIAL MARKING CODE:33 -33 Type II, shelf life
PALLETIZATION SHALL BE IN ACCORDANCE WITH RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
PARCEL POST ADDRESS:
N23193
USNS ALAN SHEPARD T AKE 3
UNIT 100494 BOX 1
FPO AP 96678
US
RDD 777 SHIPMENT. TRANSPORTATION SEE DLAD PROC NOTE C19. FIRST DESTINATION TRANSPORTATION SEE DLAD PROC
NOTE C20 AND CONTRACT
FREIGHT SHIPPING ADDRESS:
N23193
USNS ALAN SHEPARD T AKE 3
DLA VENDORS: USE VSM FOR
US
M/F: (TCN) N231936222S278
RDD: 777
PROJ: HJ5 TP 2
SUPP ADD: YYSTOC SIG: A
FOR GOVERNMENT USE ONLY: (IPD) 05
SPE7M4-26-T-377W
SECTION B
PR: 7017960103 PRLI: 0001 CONT’D
DIC: A41 DIST: 9B ADV: FC: F4
Need Ship Date:00/00/0000 Original Required Delivery Date:08/18/2026
SPE7M4-26-T-377W NSN/Part Number: 4720-01-300-2993 Quantity: 2 EA Purchase Request: 7017960103QTY: 2 Delivery: 20 days ADO

More opportunities from Department Of Defense → FLUID HANDLING DIVISION

Same awarding agency

NAICS: 331210
New
DIBBS
TUBE AND FITTINGS, M
Solicitation # SPE7M4-26-T-8102
Solicitation SPE7M4-26-T-8102 is issued by the Department of Defense Fluid Handling Division for the procurement of three metallic tubes and fittings, identified by NSN 4710-01-315-6793. The requirement is not a small business set-aside and falls under NAICS code 331210. Delivery is required within 248 days after the date of order, with a target delivery date of November 27, 2026, to the DLA Distribution Depot Oklahoma at Tinker AFB. The procurement is managed under the First Destination Transportation program with FOB Origin terms, and both inspection and acceptance will occur at the destination per FAR 52.246-2. Compliance requirements include adherence to the DLA Master List of Technical and Quality Requirements, which takes precedence over ASTM D3951 for packaging. All shipments must be marked and labeled according to MIL-STD-129, and palletization must follow RP001 standards. The contract mandates strict cybersecurity compliance, requiring a CMMC Level 2 self-assessment and the posting of NIST SP 800-171 summary scores in the Supplier Performance Risk System. Additionally, the Buy American and Balance of Payments Program applies to quotes above the micro-purchase threshold, and the use of additive manufacturing processes is prohibited unless specifically authorized. Invoicing and payment must be processed electronically through the Wide Area WorkFlow system.
Iron and Steel Pipe and Tube Manufacturing from Purchased Steel

POSTED

3 days ago

DEADLINE

in 2 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS