Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

HVAC Demolition and Deconstruction

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for HVAC Demolition and Deconstruction involves the removal and disposal of existing HVAC systems for prime contractors on projects located at Fort A.P. Hill Garrison. The scope of work includes the demolition of a 15-ton heat pump system, hot water coil auxiliary heat, and all associated piping and ductwork in accordance with UFGS 02 41 00. The contractor is required to use specialized refrigerant recovery equipment to ensure safe removal and must strictly adhere to the standards set by the Fort A.P. Hill Environmental Management Division. The final deliverable for this project is a fully cleared site. The response deadline for this opportunity is December 14, 2026.

General Info

HVAC demolition and disposal at Fort A.P. Hill Garrison due December 14, 2026.

Place of Performance

Fort A.P. Hill Garrison, VA, USA

Set-Aside

NONE

Documents

This scope was carved out of IFB IGSA #26-05.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

IFB IGSA #26-05 Building 179 NEC HVAC Replacement

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 28 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 1 document on the prime contractFrom IFB IGSA #26-05 Building 179 NEC HVAC Replacement
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyVirginia → Town of Bowling Green
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs removal and disposal of existing HVAC systems for prime contractors on Fort A.P. Hill Garrison projects. Demolishes 15-ton heat pump system, hot water coil auxiliary heat, and associated piping and ductwork per UFGS 02 41 00. Utilizes refrigerant recovery equipment for safe removal. Adheres to Fort A.P. Hill Environmental Management Division (EMD) standards. Delivers a cleared site.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
SLED
RRUMC 4th Floor Patient Care Reconfiguration – BP 11 – Demolition, Concrete, Framing And Drywall
Solicitation # 907518.01
The Ronald Reagan UCLA Medical Center 4th Floor Patient Care Reconfiguration project, specifically Bid Package 11, focuses on the conversion of Behavioral Health spaces into Medical/Surgical spaces to expand inpatient bed capacity by up to 103 beds. The scope involves renovating approximately 67,400 square feet of the 115,600 square foot fourth floor, with work extending to the third and fifth floors, outdoor decks, and along Charles Young Drive. Key deliverables include complete selective demolition, concrete repair, metal stud framing, and the installation of level 4 drywall. Additionally, the contractor must provide design-build services for modifications to the existing pneumatic tube system and ensure all alterations meet ADA compliance, sustainability, safety, and security standards. The contract is a lump sum base bid awarded to the lowest responsive bidder, with the final sum calculated based on the base bid, unit prices, compensable delay rates, and any included alternates. Performance is subject to strict quality standards, including CBC/CFC and NFPA regulations, with final acceptance requiring a Letter of Completion from the University Representative after successful testing and submission of as-built diagrams. Bidders must be licensed California contractors and provide a UCIP Form 1-B regarding safety qualifications. The project requires adherence to prevailing wage laws, the provision of performance and payment bonds, and participation in a University Controlled Insurance Program. Bids are due by 2:00 p.m. on December 3, 2026.
The Regents of the University of California

POSTED

about 15 hours ago

DEADLINE

in 16 days
View Details

More opportunities from Virginia → Town of Bowling Green

Same awarding agency

NAICS: 238220
New
SLED
IFB IGSA #26-05 Building 179 NEC HVAC Replacement
Solicitation # IFB IGSA #26-05
The Town of Bowling Green, Virginia, is soliciting bids for the HVAC replacement project at the Network Enterprise Command (NEC) administrative Building 179, located at Fort A.P. Hill Garrison. The scope of work involves the demolition and removal of an existing 15-ton heat pump system and hot water coil auxiliary heat, and the installation of a new 10-ton heat pump and propane furnace system. This comprehensive installation includes all new ductwork, diffusers, refrigerant and propane lines, electrical disconnects, and breakers. All work must adhere to 2024 International Codes, NFPA 70, and NFPA 54, with final acceptance contingent upon successful testing, air balancing, and a DPW final inspection. The contract is a lump-sum award granted to the lowest responsive and responsible bidder. Bidders must provide a Virginia contractor license, evidence of five years of similar installation experience, and three comparable project references. Insurance requirements include Workers' Compensation, $500,000 in Employers' Liability, and $1,000,000 each for Commercial General and Automobile Liability. For projects exceeding $500,000, a 5% bid security is required, and performance and payment bonds for 100% of the contract value must be furnished. Bids must be submitted electronically via the eVA portal by December 14, 2026.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

4 days ago

DEADLINE

in 27 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS