This Solicitation opportunity from Washington was posted on September 2, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Houck Creek Channel Rehabilitation and Livestock Exclusion Project, Jefferson County Conservation District, Port Townsend, WA #2025.07
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Jefferson County Conservation District is seeking bids for the Houck Creek Channel Rehabilitation and Livestock Exclusion Project in Port Townsend, Washington. The scope of work involves instream habitat restoration through the installation of six post-assisted log structures and six deformable grade controls to reduce incision and raise the channel bed. Additionally, the project requires the establishment of a 25-foot livestock exclusion buffer using riparian fencing and native plantings, the construction of a shallow swale to reconnect Houck Creek to the Salmon Creek Tributary, and the extension of a culvert at Uncus Road to serve as a dedicated livestock crossing. All work must adhere to NRCS conservation practice standards and specific engineering plans, including the implementation of erosion and sediment control measures. This public works contract requires the payment of prevailing wages per Washington State law. Critical timing constraints apply, as all work at or below the ordinary high-water mark must be completed within the WDFW permitted window from July 16, 2026, to October 31, 2026, with overall substantial completion required by May 30, 2027. A mandatory pre-bid meeting is scheduled for August 14 at 11:00 am at the project site. Interested parties must submit responses by the August 31, 2026, deadline.
General Info
Agency
NAICS
Place of Performance
Port Hadlock, WA, 98339, USASet-Aside
Documents
(198)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Submission Closed
Organization & Contact Information
Interested Companies (10)
See All 10 Interested Companies
Start a free trial to view all interested companies, their contact details, and full contractor profiles.
Full Description
As detailed in the Engineering Plans, the planned work will require erosion and sediment control measures.
The construction of the PALS and DGCs will occur at or below the ordinary high-water mark (OHWM) and must be completed within the permitted in-water work window defined by the Washington Department of Fish and Wildlife’s (WDFW) project Hydraulic Project Approval (HPA) permit. All work must be completed in compliance with the HPA and, all work at or below the OHWM must occur between July 16, 2026, and October 31, 2026. All Work must be substantially complete by May 30, 2027. This is a public works contract requiring payment of prevailing wages in accordance with Washington State laws.
Pre-Bid Meeting: Mandatory: 8/14 @ 11:00 am at W Uncas Rd, parking along the road near 922 W Uncas Rd
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS