Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on August 24, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

HVAC Air Rover

Closed
F3NT112139AW01Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333415
New
DIBBS
COOLING COIL, AIR, DUCT
Solicitation # SPE7M0-27-T-0178
Solicitation SPE7M0-27-T-0178 is issued by the DLA Weapons Support Maritime Supply Chain ESOC Buys for the procurement of one duct type air cooling coil, identified by NSN 4130011916131 and part number 19-80-2979M. The requirement is classified under NAICS code 333415 and is set aside for small businesses, with a specific price evaluation preference for HUBZone concerns. The original required delivery date is October 1, 2026, with a delivery window of five days after receipt of order. Delivery is FOB Origin, and both inspection and acceptance will occur at the destination, specifically the Puget Sound Naval Shipyard IMF in Bremerton, Washington. The contract mandates strict adherence to technical and quality requirements via the DLA Master List and specifies packaging and marking standards according to MIL-STD-2073-1E and MIL-STD-129. Special restrictions are in place regarding the use of mercury and the removal of government identification from non-accepted supplies. Administrative requirements include electronic invoicing through the Wide Area WorkFlow system and submission of all quotes via the DLA Internet Bid Board System by October 19, 2026. Key regulatory clauses apply, including the Buy American and Balance of Payments Program, NIST SP 800-171 assessment requirements, and safeguarding of covered defense information.
DLA WEAPONS SUPPORT MARITIME SUPPLY CHAIN ESOC BUYS

POSTED

about 20 hours ago

DEADLINE

in 2 days

General Info

NAICS

333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing

Place of Performance

Ramstein AFB, AE, DEU

Set-Aside

NONE

Documents

2

Air Rover RULCR60CA-15KW Characteristics

PDF, High priority: read this firstspecifications
High

HVAC+Air+Rover+Solicitation.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Combined Synopsis

Notice updated

Response deadline changed from Aug 24, 2022 to Sep 1, 2022. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA5613 700 Cons Pk
Contacts2 people available
OfficeAPO, AE, 09021-3076, USA
Office AddressAPO, AE, 09021-3076, USA
Contacts
Jan Ryan Sanchez
Warren Jenkins

Full Description

Show more
4 EA Recommended Model/Part number: Air Rover Model: RULCR60CA-15KW COOLING Total Cooling Capacity: 68,400 BTU/HR Maximum Ambient Temperature: +150'F Minimum Ambient Temperature: +50'F Design Return Air Dry Bulb Temperature: 90'F Design Return Air Relative Humidity: 50% Max Approximate Supply Airflow Rate: 2300 CFM HEATING Total Heating Capacity: 51,180 BTU/HR Heat Source(s) Electric Heaters Minimum Ambient Temperature: 50'F PHYSICAL DIMENSIONS Height: 46.00 (approximate with skid) Width: 34 Depth: 45.00 (overall including ducts) The unit must have the same dimensions in order for it to fit inside the HEMP boxes. The supply air and return air ducts are 18 in diameter. These must align in order for a metal slide to cover the ducts and minimize air loss. The condenser fan must exit through the top and also align perfectly for a metal slide to direct the air out of the box. The condenser coils are on both sides of the unit and have metal boxes with waveguides built in that must also align in order for the air to flow in. Any variation in alignment will cause the unit to malfunction with loss of air flow and overheating problems. POWER REQUIREMENTS Voltage: 208 Volts Tolerance Recommended - 10% Number of Phases: 3 Phase Frequency: 60 Hz Maximum Power Draw: 11.6 kW (Cooling) 15 kW (Heating)

More opportunities from Department Of Defense → FA5613 700 Cons Pk

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS