Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Hunt Club PRS Rehabilitation

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Hunt Club PRS Rehabilitation project, managed by the Santa Margarita Water District, involves the rehabilitation of an existing underground pressure reducing vault located at the intersection of Hunt Club Drive and Fox Run in San Juan Capistrano, California. The primary objective is to restore the operational integrity and safety of the water distribution infrastructure by replacing interior piping, valves, fittings, and appurtenances that are over 45 years old. These components will be replaced in-kind with new materials of equivalent function and capacity, extending from the vault interior to the street main tie-ins. To ensure compliance with Cal/OSHA confined-space and fall-protection standards, the project includes the installation of a new vault lid, access hatch, and an access ladder equipped with a safety up-post. All work is restricted to the existing vault footprint and the immediately adjacent right-of-way, with no planned expansion of the structure, increase in system capacity, or change in operational function. This effort aims to reduce the risk of service disruptions and leaks while providing safer access for maintenance personnel. The project is categorized under NAICS code 237110 and has been granted a Class 1 and Class 2 categorical exemption under CEQA.

General Info

Santa Margarita Water District rehabilitating Hunt Club PRS vault piping and safety access.

Agency

California → Santa Margarita Water District

Place of Performance

Hunt Club Drive and Fox Run, San Juan Capistrano, CA, 92675

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Santa Margarita Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Santa Margarita Water District
Office AddressN/A
Contacts
Tricia ButlerChief Engineer

Full Description

Show more
The project consists of the rehabilitation of an existing underground pressure reducing vault within the public water distribution system. Work includes the complete replacement of all existing interior piping, valves, fittings, and appurtenances within the vault, extending from the vault interior back to the connection points at the street main tie-ins. The existing piping and valves, which are over 45 years old and have reached the end of their useful service life, will be replaced in-kind with new components of equivalent function and capacity. Additionally, the project will install a new access ladder equipped with a safety up-post (ladder extension) and a new vault lid/access hatch to provide compliant and safer confined space entry for maintenance personnel. All work will occur within the footprint of the existing vault and immediately adjacent right-of-way at the existing main connection points. No expansion of the vault structure, no increase in system capacity, and no change in operational function will result from the project. The purpose of the project is to restore and maintain the reliability, safety, and operational integrity of an aging component of the existing water distribution infrastructure. Replacement of the deteriorated 45+ year-old piping and valves will reduce the risk of in-service failure, leaks, and unplanned service disruptions, while the new ladder, safety up-post, and vault lid will bring worker access into compliance with current Cal/OSHA confined-space and fall-protection standards. The beneficiaries include the existing water customers served by this segment of the distribution system, who will continue to receive reliable water service with reduced risk of outages or pressure-related disruptions; agency operations and maintenance personnel, who will benefit from safer code-compliant access to the vault; and the general public, through the continued reliable operation of essential public water infrastructure.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project, managed by Norstar Plumbing and Engineering, Inc. for the Inland Empire Utilities Agency, involves the comprehensive installation, commissioning, and delivery of critical water and sewer infrastructure in Chino, California. The scope of work is centered on four major components: the Butterfield Dual Force Main, the Mountain Avenue Lift Station, the RP-2 Lift Station, and the Butterfield Lift Station. To achieve a fully functional system, the project requires a wide array of materials and services, including AC paving, trucking, jack and bore operations, cold planing, piping and fittings, traffic control, demolition, and preconstruction video services. This solicitation is specifically targeted toward SBA certified HUBZone Small Businesses and Disadvantaged Business Enterprises, with a strong emphasis on partnering with certified DBE, MBE, SBE, WBE, SBRA, and LSAF firms. Interested parties must submit their responses by the deadline of November 19, 2026, at 2:00 PM. Primary points of contact for this effort are Destiny Plummer and Nathan Plummer of Norstar Plumbing and Engineering, Inc. All work must be performed in strict accordance with the project bid documents and specifications provided via the Inland Empire Utilities Agency bidding website.
Norstar Plumbing and Engineering, Inc

POSTED

about 6 hours ago

DEADLINE

in 7 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS