Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on September 20, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Hot Aisle Containment with Server Rack

Closed
DCGFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 334111
New
Federal
P-8 ARMS and NGTSSC COTS Spares - RAAF
Solicitation # N6134026Q1027
The Naval Air Warfare Center Training Systems Division (NAWCTSD) Orlando is soliciting quotes for commercial off-the-shelf (COTS) spares to support the P-8 training system’s Automated Readiness Measurement System (ARMS) and Next Generation Training System Support Center (NGTSSC). These spares are intended for the Royal Australian Air Force (RAAF) P-8 aircraft platforms to facilitate realistic training and qualification exercises for pilots, aircrew, and maintainers. This procurement is a small business set-aside under NAICS code 334111 and is partially brand-name restrictive, requiring an exact match for specific manufacturers, part numbers, and configurations. All items must be new equipment procured from authorized sources and delivered FOB Destination to RAAF Base Edinburgh, South Australia, by May 21, 2027. The contract will be awarded as a firm-fixed-price order using the Lowest Price Technically Acceptable (LPTA) basis. Evaluation factors include price, technical acceptability, and past performance, with non-price factors rated as acceptable or unacceptable. The government will evaluate the combined total price of all line items, including all shipping and customs costs, and will apply a price preference for HUBZone small business concerns. Quotations must be submitted as three firm-fixed-price CLINs and include a completed Past Performance Questionnaire and proof of active registration in the System for Award Management (SAM). The total contract value is not expected to exceed the simplified acquisition threshold of 9 million dollars.
Nawc Training Systems Division

POSTED

about 21 hours ago

DEADLINE

in 10 days

General Info

NAICS

334111 - Electronic Computer Manufacturing

Place of Performance

Colorado Springs, CO, 80912, USA

Set-Aside

SBA

Documents

11

7-Tile Pitch - Definition and Scope of Mod-Build-Out Demo

PDF, High priority: read this firstspecifications
High

Attachment 4 Parts List - Data Center Containment

PDF, High priority: read this firstspecifications
High

Attachment 8 Drawing - Floor Layout

PDF, High priority: read this firstspecifications
High

Attachment A - Mod Build-Out Parts List v3

PDF, High priority: read this firstspecifications
High

Clauses and Provisions

PDF, High priority: read this firstspecifications
High

FA255024Q0053 - Hot Aisle Containment with Server Racks

PDF, High priority: read this firstrfq
High

HVAC System Study - Schriever SFB Technical Building 400 Report

PDF, High priority: read this firstspecifications
High

Question and Answer Document

DOCX, High priority: read this first1 page · q-and-a
High

Quote Worksheet - Rack Hardware and Data Center Equipment

XLSX, High priority: read this first5 pages · specifications
High

Schriever AFB Installation Facilities Standards (IFS)

PDF, High priority: read this firstspecifications
High

SOW - Hot Aisle Containment with Sixteen Server Racks (Schriever SFB)

PDF, High priority: read this firstsow
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

4 updates
PhaseClosed
Posted

Combined Synopsis

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Sep 20, 2024 to Sep 23, 2024.

Deadline changed

Response deadline time changed from 6:00 PM UTC to 4:00 PM UTC on Sep 23, 2024.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA2550 50 Cons Pkp
Contacts2 people available
OfficeSCHRIEVER SFB, CO, 80912-2116, USA
Office AddressSCHRIEVER SFB, CO, 80912-2116, USA

Full Description

Show more
All questions are due by 17 Sept 2024, 1200 MT. At this time, there is no site visit scheduled. The Government will establish a date if needed. Purchase, deliver, and install sixteen (16) seismic compliant IT Cabinet Racks in two hot aisle containment (HAC) configurations. Each HAC will have two rows of four cabinets for a total of eight cabinets per HAC. Each rack shall be fitted with a brush grommet rail kit, a copper bus bar, a vertical cable bar kit, blanking/filler panels, remote power distribution units (rPDU), rPDU bracket sets for vertical mounting in rear cabinet corner, ganging kits for the cabinets, and temperature sensors. - External Temperature Sensors - One (1) temperature sensors per cabinet mounted externally on the front of the cabinet to measure incoming air and connected to the rPDU. - Internal Temperature Sensors - One (1) temperature sensor per cabinet mounted on the rear of the cabinet (the hot aisle side) and connected to the rPDU. - Grounding the Racks - To protect personnel, equipment, and to minimize electrostatic discharge, each rack will be properly grounded and bonded IAW Schriever AFB Instruction 17-201 and applicable military and commercial standards. Containment Doors - Hot aisle(s) shall have containment doors mounted on each end of the hot aisle Biometric Door Locks installed on the front and rear of each cabinet. These locks shall be networked to the main control server. LED Strips - External rear mounted LED strips shall be placed on every other rack inside the hot aisle and connected to a normally open (off) motion sensor for lighting inside the hot aisle containment unit. Each LED strip shall be offset from the rack across from it. Thermal Curtains - Thermal breakaway curtains shall be installed from top of the cabinets to the ceiling of the mod approximately 30 inches. The curtains will break away in the event of fire and will not impede operation of any overhead sprinklers. They shall avoid contact with the ground as to not become a tripping hazard. They shall comply with the UFC and NFPA 75. (Include Fire Marshal direction w/ respect to sprinkler heads etc.) Main Control Server - A server with workstation, network time protocol server (Inter-Range Instrumentation Group [IRIG-B]), and network switch (this server will also be used to control/monitor the biometric locks). Floor Tiles - Install new floor tiles directly inside, under, and surrounding the two new HACs (excluding where floor vents shall be placed). See Attachment A and Attachment C. Floor Vents - Install twelve 12 manually adjustable-flow floor vents, 3 facing each cold side of each HAC. These vents shall be adjustable in vector as well as air flow output. Vents can be set and adjusted based on unique rack load. Temperature, Airflow, and Power Measurements - Pre-installation measurements - All test equipment shall be calibrated. Measure airflow and temperature from all currently existing vents within Mod 3 (~25), take at least 12 dispersed temperature measurements at a height of 4 feet within Mod 3. Record these on a room schematic where measurements were taken from and provide these to the program and project manager. With respective time stamps to correlate with power load at that time and number of people present within the mod at that time. - Post-installation measurements - All test equipment shall be calibrated. Measure airflow and temperature from all currently existing vents within Mod 3 (~25), take at least 12 dispersed temperature measurements at a height of 4 feet within Mod 3. Record these on a room schematic where measurements were taken from and provide these to the program and project manager. These requirements are not military unique. Hot aisle containment configurations are common throughout industry, especially in medium to large data centers. The hot aisle /cold aisle data center layout is a proven way to save energy in a data center. Hot aisle/cold aisle layout involves lining up server racks in alternating rows with cold air intakes - the fronts of servers - facing each other (the - cold aisle) and hot air exhausts - the backs of servers - facing each other (the - hot aisle). Raised floors are commonly used in data centers to provide an efficient way to deliver cold air from the computer room air conditioner (CRAC) unit to server racks. [Note: SSFB Building 400 Mods have raised floors.] CRAC units direct conditioned air into the sub-flooring. This pressurized cool air rises through perforations in floor tiles into cold aisle, where it is subsequently drawn into the front of servers to cool them. Hot exhaust air rises from server racks in the hot aisle and returns along the ceiling back to the to the CRAC unit intakes.

More opportunities from Department Of Defense → FA2550 50 Cons Pkp

Same awarding agency

NAICS: 236220
Federal
USSF Construction CSO
Solicitation # USSF-CSO-FY26-2808A
The United States Space Force (USSF) Space Operational Contracting Headquarters has established a Master Commercial Solutions Opening (CSO) under solicitation number USSF-CSO-FY26-2808A to streamline the design, construction, repair, and alteration of base infrastructure. Authorized under 10 U.S.C. § 2808a, this framework utilizes Other Transaction (OT) authority, making all resulting agreements completely exempt from the Federal Acquisition Regulation (FAR) and Defense Federal Acquisition Regulation Supplement (DFARS). The Master CSO serves as an umbrella solicitation, with specific project requirements published separately as Areas of Interest (AOIs). All awards must be structured as fixed-price agreements, including firm-fixed-price, fixed-price incentive, or fixed-price award fee structures, while cost-reimbursable agreements are strictly prohibited. The solicitation process employs a phased down-select method to minimize industry costs, consisting of a Phase 1 White Paper, a Phase 2 Oral Pitch, and a Phase 3 Full Commercial Proposal. Evaluation focuses on technical merit, constructability, schedule viability, and fair and reasonable commercial pricing. Selected partners must adhere to commercial industry building codes such as IBC and NEC, and may be required to comply with Unified Facilities Criteria (UFC) and Anti-Terrorism/Force Protection (AT/FP) standards. Payment is managed through a milestone-based system, where fixed-price payments are triggered only upon the verifiable completion of work that has passed inspection. Additionally, contractors must comply with Davis-Bacon Act wage rates and maintain specific insurance coverages, including Professional Liability for design-build projects of at least $2M.
Commercial and Institutional Building Construction

POSTED

21 days ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS